20247
CONDITIONALCavan - Cavan County Council
Proposed Development
construct two storey dwelling, detached domestic garage, incorporate wastewater treatment system and percolation area, form new entrance to public road and carry out associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
30 Jun 2020
Decision: CONDITIONAL
18 Aug 2020
Decision due
24 Aug 2020
Grant issued
24 Sept 2020
Application Details
- Location
- Corcovety , Drung
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cavan County Council
- Site Area
- 0.303 ha
- Floor Area
- 256.7 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 30 June 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 August 2020
- Grant Date
- 24 September 2020
- Permission Expires
- 23 September 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to erect new industrial building for storage & maintenance purposes and all ancillary works
Cavanarainy , Drung , Co Cavan
to make alterations to an existing industrial building (Planning Ref No: 98855). The proposed works involve increasing the existing roof level, new dock leveller and alterations to the building elevations
Cavanarainy , Drung , Co Cavan
to erect new roof above two existing gravel storage enclosures and change of use to storage buildings for equipment and construction material
Cavanarainy , Drung , Co Cavan
to demolish 3 No. storage buildings and erect fully serviced industrial unit comprising of 2 storey administration & staff facility areas, single storey storage, parking, signage, landscaping, boundary treatments, connection to existing services and all ancillary and associated works
Cavanarainy , Drung , Co. Cavan
to construct a bovine milking facility, to include slatted livestock housing, dairy & underground washings tank, together with other ancillary spaces & associated ancillary site works, at Lislin (ED Drung), Lisboduff, Cootehill, Co. Cavan. The proposed works are within the curtilage of a protected structure, as per Appendix 19 (RPS No. CV0594) of the Cavan County Development plan (2022-2028). The proposal incorporates the demolition of said protected structure
Lislin (ED Drung) , Lisboduff Cootehill , Co. Cavan
to construct a bovine milking facility, to include slatted livestock housing, dairy & underground washings tank, together with other ancillary spaces & associated ancillary site works, at Lislin (ED Drung), Lisboduff, Cootehill, Co. Cavan. The proposal involves the demolition of a derelict dwelling.
Lislin (ED Drung) , Lisboduff Cootehill , Co. Cavan
construct an extension to the side of existing storage unit (approved under planning ref 19/35), erect a new attached separate storage unit incorporating administration & staff facilities, additional entrances & completion of service road to provide site access, parking, signage, landscaping, boundary treatments, connection to existing wastewater treatment system & percolation area, surface water connection to existing attenuation pond and all ancillary site works
Cavanarainy , Drung , Co. Cavan
for alterations to floor plans and elevations of buildings previously approved under planning reference numbers 19/35 and 23/60291, alterations to the site layout, boundaries and all ancillary siteworks
Cavanarainy , Drung , Co. Cavan
to erect fully serviced single storey storage facility building associated with existing DPD storage facilities, incorporating administration & staff facility areas, additional entrances & completion of service road to provide site access, parking, signage, landscaping, boundary treatments, upgrade existing septic tank to new mechanical wastewater treatment system & percolation area and all ancillary site works
Cavanarainy , Drung , Co. Cavan
to erect new industrial building for storage & maintenance purposes
Cavanarainy , Drung , Co Cavan
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?