20250
N/ALaois - Laois County Council
Proposed Development
retain a ront porch and entrance gate
View the full application file on the council's planning portal →Application Details
- Location
- Garrymore , Geashill , Co. Offaly R35A329
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Laois County Council
Timeline
- Registration Date
- 26 May 2020
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
retain front porch and entrance gate
Garrymore , Geashill , Co. Offaly
move the main site entrance from the edge of the site to the centre of the site's road frontage and close off the old entrance. The development will be of no greater contravention to the planning permission that was already granted for the existing entrance
Garrymore , Geashill , Co. Laois
move the main site entrance from the edge of the site to the centre of the site's road frontage and close off the old entrance. The development will be of no greater contravention to the planning permission that was already granted for the existing entrance
Garrymore , Geashill , Co. Laois
(a) retain and complete garage workshop. (b) retain the following: dry goods store, entrance, driveway and hard standing , clay mound, domestic garage as constructed and (c) PLANNING PERMISSION to reinstate pipe in existing drain and all associated site works
Garrymore , Geashill , Co.Laois
(a) permission to retain and complete garage workshop. (b) retain the following: dry goods store, entrance, driveway and hard standing , clay mound, domestic garage as constructed and (c) planning permission to reinstate pipe in existing drain and all associated site works
Garrymore , Greashill , Co.Laois
develop a wind farm and all associated site works within the townlands of Dernacart, Forest Upper and Forest Lower, Co. Laois. The development will consist of: up to 8 no. wind turbines with a tip height of up to 185 meters and all associated foundations and hardstanding areas; 1 no. on-site electrical substation, 1 no. temporary construction compound; all associated underground electrical and communications cabling connecting the turbines to the proposed on-site electrical substation; provision of new site access tracks and upgrading of existing access tracks and associated drainage; erection of 1 no. permanent meteorological mast of up to 110m in height; works to facilitate the delivery of turbines adjacent to the N80 within the townland of Dernacart and Forest Upper to include the laying of temporary surfacing; tree felling; and all associated site development works, ancillary works and equipment. Permission is sought for a period of 10 years and an operational life of 30 years from the date of commissioning of the entire wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been in prepared in respect of the proposed development.
Dernacart Forest Upper & Forest Lower , Co. Laois
permission to extend and renovate existing dwelling house, erect a new domestic garage and all associated site works
Laught , Geashill , Co. Laois R35 WEO6
retain the following 1). existing rear/side extension to existing dwelling, 2). existing domestic garage, 3). existing domestic fuel/storage shed, 4). existing rear splayed entrance
Garrymore , Geashill , Co.Laois
erect a cubicle shed and retain an underground slatted tank with all associated facilities and site works
Clonaghadoo , Geashill , Co. Offaly
construct a dwelling house, domestic garage, septic tank & percolation area, together with site entrance and all ancillary services
Cappaneary , Rosenallis , Co. Laois
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?