20284
REFUSEDSligo - Sligo County Council
Proposed Development
Development consisting of: (1) demolition of existing dwelling house and associated outbuildings, (2) construction of a four-storey Secondary Care and Education Centre comprising of education, counselling, rehabilitation and training rooms, reception area and toilets together with 25 No. supported independent living/bedroom units. Total floor area of the centre to be approx. 1160 sq. m. (3) associated site development works including upgrading of existing entrance, landscaping and on-site car parking
View the full application file on the council's planning portal →Application Timeline
Application received
24 Aug 2020
Decision: REFUSED
8 Oct 2020
Decision due
18 Oct 2020
Application Details
- Location
- Finisklin Road , Finisklin , Co Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.085 ha
Timeline
- Registration Date
- 24 August 2020
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 8 October 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
change of use of existing residential house to office space with store and for alterations and extension to existing building including relocation of existing site entrance, new site signage and all associated site works
Finisklin Road , Finisklin , Co. Sligo
free standing canopy at the loading bay at the east side of Unit No 1 St Colms Centre
Unit No 1 St Colms Centre , Finisklin , Sligo
development consisting of a Sub-division of a part of unit 10 and change of use from light industrial to warehouse with the inclusion of ancillary trade counters (for the sale of building related products principally to trade) the remainder of the building will remain light industrial. Proposed works are as follows: internally the mezzanine level in the rear return will be removed. There would be trade counters inserted along with a proposed new access to the south of the unit. Externally and to the north of the building new bollards on "goods in" entrance; new mechanical plant area; on the south elevation new opening and access doors to service the trade counters and some levelling works along the footpath as well as remarking parking spaces to create a " clear area" and disabled space to the south of the building; block up the entrance on the east elevation. Proposed signage on the south elevation. All other ancillary works to complete the development
Unit 10 St. Colm's Centre , Finisklin Business Park , Sligo
Development consisting of the demolition of a cold store extension (217 sqm gross floor area) to the rear of existing mixed use building (1,426 sqm gross floor area) with elevation alterations including a new entrance, reconfigured existing entrance with new canopies over both, new window opes, and new exterior finishes to the mixed use building, site works to include reconfigured surface car park to front and rear of building with proposed total of 42 no. car park spaces and 20 no cycle spaces along with all associated site development and landscaping works.
Unit 10 , Saint Colm's Centre , Finisklin Business Park
Change of use from a coal yard to a recycling facility. This includes the demolition of an existing storage building (287m2) and the construction of a proposed recycling facility (1124m2). The proposed development also includes: Construction of a maintenance shed (287m2), 3 no. storage containers (3 x 26.5m2), skip storage areas, 15 no. car parking spaces including 1 no. EV charging space and 1 no. accessible parking space, 8 no. truck parking spaces, covered bicycle stand for 5 no. bicycles, 1 no. new weighbridge and associated weighbridge office, security fencing on part of northwestern boundary, connections to all existing services, all ancillary site works. A Natura Impact Statement will be submitted to the planning authority with the planning application
Deepwater Quay , Sligo , Co. Sligo
development consisting of the Material Change of Use from Office use to Medical Clinic
Unit 8 , Beulah Buildings , Finisklin Road
development consisting of: 1.The demolition of a portion of the existing industrial units (B & C)(810SQM) to facilitate the construction, in their place, of a new portal frame unit (unit B), similar in height to the main retained unit (A). 2. The re-cladding of the retained industrial unit (A) along with new glazed openings and access doors. The building will be clad with profiled insulated metal cladding. 3. The resurfacing and upgrading of the associated service yard, the access route from Finisklin road and existing car parking to facilitate the new development and the provision of secure and sheltered bicycle parking with additional staff car parking spaces to the rear of the site. 4. All associated site and civil works including rainwater attenuation.
Finisklin Road , Finisklin Business Park , Sligo
for development consisting of (i) The construction of an ESB sub-station, (ii) The construction of an external yard/plant area to the rear of the existing building, (iii) The provision of a bicycle storage shed, (iv) The provision of a smoking hut, (v) Extension to, and completion of access roads to the site, (vi) Demolition of small out-building, (vii) The provision of public lighting on the site, (viii) An underground surface water sewer network including on-site attenuation and petrol/oil interceptor(s) and connections to existing surface water infrastructure, (ix) Corporates signage, (x) 3 no.flagpoles, (xI) 2 no. automated traffic barriers & site fencing/gates, (xii) Elevational changes to existing industrial unit, (xiii) Additional floor space to first floor, (xiv) Porches, and connections to services and all ancillary works
Site Number 2 , IDA Finisklin Business Park , Finisklin
(a protected structure RPS no.301 SE), application site area 1.087 ha. The development consists of retention of demolition of existing concrete block wall and partial demolition of stone masonry wall within the curtilage of the protected structure, and will consist of proposed revisions to layout of existing car park and yard areas, including those within the curtilage of the protected structure, to provide a total of 100 no. car parking spaces comprised of an additional 30 no. car parking spaces, comprised of 28 no. car parking spaces within the carpark, and 2 no. car parking spaces accessed from Deepwater Quay; amendments to existing 70 no. car parking spaces to include revised layout to delineate 12 no. Informal car parking spaces, increase the number of accessible car parking spaces, the addition of bollards to delineate car park and yard areas, and new palisade fence to form revised boundary to yard to protected structure; works to stabilise stone masonry wall within the curtilage of the protected structure, and all associated ancillary site works and services. No works are proposed to the protected structure
Homeland Plus Deepwater Quay Sligo and Former Bachelor’s Factory Deepwater Quay Sligo F91 HR53 ,
1. The amalgamation of two existing industrial warehouse units (unit 6 – 308 m2, unit 7 - 347.18 m2) with an existing parking and service area into an enlarged single unit – 772.42 m2, and the associated demolition / removal of the existing party wall, internal stairs, partitions walls, office enclosure, toilet areas, ceiling and mezzanine floor areas (81.82 m2). 2. Change of use for the new enlarged unit from light industrial use to a builders’ merchant / trade counter depot with ancillary warehouse, showroom/display, office and staff facilities. 3. Proposed works to include all necessary site and associated development works, including construction of a new mezzanine floor of 187 m2 and internal stair access, minor modifications to the elevations to include a new customer entrance with associated signage behind the existing roller shutter doors, widening of the existing roller shutter door opening, external signage and associated lighting, and a new fire escape door
Units 6 and 7 , Finisklin Road , Sligo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?