CONDITIONALSligo - Sligo County Council
Proposed Development
development consisting of construction of a new forestry road entrance including all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
11 Feb 2020
Decision: CONDITIONAL
27 Mar 2020
Decision due
6 Apr 2020
Grant issued
2 Jul 2020
Application Details
- Location
- Glen , Ballynashee , Co. Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
Timeline
- Registration Date
- 11 February 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 27 March 2020
- Grant Date
- 2 July 2020
- Permission Expires
- 1 July 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for development consisting of laying an underground 38kV electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm with the townlands of Derrysallagh and Glen, Co. Sligo (Planning Ref: PL 12/133) to the National electricity grid via the existing Garvagh 110kV substation in the townland of Seltan, County Leitrim. Part of the development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). The proposed development within the jurisdiction of Sligo County Council for which Permission is sought include the following: Installation of approx 0.69km of underground cable ducting, 2 no. joint bays and ancillary development laid primarily within the public road corridor with a section of ducting to be installed within a steel box structure to be fixed to Boleymaguire Bridge within the townlands of Carrowcashel, Co. Sligo and Boleymaguire, Co. Leitrim. Within the townlands of Tullynure and Carrowcashel, permission is sought for the carrying out of remedial works to approx 1.28 km of the installed underground cable ducting which is subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). Remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following completion of the civil works
Carrowcashel Tullynure Glen Straduff , and Ballynashee , Sligo
Development consisting of laying an underground 38kV Electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm within the townlands of Derrysallagh and Glen, Co Sligo (Sligo County Council Planning Reference PL12/133) to the National electricity grid via the existing Garvagh 110 kV substation in the townland of Seltan, County Leitrim. Part of this development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP-300811- 18). The proposed development within the jurisdiction of County Sligo for which Permission is sought includes the following: Installation of approximately 0.69 km of underground cable ducting, 2 No. joint bays and ancillary development laid primarily within the public road corridor with a section of ducting to be installed within a steel box structure to be fixed to Boleymaguire Bridge within the townlands of Carrowcashel, Co Sligo and Boleymaguire, Co Leitrim. Within the townlands of Tullynure and Carrowcashel, permission is sought for the carrying out of remedial works to approximately 1.28km of the installed underground cable ducting which is subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP-300811-18). Remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following completion of the civil works. This application is accompanied by an Environmental Impact Assessment Report (EIAR) / Environmental Impact Statement (EIS).
Carrowcashel Tullynure , Glen and Ballynashee
for development consisting of retention of infrastructure. The elements are to be retained for the lifetime of the wind farm. The development consists of blade delivery trestles constructed at the turbine crane hardstands required for the set down and storage of turbine blades at each location, passing bays required for vehicles to pass each other on-site and upgrade and use of 154m of pre-existing tract between Turbines T9 and T10. The retention of these structures is required for continued maintenance of turbines on site.
Townlands of Glen Knockroe , Derrysallagh and Rover , (E.D. Ballynashee) Co Sligo
Development of infrastructure at Derrysallagh Wind Farm consisting of installation of a Storage Container and Site Office/Canteen Portacabin on a gravel area with concrete access paths and associated site works, adjacent to existing Substation and Compound.
Glen , (E.D. Ballynashee) , Co Sligo
development consisting of (i) retention of a meteorological mast, with an overall height of 31 metres, supported by guy wires for the purpose of measuring and recording meterological data, (ii) concrete mast foundation and anchors; (iii) approximately 40m of underground electricity and telecommunications cabling; and (iv) all associated site development and reinstatement works
Knockroe (Ballynashee ED) , Co. Sligo
the installation of approximately 0.38km of underground cable ducting and ancillary development laid within private lands within the townland of Gubbarudda. Permission is also sought for the installation of the electricity cable following completion of the civil works. (This application is accompanied by an Environmental Impact Assessment Report (EIAR) / Environmental Impact Statement (EIS))
Gubbarudda , Co. Roscommon
the development will consist of the laying of underground 38 kV electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm within the townlands of Derrysallagh and Glen, County Sligo (Sligo County Council Planning Reference PL12/133) to the National electricity grid via the existing Garvagh 110kV substation in the townland of Seltan, County Leitrim. Part of this development is in place and subject to a pending application for Substitutte Consent to An Bord Pleanala (Ref: ABP-300811-18). The proposed development within the jurisdiction of Co. Roscommon for which permission is sought includes the following: Installation of approximately 0.38 km of underground cable ducting and ancillary development laid within private lands within the townland of Gubbarudda. Permission is also sought for the installation of the electricity cable following completion of the civil works. This application is accompanied by an Environmental Imapat Assessment Report (EIAR)/Environmental Impact Statement (EIS) at
Gubbarudda , Co. Roscommon
the development will consist of the laying of underground 38kV electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm within the townlands of Derrysallagh and Glen, County Sligo (Sligo County Council Planning Reference PL12/133) to the National electricity grid via the existing Garvagh 110kV substation in the townland of Seltan, County Leitrim. Part of this development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP-300811-18). The proposed development within the jurisdiction of Co. Roscommon for which permission is sought includes the following: Installation of approximately 0.38km of underground cable ducting and ancillary development laid within private lands within the townland of Gubbarudda. Permission is also sought for the installation of the electricity cable following completion of the civil works. This application is accompanied by an Environmental Impact Assessment Report (EIAR) /Environmental Impact Statement at
Gubbarudda , Co. Roscommon
the development will consist of the laying of underground 38kV electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wiind Farm within the townlands of Derrysallagh and Glen, County Sligo (Sligo County Council Planning Reference PL12/133) to the National electricity grid via the existing Garvagh 110kV substation in the townland of Seltan, County Leitrim. Part of this development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (REf:ABP-300118-18). The proposed development within the jurisdiction of Co. Roscommon for which permission is sought includes the following: Installation of approximately 0.38km of underground cable ducting and ancillary development laid within private lands within the townland of Gubbaruda. Permission is also sought for the installation of the electricity cable following completion of the civil works. This application is accompanied by an Environmental Impact Assessment Report (EIAT) /Environmental Impact Statement ( EIS) at
Gubbarudda , Co. Roscommon
Retention of access track c.96m long, as entrance to Derrysallagh Wind Farm. Permission to construct 15m long stone clad concrete block walls at each side of entrance, construction of 7m wide barrier and signage at entrance, construction of double gates at exit from track at
Gubbarudda Td. , Arigna , Co. Roscommon
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?