The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

20302

CONDITIONAL

Galway - Galway County Council

Proposed Development

of a singe storey conservatory side extension at the side of a 2 storey dwelling. Gross floor space of work to be retained: 15.70 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Mar 2020

  2. Decision: CONDITIONAL

    25 Jun 2020

  3. Decision due

    29 Jun 2020

  4. Grant issued

    10 Aug 2020

Application Details

Location
Garraun Lower ,
Applicant
N/A
Application Type
RETENTION
Planning Authority
Galway County Council
Site Area
0.27 ha
Floor Area
15.7 sq m
Residential Units
1

Timeline

Registration Date
10 March 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 June 2020
Grant Date
10 August 2020
Permission Expires
9 August 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

256m
181778CONDITIONAL12 Dec 2018

to erect dwelling house, domestic garage, waste water treatment system, percolation area and all associated services. Gross floor space of proposed works: House - 213.5 sqm; Garage - 37.5 sqm

Garraun Lower ,

285m
201063CONDITIONAL31 Jul 2020

to 1) modify and extend existing dwelling house including the demolition of existing extensions to rear, 2) build new domestic garage 3) build new barbeque area and 4) install new wastewater treatment system, polishing filter and all associated services. Gross floor space of proposed works; 209sqm + 59.80sqm + 35sqm, Gross floor space of work to be retained; 126sqm, Gross floor space of any demolition; 59.50sqm

Garraun Lower Maree ,

393m
2260265CONDITIONAL23 Mar 2022

Permission to (1) Retain changes to approved garage and (2) Retain changes to elevations of existing dwelling house previously approved under Planning Reg. Ref. No’s 96/2777 & 06/1013 at Garraun Lower, Maree, Oranmore, Co. Galway.

Garraun Lower ,

420m
1962CONDITIONAL18 Jan 2019

to construct new access road to facilitate deliveries to rear of food store

Garraun Lower ,

420m
2261103CONDITIONAL3 Nov 2022

(1) of existing single storey extension to rear of hardware as part kitchen, (2) Retention of change of use of store/hardware to part kitchen, (3) Change of use of existing store/hardware to coffee shop, (4) new link between coffee shop and foodstore including modifications to internal layout and (5) upgrading of existing septic tank and percolation area to new treatment system and polishing filter.Gross floor space of work to be retained 84.50sqm.

Garraun Lower , Maree Oranmore , Co. Galway

422m
181779CONDITIONAL12 Dec 2018

to retain changes to 2 no. apartments including attic conversions (previously approved under Planning Ref: 04/2053). Gross floor space of work to be retained: 95.75 sqm

Garraun Lower ,

442m
22773CONDITIONAL15 Jun 2022

to (1) demolish existing substandard dwelling house and (2) erect new dwelling house, domestic garage, waste water treatment system, polishing filter and all associated services. Gross floor space of proposed works: 232.2sqm + 50sqm

Garraun Upper ,

442m
2561227REFUSED1 Sept 2025

for modifications (change of house plan) to planning permission reference # 22/773 granted for demolition of substandard existing dwelling house, and construction of new dwelling, garage, wastewater treatment unit/percolation area and all associated services

Garraun Upper , Oranmore , Co Galway

444m
2361129CONDITIONAL20 Sept 2023

for the construction of a dwellinghouse, domestic garage, proprietary treatment system, percolation area & for all ancillary services & site works

Ahapouleen , Clarinbridge , Co. Galway

445m
2561490CONDITIONAL13 Oct 2025

for the construction of a single dwellinghouse, domestic garage, proprietary wastewater effluent treatment unit, percolation area and all associated site services

Garraun Lower , Maree Oranmore , Co. Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?