20360

CONDITIONAL

Limerick - Limerick County Council

Proposed Development

an existing 25m high telecommunications support structure (total height with antennas 26.7m) carrying telecommunications equipment, together with existing equipment container and associated equipment within a fenced compound as previously granted under local authority reference 11/1047. The development will continue to form part of Meteor Mobile Communications Ltd. existing and future telecommunications and broadband network

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 May 2020

  2. Decision due

    30 Jun 2020

  3. Decision: CONDITIONAL

    3 Jul 2020

  4. Grant issued

    6 Aug 2020

Application Details

Location
Islandea , Adare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Limerick County Council

Timeline

Registration Date
6 May 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 July 2020
Grant Date
6 August 2020
Permission Expires
5 August 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

42m
21255CONDITIONAL4 Mar 2021

an existing telecommunications support structure(previously granted permission under Planning ref. 11/250 Limerick County Council), together with antennas, dishes, equipment cabinets, fencing, access gate and track and all associated site development works. The development will continue to provide high speed wireless broadband and data services

Frost Farm , Islandea , Adare Co. Limerick

414m
177046CONDITIONAL18 Oct 2017

Extension of Permission from Ref No. 13/329 : the modification and extension of existing dwelling house, construction of a garage, installation of a waste water treatment system and percolation area to replace existing septic tank and all associated site development works

Ardshanbally , Adare

418m
177021N/A18 May 2017

Extension of Permission from Ref No 13/329 (the modification and extension of existing dwelling house, construction of a garage, installation of a waste water treatment system and percolation area to replace existing septic tank and all associated site development works)

Ardshanbally , Adare

826m
23201CONDITIONAL12 Apr 2023

the development that consists of: Works to raise the height of the River Maigue Railway Bridge, the former Adare Railway Station platform and associated roadworks and level crossing works. The works shall include: (a) River Maigue Railway Bridge - increase height of existing bridge a protected structure, including alterations to the existing abutments, piers and adjacent existing railway embankments, (b) Former Adare Railway Station Platform - increase the level of part of the existing platform associated with former Adare Railway Station a protected structure, to match new height of the River Maigue Railway Bridge, including provision of retaining wall, timber fencing, security fencing, drainage channel and retention of original copping stones, (c) Road Lift - alterations to existing road L1423, a former canal, to raise the road and railway level crossing to match new level of the River Maigue Railway Bridge, including reconstruction of the road, footpath, kerbs and walls, installation of retaining walls, road restraint system, road drainage and line marking, (d) Railway Embankment - increase height of existing railway embankments to match new level of the River Maigue Railway Bridge and level crossing including installation of retaining walls and alterations to existing railway embankments, (e) Railway Level Crossing - installation of signage, barriers, traffic guidance signage, road traffic lights, line marking, Relocatable Electrical Building and associated fencing, (f) Quay Interface - alterations to existing car park and former Quay a protected structure and car park, including alteration to existing height restriction barriers, provision of new kerbs and footpath, resurfacing of level from road into carpark and installation of new infrastructure for public lighting, line marking and drainage. The River Maigue Railway Bridge is a Protected Structure. This planning application is accompanied by an Environmental Impact Assessment Screening report and a Natura Impact Statement

River Maigue Railway Bridge and Level Crossing on L1423 Ardshanbally , Islandea , Adare

863m
2360222REFUSED12 Apr 2023

a dwelling house Circa 230 m2, entrance/access from the public roadway, treatment plant and percolation area and all associated site works. The proposed development site is within the curtilage of a protected structure (Ardshanbally House R.PS. Ref. no. 839)

Ardshanbally , Adare , Co. Limerick

884m
2460825CONDITIONAL18 Aug 2024

the construction of a granny flat to the side / front of Dwelling; with all associated site works

6 Manor Court , Adare , Co. Limerick

909m
191200CONDITIONAL4 Dec 2019

demolition of existing inlet works and pumping station. Construction of a new inlet works, inlet and storm and final effluent pumping stations, storm tank, control building and all ancillary site works

Adare Waste Water Treatment Plant , Adare , Co. Limerick.

930m
17111CONDITIONAL9 Feb 2017

the construction of single storey extensions to the front and rear of the existing dwelling, alterations to the boundary wall height, and associated site works

8 Manor Court , Blackabbey , Adare Co Limerick

957m
25170CONDITIONAL3 Jun 2025

construction of a single storey extension at the rear and side of the existing dwelling and all associated site works

19 Manor Court , Adare , Co. Limerick.

959m
211409CONDITIONAL11 Oct 2021

construction of an extension to the side of the existing dwelling and all associated site works

19 Manor Court , Station Road , Adare Co. Limerick

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?