2038
CONDITIONALGalway - Galway City Council
Proposed Development
Retention planning permission is sought for the development which will consist of the retention of flue at rear of building
View the full application file on the council's planning portal →Application Timeline
Application received
20 Feb 2020
Decision: CONDITIONAL
30 Mar 2020
Decision due
15 Apr 2020
Grant issued
24 Jun 2020
Application Details
- Location
- Unit 5 Royal Rock Industrial Estate 1 , Ballybane Industrial Estate , Galway
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Galway City Council
- Site Area
- 0.009 ha
- Floor Area
- 100 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 20 February 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 30 March 2020
- Grant Date
- 24 June 2020
- Permission Expires
- 23 June 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for development which will consist of the retention of a new doorway with an integrated roller shutter and associated external works
Units 1 & 2 , Royal Rock Estate 1 , Ballybane Industrial Estate
Permission for development which consists of the installation of 32 no. solar panels on a steel frame ( covering an area of c. 62sqm to a maximum height of 4.2sqm above ground level ). Works to consist of all ancillary development works, including steel columns
ESBs existing Galway 110kv Substation , Bothar na Mine , Ballybane Industrial Estate
Permission for the erection of a warehouse building and the erection of a link structure between the proposed warehouse building and an existing retail building. The proposed development also includes for the erection of a link structure between 2 no. existing warehouse buildings all
Bóthar na Mine , Ballybaan Beg , Galway
Permission for development which will consist of: the construction of a new twelve bay 110kV Gas Insulated Switchgear (GIS) building located entirely within the southern portion of the existing Galway 110kV Substation. The proposed GIS building will measure approximately 700 sq.m. with a height of approximately 15 meters; associated development includes: the replacement of three existing 110kV Overhead Line Towers within the substation with three Line Cable Interface Masts (LCIM) proximate to the existing towers to facilitate access of existing transmission circuits to the proposed GIS building by means of underground cables; provision of a temporary internal access route, and vehicular access gate at the south-eastern boundary of the existing substation site to facilitate construction activities. This internal access route and gate will be removed and the substation boundary reinstated upon completion of the development; improvements to the existing vehicular access arrangements on the south-western boundary of the existing substation, in particular reducing the total number of existing vehicular entrances from two to one at this location; associated boundary treatment to the existing south-eastern, southern and south-western substation boundaries, in particular the construction of a new 3m high wall along these boundaries; all associated and ancillary development and site works including provision and/or replacement of electrical equipment, drainage works, laying of new or replacement cables and the diversion of existing cables
Galway 110kV Electrical Substation , Ballybane Industrial Estate , Bothar na Mine (Townland of Ballybaan Beg)
Permission for development which consists of: Planning Permission for the retention of alterations and changes to Unit 18, Glenrock Business Park for use as warehousing /storage, distribution, retail of a type and scale appropriate to the area, offices /specialist offices, light industry and all other uses compatible with CI Zoned lands The Alterations and Changes to be retained are as follows: 1) Glazed Front Entrance Porch on South-West Elevation of Unit 18 2) Ground Floor Single Story Extension (Ancillary Office Space) to North-West Elevation of Unit 18 3) Roller Shutter Door and Canopy Roof over loading area to North-East Elevation of Unit 18 4) Signage to South-West Elevation of Unit 18 5) Minor elevational changes to those approved under Pl. Ref: 05/715 6) All ancillary Site Works and Site Services
Unit 18 Glenrock Business Park , Bothar na Mine , Galway
Permission for Development which will consist of a change of use of the property to a warehouse with ancillary trade counters (for the sale of building related products principally to trade): external changes including the conversion of the current staff entrance to a goods in entrance and construction of a service ramp: conversion of the current, roller shuttered, delivery entrance to an access servicing the trade counters, marking out parking and delivery area and any other ancillary works to facilitate the development
Ballybane Industrial Estate , Bothar na Mine , Galway
Permission for a 10 year planning permission for development. The proposed development comprises 3 no, office blocks and a café (c. 17,433sq. m GFA including basement and plant rooms) as follows: Block 1 (c. 10,225 sq. m) is an 8-storey office building providing offices, stair and lift cores and plant rooms. Block 2 (c. 4,081 sq. m) is a 6-storey office building over basement comprising stair and lift cores and plant rooms. Block 3 (c. 2,995 sq. m) is a 5-storey office building over basement comprising stair and lift cores and plant rooms. The Café (c. 77sq. m) is a single storey building which incorporates a seating area, storage area and toilets. The development includes a surface car parking accommodating 421 no car spaces and 120 no. cycle spaces. Vehicular access is provided from Bóthar Na Mine and the city East Ballybrit Business Park Road incorporating anew internal access road. The proposed development includes for the provision of 2 no. ESB substations and also includes for the full and partial demolition of existing buildings and structures on the site (c.2,614 sq.m), as well as all associated site development works, boundary treatments, landscaping and connection to existing services
City East , Ballybrit Business Park Road , Ballybaan Beg
Permission for development which consists of: to retain a building as constructed. The works to be retained include the following: • The change of use of part of the ground floor from warehouse to office use, • The provision of a mezzanine floor for office use, • To change the use of the first floor from storage to office use. • Provision of a ventilation grill to the front elevation
Glenrock House , Unit 9 Glenrock Business Park , Bothar na Minne Galway
Planning Permission is sought for the development which will consist of two no. 3-bedroom 2-storey houses which will share an entrance with two previously approved houses (Pl. ref. 16/332, currently under construction) with the inclusion of 2no. additional shared parking spaces, together with all associated drainage and site works
Monivea Road , Galway
Permission for development which consists of to extend and renovate an existing dwelling house. The works will include: 1. The construction of an extension to the side of the existing dwelling 2. To carry out internal and external renovations to the existing dwelling along with all associated site works
114 Monivea Park , Ballybane , Galway
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?