The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2042

N/A

Clare - Clare County Council

Proposed Development

(Planning Ref 17/916) to construct a dwelling house (B) Planning Permission to construct a domestic garage, including all associated site development works and connections to public services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Jan 2020

  2. Further information requested

    12 Mar 2020

  3. Application withdrawn

    6 Jan 2021

Application Details

Location
Garrran Na Coille , Claureen , Ennis
Applicant
N/A
Application Type
PERMISSION CONSEQUENT
Planning Authority
Clare County Council
Floor Area
180 sq m
Residential Units
1

Timeline

Registration Date
30 January 2020
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
6 January 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20356CONDITIONAL4 Jun 2020

to construct a dwelling house and domestic garage including all associated site development works and services

Garran Na Coille , Claureen , Ennis

0m
17916CONDITIONAL27 Nov 2017

to construct dwelling house with all ancillary site works including new entrance from Garran na Coille

Garran na Coille , Claureen , Ennis

31m
21217CONDITIONAL12 Mar 2021

to construct a single dwelling house, connection to public services and ancillary site works

Shanaway Road , Claureen , Ennis Co Clare

32m
21939CONDITIONAL7 Sept 2021

for a change of house design granted planning permission under Planning Reference No. P21/217

Shanaway Road , Claureen , Ennis Co Clare

33m
19210CONDITIONAL25 Mar 2019

for development which will consist of the construction of a dwelling house, garage, ancillary site work and connection to public services

Shanaway Road , Claureen , Ennis

34m
19715CONDITIONAL12 Sept 2019

for development which will consist of a revised dwelling house design, including amendments to site layout and floor level and the omission of garage, all to that previously granted under planning reference P19-210

Shanaway Road , Claureen , Ennis

37m
17417CONDITIONAL29 May 2017

for the proposed construction of a new detached garage and ancillary site works

37 Garrán na Coille , Shanaway Road , Ennis

42m
17919CONDITIONAL28 Nov 2017

on the Grant of Outline Permission (Ref 14-659 ) to construct a dwelling house and domestic garage including connections to public services together with associated site works

Shanaway Road , Claureen , Ennis

82m
2660411CONDITIONAL24 Jun 2026

for the construction of single storey extensions to the side and rear of the existing house, modifications to the front elevation and all ancillary site works

32 Garrán Na Coille , Shanaway Road , Ennis Co. Clare

169m
258006UNCONDITIONAL27 Jun 2025

to carry out the following development: The proposed development will include: 1) Construction of Mini Roundabout at the junction of the N85 and the L4601 Shanaway Road. 2) 2 No. raised controlled pedestrian crossings on the N85 with central Islands. 3) 1 No. uncontrolled pedestrian crossing on the L4601 Shanaway Road. 4) Installation of additional public lighting columns and associated ancillary works to tie into existing public lighting system. 5) Installation of new gullies, tapping into existing surface drainage system. 6) Provision of associated Signage and Road Markings. 7) All associated and ancillary site works. In accordance with the Birds and Natural Habitats Directive, Screening for Appropriate Assessment has been carried out on the project. An Environmental Impact Assessment (EIA) screening statement has been prepared and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.

N85/Shanaway Road Junction , Claureen , Ennis Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?