The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2044

CONDITIONAL

Sligo - Sligo County Council

Proposed Development

development consisting of the change of plans of dwelling house previously granted (Planning File Reference PL09/584)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Feb 2020

  2. Decision: CONDITIONAL

    9 Apr 2020

  3. Decision due

    12 Apr 2020

  4. Grant issued

    7 Jul 2020

Application Details

Location
Lislary , Ballinfull , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.505 ha

Timeline

Registration Date
17 February 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 April 2020
Grant Date
7 July 2020
Permission Expires
6 July 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

34m
17429REFUSED16 Nov 2017

for development consisting of the construction of dwelling house and garage with proprietary effluent treatment (p.e.t) system and percolation area

Lislary , Ballinfull , Co. Sligo

34m
17269REFUSED14 Jul 2017

development consisting of the construction of dwelling house and garge with proprietary effluent treatment (p.e.t) system and percolation area

Lislary , Ballinfull , Co. Sligo

295m
2460495CONDITIONAL20 Dec 2024

construction of new dwelling house with septic tank and percolation area and all associated site works

Ardtrasna , Ballinfull , Co. Sligo

491m
17167CONDITIONAL8 May 2017

development consisting of the construction of a single domestic dwelling, waste water treatment system and percolation area and all associated site works

Lislarry , Ballinfull , Co. Sligo

506m
2560500N/A3 Dec 2025

Construct a Slatted House with ancillary concrete slab, including all ancillary site works and services on this site at the above address

Ardtrasna , Ballinfull , Co. Sligo

553m
2196CONDITIONAL19 Mar 2021

development consisting of the construction of a single storey extension to the existing dwelling, a new proprietery wastewater treatment plant and polishing filter and all associated site works

Ardtrasna , Ballinfull , Co. Sligo

559m
22377CONDITIONAL14 Nov 2022

1) The construction of an extension to the rear of the existing dwelling, 2) First floor attic conversion, from storage to habitable rooms, including new gable windows. 3) Upgrade existing wastewater treatment system on site, consisting of a mechanical aeration system with packaged tertiary treatment system and decommission existing septic tank on site. Includes all associated site works.

Lislary , Ballinfull , Co Sligo

616m
19179CONDITIONAL8 May 2019

for development consisting of the demolition of an existing cottage and the construction of a replacement single-storey dwelling house, a new shed building and a greenhouse, as well as a proprietary effluent treatment system, percolation area, and all associated site works and use of existing vehicular entrance and out-building

Ballinful , Co. Sligo

643m
18471CONDITIONAL3 Dec 2018

Development consisting of construction of dwelling house with proprietary effluent treatment (p.e.t) system and percolation area.

Lislary , Ballinfull , Co. Sligo

787m
2660254REFUSED26 Jun 2026

the construction of a new single-storey family dwelling, separate single-storey garage, waste water treatment system with percolation area, improvements to existing vehicle entrance and all associated ancillary site works and landscaping

Attiduff , Maugherow , Co. Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?