Proposed Development
chun '10 Glamping Pods' a thogail sa ionad campála atá ann. Spás urláir comhlán na n-oibreacha beartaithe i 105 sqm
View the full application file on the council's planning portal →Application Timeline
Application received
9 Apr 2020
Further information requested
6 Jul 2020
Application withdrawn
15 Jan 2021
Application Details
- Location
- Inis Oirr ,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 1.39 ha
Timeline
- Registration Date
- 9 April 2020
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 15 January 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for construction of proposed ball wall and associated works
Inis Oírr , Oileáin Árann , Co. Galway
for the retention of a dwelling house and septic tank/effluent treatment system and to construct a percolation area/polishing filter and all associated services. Gross floor space of works: House 193.05 sqm
Inish Oirr , Castle Village , Co. Galway
of a dwelling house, septic tank/effluent treatment system and to construct a percolation area/polishing filter and all associated services
Inis Oírr , Castle Village , Co. Galway
for demolition of an existing stone and rubble cottage, the construction of a replacement dwelling in the same location, and the installation of a replacement waste water treatment system and polishing filter, and all associated site works. Gross floor space of proposed works: 220 sqm. Gross floor space of any demolition: 125 sqm
Castle Village Inis Oirr ,
for demolition of an existing stone and rubble cottage, the construction of a replacement dwelling in the same location, and the installation of a replacement waste water treatment system and polishing filter, and all associated site works
Castle Village Inis Oirr ,
for development to include provision of: (A) 1 no. raw water storage tank of approximately 637sqm with an overall height of approximately 5.4m (approximately 4.3m without handrail): (B) Associated site development works, including; hardstand areas, upgrade of existing site drainage system, provision of a temporary contractor's area, all necessary ancillary pipework, mechanical and electrical services, instrumentation and automation. All of the above is proposed on a site of approx. 0.13hectare
Inis Oírr ,
for minor modifications to existing planning permission (planning reg. ref. no. 11/168) to include the following: (a) relocation of proposed percolation area to adjoining land for proposed new Bison wastewater treatment plant and associated site development works (b) relocation of proposed new soak hole / rain water harvesting system to adjoining land. Previous Planning Reference No. 12/1549.
Inisheer ,
to decommission old outdated sewage system and install new sewage treatment plant and tertiary polishing filter and all associated works
Inis Oírr , Inis Oírr , Aran Islands
for modifications to an existing planning permission granted under PL. Ref. No. 11/168 and extended under PL. Ref. 15/116. As per the previously granted proposal, the proposed works will increase the total number of bedrooms from 14 to 16. The proposed works to the existing hotel will include the following: (a) minor modifications to the internal layout at ground floor level and 6.7 sqm. of proposed new ground floor area to allow for corridor access to a relocated toilet block (b) the demolition of part of an existing ground floor store to accommodate a new external stairs to serve the first floor. The proposed area for demolition is 9 sqm. (c) the provision of new windows to the existing south-east (side) and north-east (front) elevation (d) minor modifications to the internal layout at first floor level and 270.3 sqm. of proposed new first floor area (e) the provision of new roof windows to the existing roofs and walls of the north-west (side) elevation (f) all associated site development works. Gross floor space of proposed works 277 sqm. demolition 9sqm
Inis Oírr ,
for (A) 1 no. elevated raw water storage tank of approximately 1,271sqm with an overall height of approximately 9.0m (approximately 7.9m without handrail), (B) 1 no. raw water storage tank of approximately 857sqm with an overall height of approximately 5.4m (approximately 4.3m without handrail), (C) 2 no. chemical storage units of approximately 6.8sqm and 5.0sqm with heights of approximately 2.7m and 2.75m respectively (D) 1 no. filter backwash tank of approximately 4.3m with an overall height of approximately 4.4m (approximately 3.3m without handrail) (E) Relocation of storage unit of approximately 15sqm with an overall height of approximately 3m (F) Retention of existing treatment control building of approximately 43sqm with height of approximately 3.4m (G) Associated site development works, including hardstand areas, upgrade of existing site drainage system, provision of a temporary contractor's area, all necessary ancillary pipework, mechanical and electrical services, instrumentation and automation. All of the above is proposed on a site of approximately 0.93 hectare.
Inis Oírr ,
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.