The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2050001

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

REVISION TO PREVIOUSLY APPROVED PERMISSION (PLAN. REF. NO. 13/80091, EXTENDED UNDER PLAN. REF. NO. 19/50059 REFERS) CONSISTING OF CONSTRUCTION OF A NEW BIOMASS HEATING CENTRE, AS PART OF THE NORTH-WEST REGIONAL SCIENCE PARK PROJECT. SITE C.056HA LOCATED WEST OF THE MAIN BUILDING OF LETTERKENNY IT CAMPUS. THE FOOTPRINT OF THE BUILDING REMAINS UNCHANGED. THE LOCATION HAS BEEN MODIFIED IN ORDER TO ALLOW FOR FUTURE EXTENSION TO THE LYIT CAMPUS BUILDING AND "GREENWAY" ROUTE. THE 83 SPACE CAR-PARKING AREA INCLUDED IN THE ORIGINAL GRANT OF PERMISSION HAS BEEN REMOVED

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Jan 2020

  2. Decision due

    27 Feb 2020

  3. Decision: CONDITIONAL

    27 Feb 2020

  4. Grant issued

    20 Apr 2020

Application Details

Location
PORT ROAD , LETTERKENNY , LETTERKENNY PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.056 ha

Timeline

Registration Date
3 January 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 February 2020
Grant Date
20 April 2020
Permission Expires
2 April 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

72m
2461344CONDITIONAL2 Sept 2024

DEVELOPMENT ON A SITE EXTENDING TO 1.08 HECTARES CONSISTING OF THE FOLLOWING: (1) CONSTRUCTION OF A 3-STOREY LIBRARY, IT AND GENERAL EDUCATION BUILDING (5156 SQM) COMPRISING READING ROOMS/BOOK STACKS, GENERAL AND SPECIALIST TEACHING SPACES (LECTURE THEATRE, CLASSROOMS, COMPUTER LABS, GROUP STUDY ROOMS ETC.), STAFF OFFICES, ADMINISTRATION SPACES AND ANCILLARY SERVICE AREAS WITH SCREENED ROOF LEVEL PLANT, (2) PROVISION OF A NORTH-SOUTH GREENWAY (BICYCLE PATH/PEDESTRIAN WALKWAY), (3) PROVISION OF A GAS COMPOUND (49.88 SQM) LOCATED WEST OF THE EXISTING BIOMASS BUILDING, (4) PROVISION OF COVERED BICYCLE SHELTERS TO ACCOMMODATE 50 NO. BICYCLE STANDS, (5) PROVISION OF SITE LANDSCAPING, SUDS MEASURES, SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS AND (6) ALL OTHER ASSOCIATED AND ANCILLARY WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION.

ATLANTIC TECHNOLOGICAL UNIVERSITY - DONEGAL LETTERKENNY CAMPUS , PORT RD GORTLEE , LETTERKENNY

72m
1951977CONDITIONAL20 Dec 2019

(1) CONSTRUCTION OF A 3-STOREY LIBRARY, IT AND GENERAL EDUCATION BUILDING (5156M2) COMPRISING READING ROOMS/BOOK STACKS, GENERAL AND SPECIALIST TEACHING SPACES (LECTURE THEATRE, CLASSROOMS, COMPUTER LABS, GROUP STUDY ROOMS ETC.), STAFF OFFICES, ADMINISTRATION SPACES AND ANCILLARY SERVICE AREAS WITH SCREENED ROOF LEVEL PLANT; (2) A NORTH-SOUTH GREENWAY (BICYCLE PATH/PEDRESTRIAN WALKWAY); (3) EXTERNAL WORKS INCLUDING THE ADAPTION OF EXISTING CAR PARKING SPACES FOR ACCOMMODATION OF 10 NO. WHEELCHAIR ACCESSIBLE ENLARGED PARKING BAYS; (4) COVERED BICYCLE SHELTER FOR ACCOMMODATION OF 100 NO. BICYCLES AND (5) ALL ASSOCIATED SITE DEVELOPMENT, SITE SERVICES AND LANDSCAPING WORKS

PORT ROAD , LETTERKENNY , LETTERKENNY PO

113m
2561046CONDITIONAL23 Jun 2025

CHANGE OF USE FROM A DWELLING HOUSE TO A GUEST HOUSE AND ASSOCIATED WORKS

GORTLEE , LETTERKENNY , CO. DONEGAL

113m
2562029CONDITIONAL20 Nov 2025

CHANGE OF USE OF EXISTING PROPERTY (FORMERLY A RESIDENTIAL DWELLING) FROM UNAUTHORISED GUESTHOUSE TO EIGHT-BEDROOM RESIDENTIAL DWELLING AND ALL ASSOCIATED ANCILLARY WORKS NECESSARY TO FACILITATE THE DEVELOPMENT

GORTLEE , LETTERKENNY , CO. DONEGAL

125m
2560261CONDITIONAL26 Feb 2025

CONSTRUCTION OF NEW DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO THE PUBLIC SEWER

GORTLEE , LETTERKENNY , CO. DONEGAL

126m
1751258CONDITIONAL14 Aug 2017

(1) CONSTRUCTION OF NEW 2 STOREY DWELLING (2) CONSTRUCTION OF NEW SINGLE STOREY DOMESTIC GARAGE (3) UPGRADING OF EXISTING ENTRANCE TO FORM TWIN ENTRANCE (4) NEW CONNECTIONS TO EXISTING PUBLIC SEWERS AND (5) ALL ASSOCIATED SITE WORKS. (OUTLINE PLANNING PERMISSION REF. NO: 15/51182 REFERS)

GORTLEE , LETTERKENNY , CO. DONEGAL

135m
1850472CONDITIONAL3 Apr 2018

CONSTRUCTION OF A NEW ENTRANCE LOBBY TO THE EXISTING REAR ENTRANCE OF THE MAIN LYIT CAMPUS BUILDING INCLUDING NEW RAMPED ACCESS WITH COMPLIMENTARY STEPS AND CONSTRUCTION OF A ROOF TO THE EXISTING OIL TANKS ENCLOSURE LOCATED AT THE REAR OF THE MAIN CAMPUS BUILDING

PORT ROAD , GORTLEE & BALLYRAINE , LETTERKENNY PO

139m
2450209N/A16 Sept 2024

EXTENSION OF THE EXISTING SOUTHEAST SERVICE YARD AND THE ASSOCIATED EXTERNAL SCREEN WALL WITH GATE ACCESS ADJACENT TO THE SOUTH ENTRANCE

LETTERKENNY SHOPPING CENTRE , PORT ROAD , LETTERKENNY PO

140m
2450215CONDITIONAL26 Sept 2024

EMERGENCY ESCAPE DOOR TO THE EXTERNAL WALL OF UNIT 31 ON THE SOUTH ELEVATION ADJACENT TO THE SOUTH ENTRANCE OF THE SHOPPING CENTRE

UNIT 31 LETTERKENNY SHOPPING CENTRE , PORT ROAD , LETTERKENNY

165m
2151850CONDITIONAL17 Sept 2021

(1) ERECTION OF A FALL-ARREST HANDRAIL AND GUARDING TO FLAT ROOFED AREAS (2) INSTALLATION OF PHOTO-VOLTAIC PANELS AND PLANT WITH ASSOCIATED DUCTWORK TO AN AREA OF THE FLAT ROOF

LETTERKENNY INSTITUTE OF TECHNOLOGY , PORT ROAD , LETTERKENNY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?