The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2050098

N/A

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF A DWELLING HOUSE WITH ALL ASSOCIATED SITE WORKS AND CONNECTION TO THE PUBLIC SEWER

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Feb 2020

  2. Further information requested

    20 Mar 2020

  3. Application withdrawn

    1 Oct 2020

Application Details

Location
DOONAN , DONEGAL TOWN , DONEGAL PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.245 ha
Floor Area
197.3 sq m
Residential Units
1

Timeline

Registration Date
4 February 2020
Status
WITHDRAWN
Decision
N/A
Withdrawn
1 October 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

149m
1951985N/A18 Dec 2019

CONSTRUCTION OF A DWELLING HOUSE WITH ALL ASSOCIATED SITE WORKS AND CONNECTION TO THE PUBLIC SEWER

DOONAN , DONEGAL TOWN , DONEGAL PO

163m
2050234N/A27 Feb 2020

CONSTRUCTION OF A DWELLING HOUSE WITH ALL ASSOCIATED SITE WORKS AND CONNECTION TO THE PUBLIC SEWER

DOONAN , DONEGAL TOWN , DONEGAL PO

169m
2050039N/A21 Jan 2020

CONSTRUCTION OF A DWELLING HOUSE WITH ALL ASSOCIATED SITE WORKS AND CONNECTION TO THE PUBLIC SEWER

DOONAN , DONEGAL TOWN , DONEGAL PO

264m
2661105CONDITIONAL16 Jun 2026

(1) DECOMMISSIONING OF EXISTING SEPTIC TANK AND CONNECTION OF FOUL SEWER TO PUBLIC MAINS SEWER, (2) ERECTION OF ANCILLARY BUILDING TO VETERINARY SURGERY AND (3) ALL ASSOCIATED SITE WORKS AND LANDSCAPING

DONEGAL VETERINARY CLINIC , DOONAN , DONEGAL TOWN

287m
2050126CONDITIONAL7 Feb 2020

DOMESTIC GARAGE AND ALL ANCILLARY SITE WORKS

DRIMARK , DONEGAL TOWN , DONEGAL PO

449m
2152557CONDITIONAL20 Dec 2021

DEVELOPMENT OF TOURISM SCHEME, OFFICES AND A NURSING HOME COMPRISING OF THE CONSTRUCTION OF (1) 37 HOLIDAY CHALETS CONSISTING OF 9 NO. TWO BEDROOM UNITS, 7 NO. ONE BEDROOM UNITS AND 21 NO. THREE BEDROOM UNITS. THEY RANGE IN HEIGHT FROM ONE STOREY TO TWO STOREYS AND IN SIZE FROM 44SQM TO 146SQM (2) RESORT RECEPTION BUILDING, TWO STOREYS IN HEIGHT, CONSISTING OF: CAFÉ/BAR AREA(172SQM) WITH ADJOINING OPEN SIDED FIRE PIT AREA (142SQM); GAMES ROOM(124SQM) AND FUNCTION ROOM(236SQM) (3) GUESTROOM BUILDING, TWO STOREYS IN HEIGHT, WITH 12 GUESTROOMS (650 SQM IN TOTAL) (4) SPA BUILDING, SINGLE STOREY IN HEIGHT AND 117 SQM IN SIZE (5) SERVICE UNIT, SINGLE STOREY IN HEIGHT AND 128 SQM IN SIZE (6) PONDED WATER FEATURE AND ADJOINING AMENITY PLAY AREA (7) 5 NO. OFFICE BUILDINGS, EACH 856SQM IN SIZE AND THREE STOREYS IN HEIGHT (8) NURSING HOME COMPRISING 80 BEDROOMS ARRANGED IN A TWO TO THREE STOREY, SPLIT-LEVEL DESIGN TOTALLING 4,552 SQM IN SIZE (9) A NEW T-JUNCTION ACCESS OFF THE N56, INCORPORATING A RIGHT TURNING LANE, AT A LOCATION 130M WEST OF THE EXISTING T-JUNCTION AT THE FOUR MASTERS GAA GROUND. ONCE THE NEW T-JUNCTION BECOMES OPERATIONAL AND CONNECTS WITH THE REST OF THE LOCAL ROAD L18451 THE EXISTING T-JUNCTION IT WILL REPLACE WILL BE CLOSED TO VEHICULAR TRAFFIC AND RESTRICTED TO PEDESTRIAN USE ONLY (10) SINGLE VEHICULAR AND PEDESTRIAN ACCESS CARRIAGEWAY INTO SITE OFF LOCAL ROAD L18451, LOCATED 170M FROM NEW T-JUNCTION (11) WIDENING OF ABOVE LOCAL ROAD L18451 ON LAND LOCATED WITHIN THE APPLICATION SITE (12) NEW FOOTPATH PROVISION ALONG THE ENTIRE STRETCH OF THE SITE BORDERING THE N56 TOTALLING OVER 600M IN LENGTH AND ALONG THE WIDENED LOCAL ROAD L18451 TOTALLING 320M IN LENGTH (13) PEDESTRIAN ACCESS POINTS FROM WITHIN SITE TO NEW FOOTPATH PROVIDED ALONG THE SITE BOUNDARY WITH THE N56 (14) THE TOTAL PROVISION OF 312 CAR PARKING SPACES, INCLUDING ELECTRICAL CHARGING POINTS, DISABLED SPACES AND ASSOCIATED BICYCLE PARKING SPACES THROUGHOUT THE ENTIRE SITE TO SERVE THE USES PROPOSED (15) LANDSCAPING THROUGHOUT SITE, TOGETHER WITH AMENITY SPACE AND PUBLIC REALM PROVISION AS WELL AS ALL BOUNDARY TREATMENTS, INCLUDING FENCING/RAILING AND PLANTING (16) ALL SERVICES INCLUDING INSTALLATION OF FOUL SEWER NETWORK, PUMPING STATIONS, SURFACE WATER DRAINAGE ARRANGEMENTS,ELECTRICAL NETWORK, PUBLIC LIGHTING AND MAINS WATER SUPPLY NETWORK AND CONNECTION TO PUBLIC WATER MAINS (17) ALL ASSOCIATED SITE DEVELOPMENT WORKS ON SITE. AN (NIS) ACCOMPANIES THIS APPLICATION

REVLIN , DONEGAL TOWN , CO. DONEGAL

449m
2560148CONDITIONAL6 Feb 2025

ALTERATIONS TO PREVIOUSLY APPROVED PLANNING PERMISSION, PLANNING REF. NO. 21/52557, TO INCLUDE CONSTRUCTION OF THE FOLLOWING: (1) 68 NO. ONE AND TWO STOREY CABINS / LODGES CONSISTING OF 17 NO. ONE BEDS, 12 NO. TWO BEDS, 5 NO. THREE BEDS AND 34 NO. FOUR BEDS, (2) SINGLE STOREY RECEPTION BUILDING CONTAINING RESTAURANT, SHOP AND ANCILLARY AREAS, (3) TWO STOREY BEDROOM BLOCK CONTAINING 20 BEDROOMS, (4) TWO STOREY STAFF ACCOMMODATION BUILDING, (5) SINGLE STOREY GYM BUILDING, (6) 2 NO. SINGLE STOREY STUDIO BUILDINGS, (7) ONE AND A HALF STOREY CINEMA BUILDING, (8) SINGLE STOREY SPA BUILDING, (9) TENNIS COURTS WITH TOILET BUILDING, (10) ALTERATIONS TO EXISTING STONE SHEDS TO PROVIDE SINGLE STOREY MANAGERS OFFICE AND BIKE RENTAL AND (11) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING CAR PARK WITH 77 SPACES, ROADS, PATHS, LANDSCAPING AND FOUL / STORM DRAINAGE IN LIEU OF THE PREVIOUSLY APPROVED NURSING HOME, OFFICE BUILDINGS, HOLIDAY CHALETS, RESORT RECEPTION BUILDING, GUESTROOM BUILDING, SPA BUILDING AND SERVICE UNIT

REVLIN , DONEGAL TOWN , CO. DONEGAL

501m
1751771N/A23 Nov 2017

DEVELOPMENT CONSISTING OF THE FOLLOWING: (1) CONSTRUCTION OF AN ACCESS ROUNDABOUT ON THE N-56 WITH ASSOCIATED RE-ALIGNMENT OF THE EXISTING ROADS AND THE DOONAN ROAD WITH ACCESS ROAD AND FOOTPATHS TO THE DEVELOPMENT SITE (2) CONSTRUCTION OF 19, TWO & THREE BED, TWO-STOREY HOLIDAY CHALETS FOR SHORT TERM LETTING AND AN ASSOCIATED RECEPTION BUILDING AND CAR PARKING AREAS (3) CONSTRUCTION OF A SINGLE-STOREY WELLNESS CENTRE WITH TREATMENT ROOMS, FITNESS CENTRE AND ASSOCIATED FACILITIES (4) CONSTRUCTION OF A 2 STOREY WATER SPORTS/RECREATIONAL ACTIVITY BASE BUILDING, WITH ASSOCIATED STORAGE AREAS (5) CONSTRUCTION OF PLAY-GROUNDS AND GENERAL PLAY AREAS (6) CONSTRUCTION OF A FOUL SEWERAGE PUMPING STATION WITH A RISING MAINS DISCHARGING INTO THE PUBLIC SEWER AT THE N56 AND (7) CONSTRUCTION OF ALL ROADS, DRAINS, SEWERS AND SERVICES, FOOTPATHS, PLAY-GROUNDS, RAISED BOARDWALKS AND CAR PARKING AREAS, LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE SITE IS BOUNDED BY THE N-56 TO THE NORTH, L-18451-0 TO THE EAST, AGRICULTURAL LANDS AND DONEGAL BAY TO THE SOUTH AND RESIDENTIAL AND AGRICULTURAL LANDS TO THE WEST

REVLIN & DOONAN TOWNLANDS , DONEGAL TOWN , CO. DONEGAL

513m
2461501REFUSED23 Sept 2024

CONSTRUCTION OF AN EXTENSION TO EXISTING DWELLING HOUSE AND THE CONVERSION OF EXISTING ATTIC SPACE TO INCLUDE GRANNY FLAT ACCOMMODATION AND ALL ANCILLARY SITE DEVELOPMENT WORKS

DRUMARK , DONEGAL TOWN , CO. DONEGAL

540m
2460938N/A21 Jun 2024

(1) CONSTRUCTION OF A DETACHED TWO STOREY PITCHED ROOF GARAGE AND HOME OFFICE WITH DOMESTIC GARAGE USE AT GROUND LEVEL AND HOME OFFICE USE AT FIRST FLOOR LEVEL WITH EXTERNAL STAIR ACCESS TO THE FIRST FLOOR, ALL ANCILLARY TO THE USE OF THE EXISTING DOMESTIC DWELLING, (2) ALL SERVICES, DRAINAGE, ROADWAY AND HARDSTANDING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

DRIMARK , DONEGAL TOWN , CO DONEGAL

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?