Application received
24 May 2020
Further information requested
16 Jul 2020
Further information received
14 Jan 2021
Application withdrawn
3 Jun 2021
Application Details
- Location
- AGHAVEAGH , BALLYBOFEY , LIFFORD PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.1 ha
Timeline
- Registration Date
- 24 May 2020
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 3 June 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
DEVELOPMENT WORKS WHICH SHALL PROCESS ALTERNATIVE FEEDSTOCKS AND PRODUCE RENEWABLE ENERGY AND FERTILSER. THE PROPOSED DEVELOPMENT WILL BE ACCESSED VIA THE EXISTING INTERNAL CONNECTING ACCESS ROAD WITHIN GLENMORE ESTATE WHICH LINKS THE SITE THE R253. THE WORKS INVOLVE: (1) DEVELOPMENT WITHIN THE CURTILAGE OF THE EXISTING BIOGAS PLANT INVOVLING: (A) THE CONSTRUCTION/PROVISION OF AN EXTENSION TO THE EXISTING FEEDSTOCK (WASTE) RECEPTION BUILDING TO ACCOMMODATE FEEDSTOCK RECEPTION ACTIVITIES AND DIGESTATE PROCESSING EQUIPMENT, (B) GAS PURIFICATION AND COMPRESSION PLANT, (C) OFFICE EXTENSION (FIRST FLOOR OPEN PLAN) AND (D) EXTERNALLY LOCATED TEST TANK, (2) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE (A) INTERNAL ACCESS ROAD FROM THE EXISTING BIOGAS SITE, (B) CONCRETE RETENTION BUND, (C) 3 NO. DIGESTERS VESSELS WITH COLLECTION DOMES, (D) 3 NO. HYDROLYSIS TANKS WITH COLLECTION COVERS, (E) PUMP HOUSES (2 NO.) AND ASSOCIATED PROCESS PIPEWORK, AND (F) STORMWATER ATTENUATION TANK, PETROL INTERCEPTOR AND ASSOCIATED PIPEWORK, (3) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE A FERTILISER PLANT COMPRISING (A) FERTILISER PROCESSING BUILDING CONTAINING DIGESTATE PROCESSING EQUIPMENT, STORAGE AREAS AND ASSOCIATED, EXTERNALLY LOCATED, ODOUR CONTROL EQUIPMENT/EXHAUST STACK (17.5M IN HEIGHT), (B) LIQUID FERTLISER STORAGE TANKS (6 NO.), (C) HGV PARKING, (D) ALL PROCESS PIPEWORK AND ASSOCIATED DRAINAGE WORKS AND (E) ASSOCIATED SITE WORKS INCLUDING FENCING AND LANDSCAPE SCREENING THE APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) AND RELATES TO DEVELOPMENT WHICH COMPRISES AN ACTIVITY REQUIRING AN INDUSTRIAL EMISSIONS LICENCE FROM THE ENVIRONMENTAL PROTECTION AGENCY (EPA)
AGHAVEAGH , BALLYBOFEY , LIFFORD PO
DEVELOPMENT WORKS AT THE GLENMORE BIOGAS PLANT, WHICH SHALL PROCESS ALTERNATIVE FEEDSTOCKS AND PRODUCE RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL BE ACCESSED VIA THE EXISTING INTERNAL CONNECTING ACCESS ROAD WITHIN GLENMORE ESTATE WHICH LINKS THE SITE TO THE R253. THE WORKS INVOLVE: (1) DEVELOPMENT WITHIN CURTILAGE OF THE EXISTING BIOGAS PLANT INVOLVING (A) THE CONSTRUCTION/ PROVISION OF AN EXTENSION TO THE EXISTING FEEDSTOCK (WASTE) RECEPTION BUILDING TO ACCOMMODATE FEEDSTOCK RECEPTION ACTIVITIES AND DIGESTATE PROCESSING EQUIPMENT, (B) GAS PURIFICATION AND COMPRESSION PLANT, (C) OFFICE EXTENSION (FIRST FLOOR OPEN PLAN) , AND (D) EXTERNALLY LOCATED TEST TANK; (2) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE (A) INTERNAL ACCESS ROAD FROM THE EXISTING BIOGAS SITE, (B) CONCRETE RETENTION BUND, (C) 3 NO. DIGESTERS VESSELS WITH COLLECTION DOMES, (D) 3 NO. HYDROLYSIS TANK WITH COLLECTION COVERS, (E) PUMP HOUSES (2 NO.) AND ASSOCIATED PROCESS PIPEWORK, AND (F) STORMWATER ATTENUATION TANK, PETROL INTERCEPTOR AND ASSOCIATED PIPEWORK; (3) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE A FERTILISER PLANT, COMPRISING (A) FERTILISER PROCESSING BUILDING CONTAINING DIGESTATE PROCESSING EQUIPMENT, STORAGE AREAS AND ASSOCIATED, EXTERNALLY LOCATED, ODOUR CONTROL EQUIPMENT/EXHAUST STACK (17.5M IN HEIGHT), (B) LIQUID FERTILISER STORAGE TANKS (6 NO.), (C) HGV PARKING, (D) ALL PROCESS PIPEWORK AND ASSOCIATED DRAINAGE WORKS, AND (E) ASSOCIATED SITE WORKS INCLUDING FENCING AND LANDSCAPE SCREENING. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) AND RELATES TO DEVELOPMENT WHICH COMPRISES AN ACTIVITY REQUIRING AN INDUSTRIAL EMISSIONS LICENCE FROM THE ENVIRIONMENTAL PROTECTION AGENCY (EPA)
GLENMORE ESTATE , AGHAVEAGH , BALLYBOFEY
THE FLARE, PROCESS SUMP, WASHDOWN AREA,CO2 COMPRESSION BUILDING, 2 NO. CO2 TANKS AND WEIGHBRIDGE WHICH ARE IN LIEU OF THOSE APPROVED UNDER 14/51399. A BOILER HOUSE, CARBOSCAN CONTAINER, 2 NO. FURTHER CO2 TANKS, SECURITY HUT AT THE WEIGHTBRIDGE, A CONTROLS BUILDING, 3 NO. DIGESTATE DISPATCH TANK, 2 NO. TRANSFORMERS, ODUR CONTROL UNIT, OFFICE EXTENSION, EXTENSION TO THE NORTH -EAST CORNER OF THE YARD AND CLOSURE OF THE INTERNAL ROAD LINKING THE BIOGAS FACILITY TO THE WIDER GLENMORE ESTATE AT THE SOUTH EASTERN CORNER OF THE SITEAND ALL ASSOCIATED SITE WORKS ON LANDS ACCESSED OFF THE ADJOINING REGIONAL ROAD R-253-1 ASSOCIATED WITH GLENMORE ESTATES BIOGAS FACILITY
AGHAVEAGH , BALLYBOFEY , LIFFORD PO
CONSTRUCTION OF A NEW DWELLING INCLUDING INTEGRATED GARAGE, SWIMMING POOL AND ASSOCIATED PLANT ROOMS WHILE INCORPORATING BASEMENT WORKS ALREADY COMPLETED UNDER THE PREVIOUS GRANT OF PERMISSION 15/50675 ALL WITH SEWAGE TREATMENT SYSTEM AND SITE DEVELOPMENT WORKS
AGHAVEAGH , BALLYBOFEY , LIFFORD PO
(1) RAISING THE ROOF LEVEL AND CONSTRUCTION OF A FIRST FLOOR LAYOUT TO EXISTING GATE LODGE 1, TOGETHER WITH ELEVATIONAL CHANGES WITH ASSOCIATED SEWAGE TREATMENT SYSTEM (2) CONSTRUCTION OF (A) AN EXTENSION TO THE SIDE OF GATE LODGE 2 AS WELL AS RAISING ROOF LEVEL FOR CONSTRUCTION OF A FIRST-FLOOR LAYOUT TOGETHER WITH ELEVATIONAL CHANGES WITH ASSOCIATED SEWAGE TREATMENT SYSTEM (B) ENTRANCE PILLARS WITH GATES AND BOUNDARY WALL WITH A PUBLIC FOOTPATH AND STREET LIGHTING LINKING GATE LODGES (3) ALL ASSOCIATED SITE DEVELOPMENT WORKS
AGHAVEAGH , BALLYBOFEY , LIFFORD PO
CONSTRUCTION OF EXTENSION TO THE SIDE OF EXISTING DWELLING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
AGHAVEAGH , BALLYBOFEY , LIFFORD PO
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
AGHAVEAGH , BALLYBOFEY , LIFFORD PO
CONSTRUCTION OF A DWELLING HOUSE, GARAGE, WASTE TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
AGHAVEAGH , BALLYBOFEY , CO. DONEGAL
CONSTRUCTION OF A DWELLING HOUSE, SEPTIC TREATMENT SYSTEM WITH ALL ASSOCIATED DRAINAGE AND SITE WORKS
KILLENDERRY , BALLYBOFEY , LIFFORD PO
CONSTRUCTION OF A DWELLING HOUSE, SEPTIC TREATMENT SYSTEM WITH ALL ASSOCIATED DRAINAGE AND SITE WORKS
KILLADERRY , BALLYBOFEY , LIFFORD PO
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?