The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2050721

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

ERECTION OF A TEMPORARY NEW PREFABRICATED CLASSROOM BLOCK TO CONSIST OF 2 NO. 80 M2 CLASSROOMS AND 2 NO. SET ROOMS WITH CONNECTION TO ON-SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Jun 2020

  2. Decision: CONDITIONAL

    23 Jul 2020

  3. Decision due

    2 Aug 2020

  4. Grant issued

    2 Sept 2020

Application Details

Location
BALLYRAINE , LETTERKENNY , LETTERKENNY PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.322 ha

Timeline

Registration Date
8 June 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 July 2020
Grant Date
2 September 2020
Permission Expires
1 September 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
1951881CONDITIONAL4 Dec 2019

CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE EAST OF THE EXISTING SCHOOL COMPRISING OF A NEW CLASSROOM, 2 SET ROOMS AND ASSOCIATED ACCOMMODATION AND INTERNAL ALTERATIONS TO THE EXISTING LAYOUT AND ALTERATIONS TO EXISTING WINDOWS TO THE SOUTH AND EAST ELEVATIONS OF THE SCHOOL AND DEMOLITION AND REMOVAL OF THE TEMPORARY PORTACABIN OFF SITE AND CONNECTION TO ON-SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

BALLYRAINE , LETTERKENNY , LETTERKENNY PO

57m
2561989CONDITIONAL14 Nov 2025

INSTALLATION OF HIGH-POWER ELECTRIC VEHICLE CHARGING POINTS AND ASSOCIATED INFRASTRUCTURE CONSISTING OF THE FOLLOWING: (1) INSTALLATION OF 8 NO. ELECTRIC VEHICLE CHARGING BAYS WITH 8 NO. TESLA ILLUMINATED CHARGING UNITS AND ASSOCIATED SIGNAGE, (2) INSTALLATION OF PROPOSED TESLA SUPERCHARGER POWER CABINET EQUIPMENT, (3) INSTALLATION OF PROPOSED MODULAR SUBSTATION, (4) ERECTION OF ASSOCIATED EV SIGNAGE AND (5) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING SURFACING, LIGHTING AND LINE MARKING

TESLA EV CHARGING HUB , THE MOUNT ERRIGAL HOTEL , BALLYRAINE LETTERKENNY

120m
1850692CONDITIONAL3 May 2018

ERECTION OF AN OFFICE BUILDING WITH STAFF WELFARE AND CANTEEN FACILITIES WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS

BALLYRAINE , LETTERKENNY PO , CO. DONEGAL

120m
1850610N/A18 Apr 2018

ERECTION OF AN OFFICE BUILDING WITH STAFF WELFARE AND CANTEEN FACILITIES WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS

BALLYRAINE , LETTERKENNY PO , CO. DONEGAL

132m
2251571CONDITIONAL20 Sept 2022

ERECTION OF UP TO 370KWP (C.1915M2) OF ROOF MOUNTED SOLAR PV PANELS AND ALL ASSOCIATED WORKS

BALLYRAINE , LETTERKENNY , CO. DONEGAL

141m
2350575REFUSED28 Apr 2023

CONSTRUCTION OF A SINGLE STOREY APARTMENT WITHIN THE CONFINES OF THE PROPERTY INCLUDING CONNECTION TO MAINS SERVICES AND ASSOCIATED SITE DEVELOPMENT WORKS

64 BALLYRAINE PARK , BALLYRAINE , LETTERKENNY PO

141m
2351509N/A9 Oct 2023

CONSTRUCTION OF A SINGLE STOREY ONE BEDROOM APARTMENT WITHIN THE CONFINES OF THE PROPERTY INCLUDING CONNECTION TO MAINS SERVICES AND ASSOCIATED SITE DEVELOPMENT

NO. 64 BALLYRAINE PARK , LETTERKENNY , LETTERKENNY PO

148m
2051282CONDITIONAL14 Sept 2020

ERECTION OF ADVERTISING STRUCTURES AND SIGNAGE ON THE NORTH WEST AND SOUTH WEST ELEVATIONS OF THE BUILDING AND A STANDALONE ADVERTISING STRUCTURE LOCATED AT THE NORTH WEST CORNER OF THE SITE WITH A SIGN FACING SOUTH WEST

BALLYRAINE , LETTERKENNY , CO DONEGAL

154m
2152543CONDITIONAL17 Dec 2021

APARTMENT TO THE SIDE OF EXISTING DWELLING

63 BALLYRAINE PARK , LETTERKENNY , LETTERKENNY PO

159m
1951069CONDITIONAL15 Jul 2019

CONSTRUCTION OF A CARPORT AND A COVERED DECK EXTENSION TO THE REAR OF EXISTING DWELLING WITH ALL ASSOCIATED SITE WORKS

17 ORCHARD GROVE , BALLYRAINE , LETTERKENNY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?