Proposed Development

ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND PROVISION OF SEPTIC TANK

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Jun 2020

  2. Further information requested

    23 Jul 2020

  3. Further information received

    28 Jan 2021

  4. Application withdrawn

    16 Feb 2021

Application Details

Location
TIRODDY , RAMELTON , LETTERKENNY PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.4 ha
Floor Area
321 sq m
Residential Units
1

Timeline

Registration Date
9 June 2020
Status
WITHDRAWN
Decision
N/A
Withdrawn
16 February 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

124m
2550128CONDITIONAL17 Sept 2025

EXTENSION OF FRONT ELEVATION (LOUNGE AREA) OF EXISTING DWELLING

TIRODDY , RAMELTON , LETTERKENNY PO

322m
2461125CONDITIONAL24 Jul 2024

DEMOLITION OF EXISTING (DEFECTIVE/MICA) DWELLING HOUSE AND RECONSTRUCTION OF A NEW REPLACEMENT DWELLING HOUSE AND CONNECTION TO EXISTING SEWAGE TREATMENT PLANT

TIRRODDY , GLENALLA , LETTERKENNY

376m
2461367N/A4 Sept 2024

(1) DEMOLITION OF EXISTING OUTHOUSES, (2) CONSTRUCTION OF A REPLACEMENT DRY STORAGE SHED AND (3) PLACEMENT OF A MOBILE HOME ON THE SITE (TO BE REMOVED AFTER THE COMPLETION OF NEARBY DWELLING HOUSE GRANTED UNDER PLANNING REF. NO. 20/51268)

BALLYHENNY , RAMELTON , LETTERKENNY PO

465m
2051268CONDITIONAL9 Sept 2020

ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND PROVISION OF A SEPTIC TANK

BALLYKENNY , RAMELTON , CO DONEGAL

535m
1950136N/A6 Feb 2019

CONSTRUCTION OF A ONE AND A HALF STOREY DWELLING HOUSE, DOMESTIC GARAGE, PROVISION OF MECHANICAL TREATMENT SYSTEM/SOIL POLISHING FILTER AND ALL ASSOCIATED SITE-WORKS

TIRODDY , RAMELTON , LETTERKENNY PO

535m
1950246CONDITIONAL26 Feb 2019

CONSTRUCTION OF A ONE AND A HALF STOREY DWELLING HOUSE, DOMESTIC GARAGE, PROVISION OF MECHANICAL TREATMENT SYSTEM/SOIL POLISHING FILTER AND ALL ASSOCIATED SITE-WORKS

TIRODDY , RAMELTON , LETTERKENNY PO

710m
2051157CONDITIONAL25 Aug 2020

1)CONSTRUCTION OF A NEW WASTEWATER TREATMENT PLANT (WWTP) IN THE TOWNLAND OF TIRRODDY WITH ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS INCLUDING INTERNAL ACCESS ROAD, INLET WORKS, WWTP PROCESS TANKS, SLUDGE STORAGE TANKS, CHEMICAL STORAGE TANKS, ANCILLARY TREATMENT UNITS, ADMINISTRATION & ESB SUB-STATION BUILDING, SLUDGE PRESS BUILDING, INTERNAL PUMPING STATIONS, SURFACE WATER ATTENUATION POND, 2.4M HIGH BOUNDARY FENCE AROUND THE PERIMITER OF THE WWTP WORKS, 1.2M FENCING AROUND THE SITE BOUNDARY, ENTRANCE VIA AN EXISTING COILLTE ROADWAY AND ENTRANCE ONTO L-5612-1 AND WIDENING AND STRENGHTENING OF L-5612-1 2)CONSTRUCTION OF APPROXIMATELY 1,590M OF TREATED EFFLUENT OUTFALL PIPELINE IN THE TOWNLANDS OF TIRRODDY AND BROWNKNOE, INCLUDING APPROXIMATELY 160M MARINE SECTION & OUTFALL DIFFUSER LOCATED IN LOUGH SWILLY3) CONSTRUCTION OF 1 NO. MAIN WASTEWATER PUMPING STATION AT RAMELTON IN THE TOWNLAND OF RAMELTON INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, DEMOLITION OF EXISTING SINGLE-STOREY BUILDING, FLOOD PROTECTION MEASURES, BELOW GROUND STORAGE TANK & STRUCTURES, PUMP HOUSE BUILDING, ESB SUB-STATION UNIT, RUBBLE STONE PERIMITER WALLS, NEW ENTRANCE ONTO CASTLE STREET, RECONSTRUCTION OF AN EXISTING STONE BOUNDARY WALL APPROXIMATELY 15M LONG ALONg CASTLE STREET AND CONNECTION TO EXISTING STORM OUTFALLS 4)CONSTRUCTION OF 1 NO. MAIN WASTEWATER PUMPING STATION AT RATHMULLAN IN THE TOWNLAND OF RATHMULLAN & BALLYBOE INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, FLOOD PROTECTION MEASURES, BELOW GROUND STORAGE TANK & STRUCTURES, PUMP HOUSE BUILDING, RUBBLE STONE PERIMETER WALLS, ESB SUB-STATION UNIT, DEMOLITION OF AN EXISTING SUBTERRANEAN MUNICIPAL SEPTIC TANK, NEW TURNING HAMMERHEAD AT THE END OF THE EXISTING TURNING CIRCLE AT ABBEY VIEW ESTATE, NEW ENTRANCE TO ABBEY VIEW ESTATE, TEMPORARY WORKING AREA DURING CONSTRUCTION AND CONNECTION TO EXISTING STORM OUTFALLS 5)CONSTRUCTION OF 1 NO. NETWORK WASTEWATER PUMPING STATION AT RATHMULLAN IN THE TOWNLAND OF RATHMULLAN & BALLYBOE INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, FLOOD PROTECTION MEASURES, BELOW GROUND PUMPING STATION, STORAGE TANK & STRUCTURES, LOW-LEVEL CONTROL KIOSK, 7.6M HIGH ORNATE VENTILATION STACK, RUBBLE STONE PERIMETER WALLS, DEMOLITION OF AN EXISTING SUBTERRANEAN MUNICIPAL SEPTIC TANK, NEW ENTRANCE ONTO MAIN STREET, TEMPORARY WORKING AREA DURING CONSTRUCTION, TEMPORARY ENTRANCE ONTO MAIN STREET DURING CONSTRUCTION, RELOCATION AND UPGRADING OF EXISTING STORM DRAIN AND CONNECTION TO EXISTING STORM OUTFALL......

RAMELTON MILFORD AND RATHMULLAN , CO DONEGAL

721m
2560770CONDITIONAL14 May 2025

DEMOLITION OF EXISTING FAMILY HOME THAT HAS DEFECTIVE BLOCK WORK AND ERECTION OF A NEW REPLACEMENT DWELLING HOUSE INCLUDING CONNECTION TO EXISTING SERVICES AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

BALLYKENNY , RAMELTON , CO. DONEGAL

1.2km
2561927CONDITIONAL5 Nov 2025

RENOVATION, REFURBISHMENT AND CONSTRUCTION OF EXTENSION TO EXISTING FIRE DAMAGED DWELLING HOUSE CONSISTING OF NEW STOREY AND A HALF LIVING ACCOMMODATION DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES

DRUMHERRIVE , GLENALLA , LETTERKENNY

1.3km
2561217CONDITIONAL16 Jul 2025

ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

BALLYCONNELLY , RAMELTON , LETTERKENNY PO

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?