2050958

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF A ROADSIDE BOUNDARY WALL AND WING WALLS TO THE EXISTING ENTRANCE SERVING DWELLING TOGETHER WITH ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jul 2020

  2. Decision: CONDITIONAL

    3 Sept 2020

  3. Decision due

    13 Sept 2020

  4. Grant issued

    7 Oct 2020

Application Details

Location
WOODVIEW HOUSE , WINDYHALL , LETTERKENNY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council

Timeline

Registration Date
20 July 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 September 2020
Grant Date
7 October 2020
Permission Expires
6 October 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

81m
2050073CONDITIONAL29 Jan 2020

CONSTRUCTION OF A SINGLE STOREY SUN LOUNGE EXTENSION TO THE WESTERN SIDE ELEVATION OF EXISTING DWELLING

WINDYHALL , LETTERKENNY , LETTERKENNY PO

112m
2351231CONDITIONAL18 Aug 2023

EXISTING DWELLING HOUSE AND GARAGE CONSTRUCTED UNDER APPROVED PLANNING APPLICATION REF: 98/615 AND ALL ASSOCIATED WORKS AND SITE WORKS

WINDYHALL , LETTERKENNY , CO. DONEGAL

403m
2660390CONDITIONAL11 Mar 2026

(1) DETACHED STUDIO SPACE INCORPORATING HOME GYM AND ANCILLARY STORAGE, (2) DETACHED SAUNA AND, (3) ASSOCIATED SITE DEVELOPMENT WORKS

GLENCAR IRISH , LETTERKENNY , CO. DONEGAL

403m
2560376N/A18 Mar 2025

(1) DETACHED STUDIO SPACE INCORPORATING HOME GYM AND ANCILLARY STORAGE, (2) DETACHED SAUNA AND (3) ASSOCIATED SITE DEVELOPMENT WORKS

GLENCAR IRISH , LETTERKENNY , CO. DONEGAL

445m
2661208N/A30 Jun 2026

A PERIOD OF 10 YEARS FOR A LARGE-SCALE RESIDENTIAL DEVELOPMENT (LRD) CONSISTING OF THE PROVISION OF A TOTAL OF 346 NO. RESIDENTIAL UNITS ALONG WITH THE PROVISION OF A NEIGHBOURHOOD CENTRE THAT WILL INCORPORATE A CRECHE. PARTICULARS OF THE DEVELOPMENT COMPRISE AS FOLLOWS (1) SITE EXCAVATION WORKS TO FACILITATE THE PROPOSED DEVELOPMENT TO INCLUDE EXCAVATION AND GENERAL SITE PREPARATION WORKS, (2) PROVISION OF A TOTAL OF 346 NO. RESIDENTIAL UNITS WHICH WILL CONSIST OF: 10 NO. 1 BED DUPLEX APARTMENT UNITS; 123 NO. 2 BED DUPLEX APARTMENT UNITS; 42 NO. 3 BED DUPLEX APARTMENT UNITS; 98 NO. 2 BED DWELLINGS; 53 NO. 3 BED DWELLINGS AND 20 NO. 4 BED DWELLINGS. BUILDING TYPOLOGIES RANGE IN HEIGHT FROM SINGLE TO THREE STOREY AND COMPRISE A MIXTURE OF DETACHED, SEMI-DETACHED AND TERRACED DWELLINGS ALONG WITH PROVISION OF DUPLEX APARTMENT UNITS, (3) PROVISION OF A CRECHE THAT WILL SERVE AS A NEIGHBOURHOOD CENTRE, (4) PROVISION OF ASSOCIATED CAR PARKING AT SURFACE LEVEL VIA A COMBINATION OF IN-CURTILAGE PARKING FOR DWELLINGS AND VIA ON-STREET PARKING FOR THE CRECHE AND APARTMENT UNITS, (5) PROVISION OF ELECTRIC VEHICLE CHARGE POINTS WITH ASSOCIATED SITE INFRASTRUCTURE DUCTING TO PROVIDE CHARGE POINTS FOR RESIDENTS THROUGHOUT THE SITE, (6) PROVISION OF ASSOCIATED BICYCLE STORAGE FACILITIES AT SURFACE LEVEL THROUGHOUT THE SITE AND BIN STORAGE FACILITIES, (7) PROVISION OF ASSOCIATED OPEN SPACE AREAS, RESIDENTIAL COMMUNAL OPEN SPACE AREAS TO INCLUDE FORMAL PLAY AREAS ALONG WITH ALL HARD AND SOFT LANDSCAPE WORKS FOR PRIVATE GARDENS AND AMENITY SPACES ALONG WITH PUBLIC LIGHTING, PLANTING AND BOUNDARY TREATMENTS TO INCLUDE BOUNDARY WALLS, RETAINING WALLS, RAILINGS AND FENCING, (8) PROVISION OF A NEW LINK ROAD WITH ASSOCIATED WORKS TO INCLUDE FOR PROVISION OF ASSOCIATED CYCLE AND WALKING INFRASTRUCTURE ALONG WITH ANCILLARY WORKS TO INCLUDE FOR CULVERTING OF EXISTING WATERCOURSES, LANDSCAPING AND LIGHTING WORKS. THE PROPOSED LINK ROAD WILL FACILITATE PART OF THE NORTHERN NETWORK PROJECT, (9) PROVISION OF NEW ENTRANCES ONTO THE NEW LINK ROAD WITH ASSOCIATED PEDESTRIAN CONNECTIONS, (10) PROVISION OF INTERNAL CULVERTS AND ASSOCIATED WORKS ALONG WITH REALIGNMENT AND DECOMMISSIONING OF EXISTING DRAINAGE CHANNELS WITHIN THE SITE. CULVERT WORKS TO INCLUDE FOR PROVISION OF HEADWALLS, (11) PROVISION OF ESB SUBSTATIONS, (12) ASSOCIATED INTERNAL SITE WORKS AND ATTENUATION SYSTEMS TO INCLUDE FOR HYDROCARBON AND SILT INTERCEPTORS, (13) PROVISION OF ANCILLARY SITE DEVELOPMENT/CONSTRUCTION WORKS

WINDYHALL , LETTERKENNY , CO. DONEGAL

518m
1750814CONDITIONAL29 May 2017

EXTENSION TO THE EXISTING AFTER SCHOOL ROOM INTO THE EXISTING ATTIC SPACE WITH AN ADDITIONAL ROOFLIGHT ON THE REAR ROOF AND ALL ASSOCIATED WORKS

ERRIGAL MONTESSORI SCHOOL & CRECHE , LONG LANE GLENCAR IRISH , LETTERKENNY

584m
1850315CONDITIONAL27 Feb 2018

DEVELOPMENT OF CAR PARKING, EXTENSION TO ACCESS ROAD AND ASSOCIATED ANCILLARY WORKS ADJACENT TO IDA OFFICE PARK

WINDYHALL , LETTERKENNY PO , CO. DONEGAL

603m
1750582N/A13 Apr 2017

ERECTION OF A NEW ATTIC CONVERSION AT EXISTING DWELLING HOUSE

NO. 23 GLEANN TAIN CLOSE , CARNAMUGGAGH UPPER , LETTERKENNY

603m
1750740CONDITIONAL15 May 2017

NEW ATTIC CONVERSION AT EXISTING DWELLING HOUSE

NO. 23 GLEANN TAIN CLOSE , CARNAMUGGAGH UPPER , LETTERKENNY

606m
1850758CONDITIONAL11 May 2018

CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS

NO. 14 GLEANN TÁIN MANOR , CARNAMOGAGH UPPER , LETTERKENNY PO

Planning a project of your own?