The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2051307

N/A

Donegal - Donegal County Council

Proposed Development

(1) CONSTRUCTION OF AN EXTENSION TO AN EXISTING RESIDENTIAL DWELLING TO THE SIDE WITH NEW SUN ROOM (2) REPLACEMENT OF EXISTING ROOFLIGHTS WITH LARGER VELUX ROOFLIGHTS

View the full application file on the council's planning portal →

Application Details

Location
2 PORTRONAN , MALIN HEAD , LIFFORD PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.07 ha

Timeline

Registration Date
17 September 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2051664CONDITIONAL5 Nov 2020

(1) CONSTRUCTION OF AN EXTENSION TO AN EXISTING RESIDENTIAL DWELLING TO THE SIDE WITH NEW SUN ROOM (2) REPLACEMENT OF EXISTING ROOFLIGHTS WITH LARGER VELUX ROOFLIGHTS

2 PORTRONAN , MALIN HEAD , LIFFORD PO

1m
2051542N/A20 Oct 2020

(1) CONSTRUCTION OF AN EXTENSION TO AN EXISTING RESIDENTIAL DWELLING TO THE SIDE WITH NEW SUN ROOM (2) REPLACEMENT OF EXISTING ROOFLIGHTS WITH LARGER VELUX ROOFLIGHTS

2 PORTRONAN , MALIN HEAD , LIFFORD PO

20m
2150829CONDITIONAL5 May 2021

DOMESTIC GARAGE, TOGETHER WITH ALL ASSOCIATED WORKS

NO. 3 PORT RONAN , ARDMALIN , MALIN HEAD

22m
2251977CONDITIONAL12 Dec 2022

EXTENSION AND RENOVATIONS TO EXISTING DWELLING HOUSE, TOGETHER WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS

NO 1 PORT RONAN , ARDMALIN MALIN HEAD , LIFFORD PO

57m
2250883CONDITIONAL20 May 2022

(1) DEMOLITION OF EXISTING DWELLING HOUSE (2) CONSTRUCTION OF A NEW DWELLING HOUSE WITH ASSOCIATED SITE WORKS TO INCLUDE THE REPLACEMENT OF THE EXISTING WASTEWATER TREATMENT SYSTEM. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

ARDMALIN , MALIN , LIFFORD PO

57m
2151753REFUSED1 Sept 2021

DEMOLITION OF EXISTING DWELLING HOUSE TO ALLOW FOR THE CONSTRUCTION OF A NEW DWELLING HOUSE WITH ASSOCIATED SITE WORKS TO INCLUDE THE REPLACEMENT OF THE EXISTING WASTEWATER TREATMENT SYSTEM. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

ARDMALIN , MALIN , LIFFORD PO

182m
1751703CONDITIONAL13 Nov 2017

CONSTRUCTION OF A NEW DWELLING, DOMESTIC GARAGE AND WASTEWATER TREATMENT SYSTEM TOGETHER WITH ALL ASSOCIATED SITE WORKS

ARDMALIN , MALIN HEAD , CO. DONEGAL

205m
2460874CONDITIONAL11 Jun 2024

EXTENSION TO EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS

ARDMALIN , MALIN HEAD , CO. DONEGAL

231m
2660635CONDITIONAL14 Apr 2026

CONSTRUCTION OF AN EXTENSION TO EXISTING GARAGE AT GROUND FLOOR LEVEL AND DEVELOPMENT OF A PLAY AREA TO THE FIRST FLOOR

PORTRONAN , ARDMALIN , MALIN HEAD LIFFORD PO

313m
2250936N/A31 May 2022

ERECTION OF 2 NO. GLAMPING PODS WITH WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA, CAR PARKING, CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS

MIDDLETOWN , ARDMALIN , MALIN HEAD

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?