2051575
CONDITIONALDonegal - Donegal County Council
Proposed Development
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK. THIS APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)
View the full application file on the council's planning portal →Application Timeline
Application received
22 Oct 2020
Further information requested
10 Dec 2020
Further information received
13 Jan 2021
Decision: CONDITIONAL
3 Jun 2021
Decision due
10 Jun 2021
Grant issued
21 Jul 2021
Application Details
- Location
- MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.23 ha
- Floor Area
- 260 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 22 October 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 3 June 2021
- Grant Date
- 21 July 2021
- Permission Expires
- 20 July 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM. THIS APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
CONSTRUCTION OF A SPLIT LEVEL DWELLING AND ALL ASSOCIATED SITE AND ANCILLARY WORKS INCLUDING NEW WASTEWATER TREATMENT SYSTEM. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
(1) TEACH CONAITHE AGUS GÁRAISTE A THÓGÁIL, CÓRAS CÓIREÁLA LE HITHIR SCAGAIRE SNASAITHE AGUS GACH OIBREACHA SUÍMH (2) LE DAMHLACH SEARACHAI ATÁ ANN FREASTAL AR AN TEACH CONAITHE TEAGHLACH IN AICE LÁIMHE TEAGHAIS SUITE AR AN TEORAINN THOIR THEAS A DICHOMISIUN AGUS CÓRAS CÓIREÁLA NUA A SHUITEÁIL LE ITHIR SCAGAIRE SNASAITHE
MACHÁIRE CHLOCHAIR , AN BUN BEAG , CO. DHÚN NA nGALL
CONVERSION OF AN EXISTING OUTBUILDING TO A HOLIDAY HOME, CONSISTING OF NEW WINDOWS, DOOR AND NEW ROOF FINISH
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
CONVERSION OF AN EXISTING OUTBUILDING TO A HOLIDAY HOME, CONSISTING OF NEW WINDOWS, DOOR AND NEW ROOF FINISH
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
ERECTION OF A PITCHED ROOF ON THE EXISTING FLAT ROOFED EXTENSION TO THE REAR OF THE EXISTING DWELLING, NEW WINDOWS TO THE REAR AND SIDE ELEVATIONS OF THIS PART OF THE DWELLING
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
CONSTRUCTION OF A DWELLING HOUSE WITH TREATMENT SYSTEM AND POLISHING FILTER
ARDNAGAPPERY , DERRYBEG , LETTERKENNY PO
CONSTRUCTION OF A DWELLING HOUSE WITH TREATEMENT SYSTEM AND POLISHING FILTER
ARDNAGAPPERY , DERRYBEG , LETTERKENNY PO
REFURBISHMENTS, ALTERATIONS & EXTENSIONS OF EXISTING PART TWO-STOREY / PART THREE STOREY HOTEL BUILDING CONSISTING OF: (1) DEMOLITION OF EXISTING STAIRCORE (46.5 SQ/M) ON THE EAST ELEVATION AND REPLACEMENT WITH NEW STAIRCORE (198 SQ/M) FROM LOWER GROUND FLOOR LEVEL TO THE PROPOSED NEW SECOND FLOOR LEVEL WITH NEW PLANT ROOM AT LOWER GROUND FLOOR LEVEL AND NEW HOUSEKEEPING/STORAGE ROOMS AT GROUND, FIRST AND SECOND FLOOR LEVELS, (2) REFURBISHMENT OF EXISTING PART TWO STOREY, PART THREE STOREY CONCRETE STRUCTURE, (3) ALTERATIONS TO INTERNAL LAYOUTS AT EXISTING LOWER GROUND FLOOR, GROUND FLOOR AND FIRST FLOOR LEVELS (3,003 SQ/M) PROVIDING NEW RECEPTION/ADMINISTRATION AREA, BAR/RESTAURANT, CUSTOMER TOILET/KITCHEN/STAFF FACILITIES/PLANT AND 69 GUEST BEDROOMS, (4) PROPOSED NEW ADDITIONAL SECOND FLOOR (1,337 SQ/M) ABOVE EXISTING BUILDING INCORPORATING NEW FULLY SERVICED WEDDING VENUE/FUNCTION ROOM, BAR/RESTAURANT PLUS OUTDOOR TERRACE AREA, (5) PROPOSED NEW THREE STOREY EXTENSION (2,029 SQ/M) ATTACHED TO THE NORTH EAST OF THE EXISTING BUILDING TO PROVIDE 11 NEW GUEST BEDROOMS (80 IN TOTAL) AND 15 NO. NEW TWO BEDROOM APARTMENTS, (6) PROPOSED NEW PART SINGLE STOREY, PART FOUR STOREY EXTENSION (266 SQ/M) TO THE SOUTH ELEVATION OF THE EXISTING BUILDING TO PROVIDE EXTENDED KITCHEN FACILITIES, NEW LIFTS, STAIRCORE AND EXTERNAL TERRACE AREAS, (7) PROPOSED EXTENSIONS TO NORTH AND SOUTH ELEVATIONS OF THE EXISTING BUILDING TO PROVIDE FOR REVISED ELEVATIONAL TREATMENT AND EXTERNAL BALCONIES AT GROUND AND FIRST FLOOR LEVELS, (8) ALTERATIONS AND REFURBISHMENT OF EXISTING HEALTH AND BEAUTY SPA (632 SQ/M) ATTACHED TO THE WEST OF THE HOTEL BUILDING, (9) REPLACEMENT OF EXISTING ONSITE WASTEWATER TREATMENT FACILITIES AND PERCOLATION AREAS WITH NEW ONSITE WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREAS, (10) REFURBISHMENT OF EXISTING CAR PARKING FACILITIES AND CONSTRUCTION OF ADDITIONAL CAR PARKING AREAS TO ACCOMMODATE 143 NO. CAR PARKING SPACES IN TOTAL AND 30 NO. BICYCLE PARKING SPACES AND (11) ALL ASSOCIATED SITE DEVELOPMENT AND LANDSCAPING WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION.
ÓSTÁN GHAOTH DOBHAIR , BÓTHAR NA TRÁ , AN BUN BEAG
ALL CHANGES TO GLENVEAGH HOTEL (AS CONSTRUCTED) FROM WHAT WAS PERMITTED UNDER PREVIOUS PLANNING APPLICATIONS, REFERENCE NUMBERS T.375/93, T.503/93, T1025/91 AND 10/30314
GLENVEAGH HOTEL , ARDNAGAPPERY , DERRYBEG
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?