2051921

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

REMOVAL OF THE EXISTING 'PRAMERICA' SIGN WITH LOGO EXTERNALLY MOUNTED ON THE SOUTH FACING ELEVATION OF EXISTING BLOCK 1

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Dec 2020

  2. Decision: CONDITIONAL

    4 Feb 2021

  3. Decision due

    16 Feb 2021

  4. Grant issued

    8 Mar 2021

Application Details

Location
LISNENNAN , LETTERKENNY , CO DONEGAL
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.74 ha

Timeline

Registration Date
14 December 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
4 February 2021
Grant Date
8 March 2021
Permission Expires
7 March 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

64m
2050953UNCONDITIONAL20 Jul 2020

(A) DEVELOPMENT OF NEW OFFICE FACILITY COMPRISING 1 NO. OFFICE BUILDING CONTAINING 4 NO. THREE STOREY LINKED OFFICE BLOCKS, CENTRAL ENTRANCE/RECEPTION WITH CENTRAL DINING ROOM, COMMERCIAL KITCHEN AND EXTERNAL REFUSE STORAGE AREA. (B) SECURITY GATE HOUSE, BARRIERS AND SECURITY GATES TO EXISTING SITE ACCESS ROAD, EXTEND EXISTING ROAD FROM SITE ENTRANCE INTO NEW CAR PARKING TO FRONT AND REAR OF BUILDING WITH EXTERNAL CIRCULATION AROUND THE BUILDING ACCESSING THE CAR PARKING INCLUDING RAMP TO REAR SERVICE AREA. (C) FORMATION OF NEW VEHICULAR ENTRANCE FOR EMERGENCY VEHICLES WITH SECURITY GATES FROM EXISTING IDA LINK ROAD. (D) 2 NO. SERVICE BUILDINGS EACH CONTAINING A GENERATOR, UPS AND BOILER HOUSE. (E) PROVISION OF PUMP HOUSE AT THE ATTENUATION LAKE. (F) 2 NO. LPG TANKS AND COMPOUND FENCING. (G) CONNECTION TO EXISTING FOUL SEWERAGE SYSTEM AND STORM WATER DRAINAGE SYSTEM VIA AN ATTENUATION LAKE LOCATED TO THE SOUTH OF THE PROPOSED BUILDING WITH FINAL DISCHARGE INTO EXISTING STORM DRAINAGE SYSTEM. (H) VARIOUS FREE STANDING SITE SIGNAGE & FIXED BUILDING SIGNAGE. (I) PROVISION OF 150 NO. BICYCLE RACKS, HARD STANDING, PAVING, LANDSCAPING AND ALL ASSOCIATED SITE WORKS INCLUDING 2 NO. PEDESTRIAN ACCESS STAIRS TO THE REAR ENTRANCE POINTS OF THE BUILDING. (J) GABION WALLS AND OTHER RETAINING STRUCTURES AT CHANGES IN LEVEL WITHIN SITE AND AT SITE BOUNDARIES. (K) PROVISION OF PV / SOLAR PANELS ON THE BUILDING ROOFS. (L) ALTERATIONS TO 2 NO. EXISTING IDA LINK ROAD JUNCTIONS WITH THE N56 INCLUDING ROAD MARKINGS, SIGNAGE ETC. (M) ADDITIONAL STREET LIGHTING TO THE EXISTING IDA LINK ROAD

IDA BUSINESS AND TECHNOLOGY PARK LISNENNAN , CARNAMUGGAGH LOWER AND BALLYRAINE , LETTERKENNY PO

64m
1751634CONDITIONAL31 Oct 2017

(1) RETENTION OF THE EXISTING HARDSTANDING AREA BORDERED WITH KERBING LOCATED TO THE SOUTH EASTERN CORNER OF THE PRAMERICA SITE AND (2) CONSTRUCTION OF A CAR PARK TO THE SOUTH EASTERN CORNER OF THE PRAMERICA SITE WITH CONNECTION TO EXISTING STORM DRAINAGE AND ALL ASSOCIATED WORKS INCLUDING LANDSCAPING AND PUBLIC LIGHTING

PRAMERICA DRIVE , LETTERKENNY BUSINESS & TECHNOLOGY PARK , LISNENNAN

130m
2351089N/A25 Jul 2023

INSTALLATION OF 828 M2 SQUARE METRES OF SOLAR PV (PHOTO VOLTAIC) AND ANCILLARY DEVELOPMENT WORKS

IDA BUSINESS PARK , LETTERKENNY , LETTERKENNY PO

130m
2351230CONDITIONAL18 Aug 2023

828 SQUARE METRES OF SOLAR PV (PHOTO VOLTAIC) AND ANCILLARY DEVELOPMENT WORKS

IDA BUSINESS PARK , LETTERKENNY , CO DONEGAL

197m
2050952CONDITIONAL20 Jul 2020

CONSTRUCTION OF 2 NO. DWELLINGS AND 2 NO. DOMESTIC GARAGES AND ALL ASSOCIATED SITE WORKS INCLUDING CONNECTION TO EXISTING PUBLIC SERVICES

LISNENNAN , LETTERKENNY , CO DONEGAL

210m
2350663CONDITIONAL15 May 2023

CONSTRUCTION OF A NEW ADVANCED BUILDING SOLUTION CONSISTING OF OFFICE AND LIGHT INDUSTRIAL/PRODUCTION SPACES AND VEHICULAR/PEDESTRIAN ENTRANCE, SIGNAGE, CAR PARKING, CYCLE SHELTERS, LANDSCAPING, GAS SKID, UNDERGOUND WATER STORAGE TANK, INDEPENDENT ESB SUBSTATION AND SWITCH ROOM BUILDING, ACCESS ROAD AND ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

IDA BUSINESS AND TECHNOLOGY PARK , CARNAMUGGAGH LOWER , LETTERKENNY PO

231m
2351825CONDITIONAL29 Nov 2023

(1) CONSTRUCTION OF AN ISLAMIC CULTURAL CENTRE TO INCLUDE THE FOLLOWING: (A) PROVISION OF MAIN BUILDING A - CONSISTING OF GROUND FLOOR AND FIRST FLOOR MEZZANINE PRAYER HALL AREAS (MALE / FEMALE), A COFFEE DOCK / SANDWICH BAR AREA WITH ALL ASSOCIATED ANCILLARY SPACES (ENTRANCE LOBBIES / FOYER / CIRCULATION SPACES / STAIRWELLS / LIFT / OFFICES / MEETING ROOM / LIBRARY-TEACHING ROOM / MALE AND FEMALE TOILETS / KITCHENETTE / PLANT ROOM/STORAGE AND (B) PROVISION OF AUXILIARY BUILDING B - CONSISTING OF A MULTIPURPOSE RECREATIONAL ACTIVITY AREA WITH ALL ASSOCIATED ANCILLARY SPACES (ENTRANCE FOYER, MALE/FEMALE TOILETS, KITCHENETTE, PLANT ROOM, STORAGE), (2) CONSTRUCTION OF AN ACCESS ROAD, FOOTPATHS, CAR PARKING / BICYCLE RACK WITH ALL ASSOCIATED RETAINING STRUCTURES, SITE WORKS, LANDSCAPING, BIN ENCLOSURE AND SERVICES, (3) CONNECTION TO THE EXISTING PUBLIC SEWER, SURFACE WATER DRAINAGE AND WATER MAINS SERVICES AND (4) CARRYING OUT ALTERATIONS TO THE PUBLIC ROAD LAYOUT TO ACCOMMODATE A TRAFFIC TURN OFF LANE

LISNENNAN , LETTERKENNY , CO DONEGAL

311m
2460272CONDITIONAL5 Mar 2024

(1) DEMOLITION OF EXISTING DEFECTIVE CONCRETE BLOCK DWELLING HOUSE AND (2) CONSTRUCTION OF REPLACEMENT TWO STOREY DWELLING AND ALL ASSOCIATED SITE WORKS

12 LISNENNAN COURT , LISNENNAN , LETTERKENNY

324m
1950526CONDITIONAL10 Apr 2019

(1) AMENDMENTS TO FRONT OF HOUSE INCLUDING THE REMOVAL OF THE EXISTING PITCHED CANOPY ROOF AND REPLACEMENT WITH A NEW FLAT CANOPY ROOF OVER FRONT DOOR AND NEW STONE CLADDING TO FRONT OF SINGLE STOREY PART OF HOUSE , (2) NEW ATTIC CONVERSION WHICH WILL ALSO INCLUDE 3 NO. VELUX ROOFLIGHTS TO FRONT OF HOUSE, (3) RETENTION OF EXISTING SHED, (4) SMALL EXTENSION TO SIDE OF EXISTING SHED & ALL ASSOCIATED SITE WORKS

11 LISNENNAN COURT , LISNENNAN , LETTERKENNY PO

334m
2562299CONDITIONAL19 Dec 2025

(1) RELOCATION OF SECONDARY BUILDING ENTRANCE WITH NEW ENTRANCE CANOPY ON THE NORTHERN ELEVATION, (2) RECONFIGURATION AND EXTENSION TO EXISTING MEZZANINE LEVEL, (3) RECONFIGURATION OF EXTERNAL FENESTRATIONS ON ALL THREE FACADES INCLUDING AMENDING/FORMATION OF EXISTING/NEW WINDOWS AND DOORS, (4) REMOVAL OF COVERED SMOKING AREA IN EXISTING CARPARK, (5) RECONFIGURATION OF THE EXTERNAL LANDSCAPING AND CAR PARKING LAYOUTS, (6) NEW BUILDING SIGNAGE AND (7) ALL ASSOCIATED WORKS AND SITE WORKS

THE PGIM BUILDING , IDA BUSINESS PARK , BALLYRAINE LETTERKENNY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?