The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2051

CONDITIONAL

Cavan - Cavan County Council

Proposed Development

to retain existing domestic storage shed and for change of use of same to an agricultural storage shed and associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Feb 2020

  2. Decision: CONDITIONAL

    25 Mar 2020

  3. Decision due

    14 Apr 2020

  4. Grant issued

    2 Jul 2020

Application Details

Location
Corravoggy , Kill , Cootehill
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cavan County Council
Site Area
0.54 ha

Timeline

Registration Date
19 February 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 March 2020
Grant Date
2 July 2020
Permission Expires
1 July 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

43m
18370CONDITIONAL5 Sept 2018

of the following to previously approved Planning Reg. - 06/2432, (1) Alterations and changes to house floor plans and elevations, (2) Alterations to plans and elevations to detached domestic garage, (3) Retain existing detached domestic storage shed with separate entrance and (4) Retain alterations to site layout and all associated works

Corravoggy Kill , Cootehill , Co. Cavan

220m
19507CONDITIONAL16 Dec 2019

for development consisting of revisions to the position of the site boundaries of existing two-storey dwelling house from those granted under planning permission reference no. 04/719 together with all ancillary site development works

Corravoggy Kill , Cootehill , Co. Cavan

228m
18502CONDITIONAL28 Nov 2018

to construct a storey & a half style dwelling house, domestic garage form new site entrance onto private laneway and install proprietary mechanical wastewater treatment system

Corravoggy , Kill , Cootehill

248m
19448REFUSED12 Nov 2019

for development consisting of a two-storey dwelling house, domestic garage, wastewater treatment system and percolation area, vehicular entrance, entrance walls and piers together with all ancillary site development works

Corravoggy , Kill Cootehill , Co. Cavan

248m
20172CONDITIONAL13 May 2020

for development consisting of a two-storey dwelling house, domestic garage, wastewater treatment system and percolation area, vehicular entrance, entrance walls and piers together with all ancillary site development works, significant further information and revised plans have been submitted

Corravoggy , Kill , Cootehill

276m
2460238CONDITIONAL29 May 2024

for (1) erection of single storey extension to rear of existing storey and a half style dwelling and alterations to elevations (2) extension to existing domestic garage and all ancillary works

Corravoggy , Kill , Cootehill

288m
17354CONDITIONAL9 Aug 2017

to retain first floor attic conversion to existing detached dwelling, entrance location and site boundary as per previous Planning Ref. No. 00/923 and all associated site works

Corravoggy , Kill , Cootehill

615m
18232CONDITIONAL5 Jun 2018

to retain and complete a two storey dwelling house, domestic garage and entrance onto roadway & PERMISSION to install proprietary mechanical wastewater treatment system, alterations to site boundaries, revised elevational changes and all ancillary site works from that previously granted under planning ref. no. 06/2196

Cornabraher , Tullyvin , Co. Cavan

695m
20456CONDITIONAL14 Oct 2020

to construct a walled silage base with concrete aprons and all ancillary site works

Cordoagh Lower , Kill , Cootehill

721m
18466CONDITIONAL6 Nov 2018

to retain and complete elevational changes to a storey and a half dwelling and detached domestic garage, sewerage treatment unit, percolation area, entrance piers and walls and revised entrance as per previous planning ref. 08/1071 and all associated site works

Cornabragher , Tullyvin Cootehill , Co. Cavan

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?