Proposed Development

construction of a new single storey entry porch to the front elevation of the existing single storey dwelling, alterations to elevations and associated site boundary and site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 May 2020

  2. Decision: CONDITIONAL

    17 Jul 2020

  3. Decision due

    23 Jul 2020

  4. Grant issued

    20 Aug 2020

Application Details

Location
Powerstown , Clonmel , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
29 May 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 July 2020
Grant Date
20 August 2020
Permission Expires
19 August 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

103m
2560352CONDITIONAL24 Apr 2025

as-constructed 3 no. domestic sheds, glasshouse and pergola, including all associated site development works

Powerstown , Clonmel , Co. Tipperary

412m
2460112CONDITIONAL21 Feb 2024

change of use of attached garage to a playroom (as granted under planning permission P.3 10191) and PERMISSION to construct a dining / living room extension to the side, a bedroom extension to the rear and a porch extension to the front of the existing dwelling, along with modifications to the windows and external wall finish and all associated site works

Powerstown , Clonmel , Co. Tipperary

425m
2460969N/A12 Nov 2024

alteration and extension of existing single storey domestic house, to include internal alterations, external elevational alterations, extension to rear and front of existing property and all associated drainage, ground works, landscaping and associated works

Avondale , Mylerstown , Clonmel Co. Tipperary

440m
2461003CONDITIONAL22 Nov 2024

the alteration and extension of existing single storey domestic house, to include internal alterations, external elevational alterations, extension to rear and front of existing property, provision of a new garage, demolition of existing sheds, and all associated drainage, ground works, landscaping and associated works

Avondale , Mylerstown , Clonmel Co. Tipperary

462m
2460209CONDITIONAL25 Mar 2024

(a) single-storey extension to the side and rear of our dwelling, and (b) existing single-storey domestic garage to the rear of our property. PLANNING PERMISSION for the construction of; (i) a two-storey extension to the front of dwelling, (ii) a extension to the side of dwelling at first floor level and all associated site development works

Moorstown , Powerstown , Clonmel

554m
2660648N/A3 Jul 2026

RED III development which will consist of the provision of new electrical plant and equipment, including; 1 no. existing Arc Suppression Coil to be retired and replace with 1 no. new Arc Suppression Coil, extension to control room building (c. 27 m2), associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; and all other ancillary works. (This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply)

ESB Doon 110 kV Substation , Ballyvaughan , Clonmel Co. Tipperary

684m
22471N/A15 Jul 2022

the demolition of existing two storey extension and develop a new two storey extension to rear of existing dwelling and all associated site works.

Horsepasture , Clonmel , Co. Tipperary

700m
2260438CONDITIONAL25 Aug 2022

the demolition of existing two storey extesion and develop a new two storey extension to the rear of the existing dwelling

Horsepasture , Powerstown , Clonmel Co. Tipperary

858m
17600363CONDITIONAL7 Apr 2017

alteration of an existing field entrance and to construct new field entrances to lands along with associated hedgerow realignment

Doon , Rathronan , Clonmel

876m
18601037CONDITIONAL23 Aug 2018

a 5 year permission for the construction of an Energy Storage Facility comprising battery containers and associated infrastructure including combined power conversion systems, grid connection compound, electrical substation, transformers and grid compliance equipment, temporary construction compound, ducting and electrical cabling, fencing, CCTV cameras, landscaping and access tracks

Horsepasture , Clonmel , Co. Tipperary