The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

20594

N/A

Kilkenny - Kilkenny County Council

Proposed Development

to construct a new, two-storey, end terrace dwelling, and all associated site works attached to 20 Greenview, Gowran. To be called 20A Greenview

View the full application file on the council's planning portal →

Application Details

Location
20 Greenview , Gowran , Co Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council

Timeline

Registration Date
8 September 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
2156CONDITIONAL4 Feb 2021

to construct a two storey extension to existing house, also permission to retain mobile home (during construction phase), and all associated site works

20 Greenview , Gowran , Co. Kilkenny

6m
25116CONDITIONAL20 Oct 2025

for (A) planning permission to construct a single storey extension link corridor to side of existing house, also (B) retention permission to retain existing single storey timber frame domestic structure to side of existing house, and all associated site works

20 Green View , Gowran , Co. Kilkenny

8m
20664REFUSED6 Oct 2020

to construct a new, two-storey, end terrace dwelling, including retention of mobile home (during construction phase), and all associated site works attached to 20 Greenview. To be called 20A Greenview,

20 Greenview , Gowran , Co Kilkenny

119m
2660103N/A23 Feb 2026

FOR DEVELOPMENT AT THIS SITE. THE DEVELOPMENT WILL CONSIST OF PLANNING PERMISSION FOR THE CONSTRUCTION OF 20 No. HOUSES AS FOLLOWS: 6 No. DORMER BUNGALOWS (4 BEDROOM), 6 No SEMI-DETACHED HOUSES (3 BEDROOM), 8 No. TERRACED HOUSES IN 2 BLOCKS OF 4 EACH (3 BEDROOM), PLANNING PERMISSION FOR THE CONSTRUCTION OF 8 NO SELF SERVICED SITES FOR THE PROVISION OF ONE HOUSE ON EACH SITE, CONNECTION TO PUBLIC FOUL SEWER, PRIVATE WELL, SURFACE WATER ATTENUTATION WORKS, LANDSCAPING WORKS, BOUNDARY TREATMENTS, RECESSED ENTRANCE AND ALL ASSOCIATED SITE WORKS

GOWRAN , , CO. KILKENNY

126m
2460281CONDITIONAL16 Jun 2024

permission to retain the 0.73 m2 ground floor extension, 22.34 m2 first floor extension and 21.61 m2 services platform at the second floor level, and a permission to redesign the front elevation and all associated site works

Main Street , Gowran , Co. Kilkenny

139m
2460239CONDITIONAL26 May 2024

FOR THE CONSTRUCTION OF 20 No. HOUSES AS FOLLOWS: 8 No. FOUR BEDROOM TWO STOREY SEMI-DETACHED HOUSES IN 4 BLOCKS OF SEMI-DETACHED HOUSES,12 No. THREE BED TWO STOREY SEMI-DETACHED HOUSES IN 6 BLOCKS OF 2 HOUSES OF SEMI-DEATCHED HOUSES, PLANNING PERMISSION FOR THE CONSTRUCTION OF 8 NO SELF SERVICED SITES FOR THE PROVISION OF ONE HOUSE ON EACH SITE, CONNECTION TO PUBLIC FOUL SEWER, CONNECTION TO PUBLIC WATER, SURFACE WATER ATTENUTATION WORKS, LANDSCAPING WORKS, BOUNDARY TREATMENTS, RECESSED ENTRANCE AND ALL ASSOCIATED SITE WORKS.

GOWRAN , CO KILKENNY

157m
2183N/A16 Feb 2021

for development at this site situated at Gowran House NIAH RMP ACA. The development will consist of: for change of use from garden to seasonal campsite. The proposed development will consist of 15 no. seasonal tents. Also 3 no. dry toilets

Gowran House , Main Street , Gowran

157m
21287N/A13 Apr 2021

for change of use from garden to seasonal campsite, The proposed development will consist of 15no. seasonal tent. Also 3 no. dry toilets. NIAH RMP ACA

Gowran House , Gowran , Co. Kilkenny

157m
21175N/A15 Mar 2021

for development at this site situated at Gowran House NIAH RMP ACA. The development will consist of: for change of use from garden to seasonal campsite. The proposed development will consist of 15 no. seasonal tents also 3 no dry toilets

Gowran House ,

178m
21237CONDITIONAL31 Mar 2021

to convert an existing derelict workshop (formerly a house/post office) to a house on lands

Main Street , Gowran , Co. Kilkenny

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?