The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

20634

CONDITIONAL

Clare - Clare County Council

Proposed Development

to RETAIN change of use of an existing agricultural storage building to a commercial warehouse building, the RETENTION of the construction of two commercial warehouse buildings, all to the rear of the site, all to be used for storage ancillary to the adjacent Limerick Blow Moulding factory building and all associated site works both above and below ground

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Sept 2020

  2. Decision: CONDITIONAL

    5 Nov 2020

  3. Decision due

    8 Nov 2020

  4. Grant issued

    6 Dec 2020

Application Details

Location
Gortatogher , Parteen , Co Clare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Clare County Council

Timeline

Registration Date
14 September 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 November 2020
Grant Date
6 December 2020
Permission Expires
5 December 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20489N/A17 Jul 2020

for the change of use of existing agricultural storage sheds to commercial warehouse storage sheds and all ancillary site works both above and below ground

Gortatogher , Parteen , Co. Clare

4m
17604CONDITIONAL4 Aug 2017

to RETAIN an agricultural storage shed and adjacent yard and all ancillary site works both above and below ground

Gortatogher , parteen , Co. Clare

172m
2360316CONDITIONAL17 Aug 2023

for the following: 1. Demolish existing shed to facilitate a rear extension to the existing dwelling. 2. Widen the existing vehicular entrance. 3. Elevational changes to the house. 4. All ancillary site works

School Road , Parteen , Co. Clare

194m
22254CONDITIONAL23 Mar 2022

for a revised site boundary and revised position of a single 800kW wind turbine, 73 metres to hub height as granted under P10/453 and P15/812

Gortatogher , Parteen , Co Clare

246m
19158CONDITIONAL6 Mar 2019

for the construction of a playground area ( circa 120sq.m ), perimeter fencing, drainage and all associated site works at Parteen National School.

Parteen , Co. Clare

299m
17700CONDITIONAL14 Sept 2017

to construct a single storey extension to the rear of the property. a new front porch, and all ancillary site works

Woodstock , Parteen , Co. Clare

301m
2560051CONDITIONAL10 Feb 2025

for a new single storey dwelling house, new domestic garage, new site entrance adjacent to the existing site entrance to serve the existing neighbouring dwelling at Kincora House and all ancillary site works above and below ground

Ballykeelaun , Parteen , Co. Clare V94 N6T2

337m
17276CONDITIONAL19 Apr 2017

to construct a domestic garage and ancillary works

Ballykeelaun , Parteen , Co. Clare

352m
2178CONDITIONAL5 Feb 2021

for a new part single storey, part two storey dwelling house with garage and associated landscaping boundary walls, fences, entrance, and all associated site services and works

Parteen , Co Clare

390m
19211CONDITIONAL25 Mar 2019

for a change of use from an existing commercial unit to a Preschool at the premises known locally as the "Supermarket", R464, Parteen Village, Co. Clare. Works to include the following: 1. Changes to the existing front elevation ( West facing Elevation ) to include the removal of all existing roller shutter blinds and fitting a new natural stone cladding. 2. The provision of 2 pedestrian safety barriers on the footpath outside the proposed Preschool. 3. The provision of a new pedestrian gate to the existing West facing boundary wall, 4. The provision of new doors and windows along the existing South and East facing elevations. 5. Replacing all existing signage with new signage to reflect the nature of the proposed preschool. 6. All ancillary site works

Parteen Village , Parteen , Co. Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?