The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

207019

CONDITIONAL

Limerick - Limerick County Council

Proposed Development

extension of duration for planning ref 15/336

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Aug 2020

  2. Decision: CONDITIONAL

    25 Sept 2020

  3. Decision due

    28 Sept 2020

Application Details

Location
Murphy's Bar , Parnell Street , Limerick
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Limerick County Council

Timeline

Registration Date
4 August 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 September 2020
Permission Expires
26 October 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
25405CONDITIONAL19 Dec 2025

a change of use from a vacant public house to residential, to provide 2 no. apartments consisting of a 2 bed apartment on the ground floor and a 2 bed apartment on the first floor, new pedestrian access at the side of the building and all associated site works

8 Parnell St. , Limerick.

18m
17203CONDITIONAL6 Mar 2017

change of use of a portion of the existing ground floor from its previous retail use a new use as a Medical centre together with all associated signage and incidental ancillary works

18/19 Parnell Street , Limerick

32m
2160CONDITIONAL22 Jan 2021

internal alterations to the ground floor of the existing commercial unit and the change of use of the first and second floor from office and store to a single residential unit and all ancillary works

53 Parnell Street , Limerick

36m
211598CONDITIONAL18 Nov 2021

A) demolition of an existing derelict building comprising of No. 48-50 Parnell Street; B) construct a 6 storey mixed use development in one block with part ground floor commercial consisting of 2 no. retail units(204m2) and the remainder (part ground and all upper floors) to consist of a build to rent (BTR) Residential development (3,100.5m2) with a total of 34 apartments. All apartments provided with private balconies. Residential amenities within the BTR development to include a resident only gym and laundry room at ground floor and communal spaces on upper floors. The proposal will also incorporate a secure internal bicycle parking area, an ESB sub-station, ancillary utility/services rooms, secure bin storage area, public lighting, connections to utilities and all associated engineering and site works necessary to facilitate the proposed development

48-50 Parnell Street , Limerick

37m
2560546CONDITIONAL10 Jun 2025

(a) demolition of an existing two storey building at No. 47 Parnell Street and (b) to construct a 6 Storey Mixed Use Development in a single block with part ground floor commercial consisting of 2 No. Retail units (409m2) and the remainder (part ground floor and all upper floors) to consist of a residential apartment development with a total of 37 no. apartments consisting of 26 No. One Bedroom apartments and 11 No. Two Bedroom apartments. The proposal will incorporate a secure internal bicycle parking area, an ESB sub-station, ancillary utility/services rooms, internal refuse storage area, public lighting, roof top solar panels (optional), connections to adjacent utilities and all associated engineering and site works necessary to facilitate the proposed development at the site

47 - 50 Parnell Street , Limerick

40m
2660134CONDITIONAL11 Feb 2026

the construction of a 6 Storey Mixed Use Development in a single block with part ground floor commercial consisting of 2 No. Retail units (336m2) and the remainder (part ground floor and all upper floors) to consist of a residential apartment development with a total of 32 no. apartments consisting of 21 No. One Bedroom apartments and 11 No. Two Bedroom apartments. The proposal will incorporate a secure internal bicycle parking area, an ESB sub-station, ancillary utility/services rooms, internal refuse storage area, public lighting, roof top solar panels (optional), connections to adjacent utilities and all associated engineering and site works necessary to facilitate the proposed development at the site

48 - 50 Parnell Street , Limerick City , Limerick

80m
2460846CONDITIONAL22 Aug 2024

metal fence and gates and all associated site works

1-4 Parnell Street , Limerick , Limerick

82m
2460640N/A26 Jun 2024

a metal fence and gates, and all associated site works

1-4 Parnell Street , Limerick City , Limerick.

87m
2660865N/A29 Jul 2026

7 Year Permission is sought for a Large-scale Residential Development (LRD) comprising the construction of a Purpose-Built Student Accommodation (PBSA) scheme at Dominick Street (Lady’s Lane / Hunts Lane), Limerick City. The proposed development will comprise the following: (a) permission to partially demolish the existing Tait Centre building, and (b) permission for the construction of a single multi-storey block ranging in height from six to eight storeys and providing 350 student bedspaces arranged across 51 no. Apartments/Clusters with shared kitchens and living rooms, with a Gross Internal Floor Area of 9,314 sqm. Communal facilities will include a café, gym, cinema, study rooms, laundry, and indoor and covered outdoor bicycle storage providing 129 no. spaces. A total of 1,204 sqm of amenity space will be provided, comprising 487 sqm of landscaped outdoor courtyards and rooftop terraces and 717 sqm of indoor communal areas. Rooftop photovoltaic solar panels, green roofs, blue roofs, and biodiversity enhancement measures including swift boxes, bat boxes, or other avian or bat roosting features will be incorporated into the development as required. Supporting infrastructure at ground floor level will include plant rooms, refuse storage and collection areas, service zones, and a dedicated ESB substation. The development will be accessed on a pedestrian and cycle priority basis, with zero car parking. Permission is also sought for use of the accommodation, outside of student term time, for short-term letting purposes. All ancillary and associated site development works, including footpaths, drainage, public lighting, water supply, and sustainable urban drainage systems, will be provided

Lady's Lane and Hunts Lane , Off Dominick Street , Limerick

92m
171103CONDITIONAL28 Nov 2017

a change of use of the first & second floors of the building from office use to 8 residential apartments and an extension of the building to form a third floor comprising 4 apartments and alteration of the existing elevations and canopy and connections to existing services and associated site works

1-4 Parnell Street , Limerick.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?