2078

REFUSED

Laois - Laois County Council

Proposed Development

construct up to 8 no. wind turbines with a tip height of up to 185 metres and all associated foundations and hardstanding areas; 1 no. on-site electrical substation; 1 no. temporary construction compound; all associated underground electrical and communications cabling connecting the turbines to the proposed on-site electrical substation; provision of new site access tracks and upgrading of existing access tracks and associated drainage; erection of 1 no. permanent meteorological mast of up to 110m in heights; works to facilitate the delivery of turbines adjacent to the N80 within the townlands of Dernacart and Forest Upper to include the laying of temporary surfacing; tree felling; and all associated site development works, ancillary works and equipment. Permission is sought for a period of 10 years and an operational life of 30 years from the date of commissioning of the entire wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Feb 2020

  2. Further information requested

    2 Jun 2020

  3. Further information received

    10 Mar 2021

  4. Decision: REFUSED

    30 Apr 2021

  5. Decision due

    4 May 2021

  6. Appeal submitted

    26 May 2021

  7. Appeal decided: CONDITIONAL

    3 Jan 2024

Application Details

Location
Townlands of Dernacart Forest Upper & Forest Lower , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
48.38 ha

Timeline

Registration Date
17 February 2020
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
30 April 2021
Permission Expires
2 January 2034

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-310312-21
Decision
CONDITIONAL
Submitted
26 May 2021
Decided
3 January 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

509m
19544N/A27 Sept 2019

construct a cottage style bungalow, septic tank & percolation area and all ancillary site development works

Forrest Upper , Mountmellick , Co. Laois

525m
19448N/A2 Aug 2019

construct a cottage style bungalow, septic tank and percolation area and all ancillary site development works

Forest Upper , Mountmellick , Co.Laois

1.2km
2460274CONDITIONAL21 May 2024

(A) construct a dwelling house, detached garage/shed, wastewater treatment system, new entrance and all associsted site works, (B) the relocation of an existing field entrance gate.

Forest Upper , Mountmellick , Co. Laois

1.6km
2560627CONDITIONAL30 Sept 2025

construct log cabin with new septic tank and percolation area and for retention of existing mobile home on site for the duration of the project

Forest Lower , Mountmellick , Portlaoise

1.6km
23173CONDITIONAL13 Jun 2023

to revise the site boundaries previously granted under planning ref no 07/1116 and 21/886

Forest Upper , Mountmellick , Co. Laois

1.6km
20467CONDITIONAL16 Sept 2020

(1)construct dwelling house, detached domestic garage/shed, waste water treatment system and all associated site works; (2) remove existing foundations/substructure

Forest Lower , Mountmellick , Co. Laois

1.7km
2360127CONDITIONAL4 Apr 2023

construct new agricultural entrance and all associated site works

Forest Lower , Mountmellick , Co. Laois

1.7km
2560282REFUSED12 May 2025

retain existing Garage including Stables with new site Entrance and Planning Permission for a Proposed Dwelling House, Secondary Treatment System & soil polishing filter and to include all associated site works

Forest Lower , Mountmellick , Co. Laois

1.7km
19732N/A23 Dec 2019

develop a wind farm and all associated site works within the townlands of Dernacart, Forest Upper and Forest Lower, Co. Laois. The development will consist of: up to 8 no. wind turbines with a tip height of up to 185 meters and all associated foundations and hardstanding areas; 1 no. on-site electrical substation, 1 no. temporary construction compound; all associated underground electrical and communications cabling connecting the turbines to the proposed on-site electrical substation; provision of new site access tracks and upgrading of existing access tracks and associated drainage; erection of 1 no. permanent meteorological mast of up to 110m in height; works to facilitate the delivery of turbines adjacent to the N80 within the townland of Dernacart and Forest Upper to include the laying of temporary surfacing; tree felling; and all associated site development works, ancillary works and equipment. Permission is sought for a period of 10 years and an operational life of 30 years from the date of commissioning of the entire wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been in prepared in respect of the proposed development.

Dernacart Forest Upper & Forest Lower , Co. Laois

1.8km
20276CONDITIONAL9 Jun 2020

retain front porch and entrance gate

Garrymore , Geashill , Co. Offaly

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?