The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

20794

N/A

Kildare - Kildare County Council

Proposed Development

construction of a dormer bungalow, connection to existing mains sewer, and all associated ancillary siteworks

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jul 2020

  2. Further information requested

    11 Sept 2020

  3. Application withdrawn

    9 Sept 2021

Application Details

Location
Cushalla , Allenwood Derrymullen Td. , Robertstown
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.25 ha
Floor Area
237.3 sq m
Residential Units
1

Timeline

Registration Date
20 July 2020
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
9 September 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

117m
22509CONDITIONAL3 May 2022

sought to erect a gas operated crematorium facility to include: (a) Crematorium with administration office; (b) Gas storage compound; (c) Wastewater treatment system with raised polishing filter; (d) Access road from the existing Wellbrook embalming centre and chapel of rest with extensive landscaping and screening and all associated site works. Revised by Significant Further Information which consists of (1) change site levels to mitigate flood risk and (2) to connect and discharge to the public foul sewer

Derrymullen , Allenwood , Naas

199m
2460147CONDITIONAL21 Feb 2024

for to construct a new single-storey extension to the rear and side of the existing house, general internal alterations in the existing house, install a new garden shed in the rear garden and carry out all associated external site works

2 Bond Bridge Park , Allenwood Middle , Naas

202m
268N/A19 Jan 2026

of 20/644 which consists of the reconstruction and conversion of existing two span haybarn, the construction of link building joining it to existing bungalow, all to create 2 No. two bedroom holiday apartments with new entrance to public road and all site works

Bond House , Derrymullen , Robertstown Naas

205m
20644CONDITIONAL22 Jun 2020

the reconstruction and conversion of existing two span haybarn, the construction of link building joining it to existing bungalow, all to create 2 No. two bedroom holiday apartments with new entrance to public road and all site works

Bond House , Derrymullen , Robertstown Naas

208m
2623REFUSED16 Feb 2026

Extension of duration 20/644. Reconstruction and conversion of existing two span haybarn, the construction of link building joining it to existing bungalow, all to create 2 no two bedroom holiday apartments with new entrance to public road and all site works.

Bond House Derrymullen , Robertstown , Naas

220m
211453N/A8 Oct 2021

the construction of a new housing development consisting of 6 No. dwellings: (i) 4 No. two storey, 2 bedroom terraced houses and (ii) 2 No. two storey, 2 bedroom end of terrace houses, connection to existing public foul and surface water drainage, proposed new vehicular entrance, associated boundary treatments and all associated site development works

Allenwood Cross , Allenwood , Co. Kildare.

229m
1949REFUSED23 Jan 2019

the construction of a family flat, onto the eastern side of an existing dwelling

Bluetown , Allenwood North , Co. Kildare.

237m
23812CONDITIONAL27 Jul 2023

(1) To retain garage conversion to kitchen with "A" roof over, (2) to retain domestic store, (3) to retain fuel store and garage, (4) to retain lean-to conservatory to rear of existing dwelling with all associated services and works

Allenwood Middle , Allenwood , Co.Kildare

239m
20316CONDITIONAL26 Mar 2020

the construction of a family flat, onto the eastern side of an existing dwelling

Bluetown , Allenwood North , Co. Kildare.

259m
181090CONDITIONAL5 Sept 2018

the erection of dormer bungalow and associated site works

Allenwood North , Allenwood , Naas

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?