20794
N/AKildare - Kildare County Council
Proposed Development
construction of a dormer bungalow, connection to existing mains sewer, and all associated ancillary siteworks
View the full application file on the council's planning portal →Application Timeline
Application received
20 Jul 2020
Further information requested
11 Sept 2020
Application withdrawn
9 Sept 2021
Application Details
- Location
- Cushalla , Allenwood Derrymullen Td. , Robertstown
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.25 ha
- Floor Area
- 237.3 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 20 July 2020
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 9 September 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
sought to erect a gas operated crematorium facility to include: (a) Crematorium with administration office; (b) Gas storage compound; (c) Wastewater treatment system with raised polishing filter; (d) Access road from the existing Wellbrook embalming centre and chapel of rest with extensive landscaping and screening and all associated site works. Revised by Significant Further Information which consists of (1) change site levels to mitigate flood risk and (2) to connect and discharge to the public foul sewer
Derrymullen , Allenwood , Naas
for to construct a new single-storey extension to the rear and side of the existing house, general internal alterations in the existing house, install a new garden shed in the rear garden and carry out all associated external site works
2 Bond Bridge Park , Allenwood Middle , Naas
of 20/644 which consists of the reconstruction and conversion of existing two span haybarn, the construction of link building joining it to existing bungalow, all to create 2 No. two bedroom holiday apartments with new entrance to public road and all site works
Bond House , Derrymullen , Robertstown Naas
the reconstruction and conversion of existing two span haybarn, the construction of link building joining it to existing bungalow, all to create 2 No. two bedroom holiday apartments with new entrance to public road and all site works
Bond House , Derrymullen , Robertstown Naas
Extension of duration 20/644. Reconstruction and conversion of existing two span haybarn, the construction of link building joining it to existing bungalow, all to create 2 no two bedroom holiday apartments with new entrance to public road and all site works.
Bond House Derrymullen , Robertstown , Naas
the construction of a new housing development consisting of 6 No. dwellings: (i) 4 No. two storey, 2 bedroom terraced houses and (ii) 2 No. two storey, 2 bedroom end of terrace houses, connection to existing public foul and surface water drainage, proposed new vehicular entrance, associated boundary treatments and all associated site development works
Allenwood Cross , Allenwood , Co. Kildare.
the construction of a family flat, onto the eastern side of an existing dwelling
Bluetown , Allenwood North , Co. Kildare.
(1) To retain garage conversion to kitchen with "A" roof over, (2) to retain domestic store, (3) to retain fuel store and garage, (4) to retain lean-to conservatory to rear of existing dwelling with all associated services and works
Allenwood Middle , Allenwood , Co.Kildare
the construction of a family flat, onto the eastern side of an existing dwelling
Bluetown , Allenwood North , Co. Kildare.
the erection of dormer bungalow and associated site works
Allenwood North , Allenwood , Naas
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?