20845
REFUSEDWaterford - Waterford City and County Council
Proposed Development
for amendments to Knocknamona Windfarm previously authorized under An Bord Pleanala Ref No. PL93.244006, Waterford City and County Council Ref. No. 14/600109. The amendments consist of: 1. An increase in the uppermost tip height of the eight previously authorized wind turbines from up to 126 meters to up to 155 meters. 2. Amend the height and design of the previously authorized meteorological mast from a tubular tower mast up to 80m in height to a lattice tower mast up to 99 m in height. The application is accompanied by an Environmental Impact Assessment Report and Appropriate Assessment Reporting
View the full application file on the council's planning portal →Application Timeline
Application received
13 Nov 2020
Decision: REFUSED
14 Jan 2021
Decision due
16 Jan 2021
Appeal submitted
10 Feb 2021
Appeal decided: CONDITIONAL
28 Sept 2022
Application Details
- Location
- Knocknaglogh Lower/Barranastook Upper/ , Knocknamona/Woodhouse or Tinakilly/ , Monageela/Killatoor townlands
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
Timeline
- Registration Date
- 13 November 2020
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 14 January 2021
- Permission Expires
- 27 September 2027
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-309412-21
- Decision
- CONDITIONAL
- Submitted
- 10 February 2021
- Decided
- 28 September 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for amendments to Knocknamona Windfarm previously authorized under An Bord Pleanala Ref. No. PL93.244006, WCCC Ref. No. 14/600109. The amendments consist of a) An increase in the uppermost tip height of the eight previously authorized wind turbines from up to 126 meters to up to 155 meters. b) Amend the height and design of the previously authorized meteorological mast from a tubular tower mast up to 80m in height to a lattice tower mast up to 99m in height. The application is accompanied by an Environmental Impact Assessment Report and Appropriate Assessment Reporting.
Knocknaglogh Lower/Barranastook Upper/Knocknamona/ , Woodhouse or Tinakilly/Monageela/ , Killatoor townlands
the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind turbines within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. turbines previously authorized in 2022 under reference 309412-21). The turbine rotor diameter size within the range 133m to 138m inclusive; turbine hub height within the range 90m to 92.5m inclusive – all within an overall tip height of 159m. b) Construction of 8 No. turbine foundations and adjacent hard-core crane hardstandings. There are minor changes to the alignment of some hardstandings, to those previously authorised. c) A Windfarm Substation compound including two control buildings and outdoor electrical equipment and apparatus. The windfarm substation is in the same location and is larger than previously authorised. d) Windfarm site access roads comprising widening and upgrading of 6.8km of existing forestry roads and construction of 1.2km of new access roads. The proposed site access roads involve some realignment to those previously authorised. e) One (1) 90m lattice tower mast with meteorological equipment attached, in the same location and 9m lower than previously authorised. f) Felling of 29.8ha of commercial forestry. g) Underground cabling linking the wind turbines and meteorological mast to the Windfarm Substation; and h) All ancillary, associated and facilitating works and activities including widening of an existing forestry entrance to create the main windfarm entrance at Knocknaglogh Lower; a surface water drainage system; two temporary borrow pits and a temporary site compound. i) This application is seeking a ten-year permission and a 35-year operational period from date of commissioning of the Windfarm. This development is a Windfarm Renewable Energy Directive III (RED III) Development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU ) 2023/2413)
Knocknaglogh Lower/ Barranastook Upper/ Knocknamona/ Woodhouse or Tinakilly/ Monageela/ Killatoor townlands , Dungarvan , County Waterford
development of Knocknamona Windfarm Grid Connection (KWF Grid Connection) development which comprises; a)1940m of underground medium voltage electrical cabling(up to 33kV), in Keereen Upper & Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) & Woodhouse 110kV Substation(operational). b) Works within the existing Woodhouse 110kV Substation compound in Keereen Upper, comprising a new control building 5.3m x 3.6m & 4.6m high; main 110kV transformer c6m in height, with associated plinth and bund; a 110kV transformer bay; 2no. lightening masts 17.5m in height & ancillary electrical equipment. Works will also include a new access track 17m long & 4.5m in width; additional palisade gateway 4.9m wide & 2.6m in height with palisade fencing within the compound & 2 no. gateways in the existing perimeter fence. The fencing & gateways will be same height & width as the existing fence & gates; c) A Link Road, 190m in length & 4.5m in width connecting the existing forestry road network at Knocknamona Windfarm to the existing Woodhouse Windfarm roads. It is proposed to use this link road & the existing Woodhouse Windfarm roads to facilitate the delivery of the main components to Knocknamona Windfarm. d) The widening of 960m of existing forestry road by 1m, in Knocknamona townland to facilitate the delivery of the main components to Knocknamona Windfarm &; e) Ancillary site works. An Environmental Impact Assessment Report & Appropriate Assessment Report (Stage 1 Screening) have been prepared in respect of this application.
Keereen Upper/Woodhouse or Tinakilly/Knocknamona Townlands , Dungarvan , Co. Waterford
development of Knocknamona Windfarm Grid Connection (KWF Grid Connection) development which comprises; a)1940m of underground medium voltage electrical cabling(up to 33kV), in Keereen Upper & Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) & Woodhouse 110kV Substation(operational). b) Works within the existing Woodhouse 110kV Substation compound in Keereen Upper, comprising a new control building 5.3m x 3.6m & 4.6m high; main 110kV transformer c6m in height, with associated plinth and bund; a 110kV transformer bay; 2no. lightening masts 17.5m in height & ancillary electrical equipment. Works will also include a new access track 17m long & 4.5m in width; additional palisade gateway 4.9m wide & 2.6m in height with palisade fencing within the compound & 2 no. gateways in the existing perimeter fence. The fencing & gateways will be same height & width as the existing fence & gates; c) A Link Road, 190m in length & 4.5m in width connecting the existing forestry road network at Knocknamona Windfarm to the existing Woodhouse Windfarm roads. It is proposed to use this link road & the existing Woodhouse Windfarm roads to facilitate the delivery of the main components to Knocknamona Windfarm. d) The widening of 960m of existing forestry road by 1m, in Knocknamona townland to facilitate the delivery of the main components to Knocknamona Windfarm &; e) Ancillary site works. An Environmental Impact Assessment Report & Appropriate Assessment Report (Stage 1 Screening) have been prepared in respect of this application.
Keereen Upper/Woodhouse or , Tinakilly/Knocknamona Townlands , Dungarvan
for development comprising of : a) 1940m of underground electrical cabling in Keereen Upper and Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) to the Woodhouse Substation (operational). b) Works within the existing Woodhouse Substation compound in Keereen Upper, comprising a new control building 5.3m X 3.8m and 4.6m high; a 110kV electrical transformer c.6m in height, with associated plinth and bund; an electrical transformer bay; 2 No. lightening masts 17.5m in height and ancillary electrical equipment. Works within the Woodhouse Substation compound will also include a new access track 17m long and 4.5m in width; additional palisade gateway 4.9m wide and 2.6m in height with palisade fencing within the compound and 2 No. gateways in the existing perimeter fence. c) A Link Road, 190m in length and 4.5m in width connecting the existing forestry road network at Knocknamona Windfarm to the existing Woodhouse Windfarm access roads. It is proposed to use this Link Road and the existing Woodhouse Windfarm access roads to facilitate the delivery of turbine components to Knocknamona Windfarm. d) The widening of 960m of existing forestry road by 1m, in Knocknamona townland to facilitate the delivery of turbine components to Knocknamona Windfarm and;e) all ancillary site works.
Keereen Upper Woodhouse or Tinakilly and Knocknamona , Dungarvan , County Waterford
construct a two-storey dwelling and garage, entrance and driveway, wastewater treatment plant and percolation area, with a bore hole, landscaping and all ancillary site works
Ballymullala East , Cappagh , Dungarvan
The construction of a single storey dwelling, detached garage, septic tank & percolation area, vehicular entrance & all associated site works
Barranastook Lower , Cappagh Dungarvan , Co. Waterford
Single storey dwelling, effluent treatment system & percolation area, vehicular entrance & all associated siteworks
Barranastook Lower , Cappagh Dungarvan , Waterford
Single storey dwelling, effluent treatment system & percolation area, vehicular entrance & all associated siteworks
Barranastook Lower , Cappagh Dungarvan , Waterford
Two storey dwelling house, garage, entrance, septic tank and percolation area and all ancillary site works.
Ballymulalla East , Cappagh , Co. Waterford.