20941
CONDITIONALLimerick - Limerick County Council
Proposed Development
the construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
18 Sept 2020
Further information requested
11 Nov 2020
Further information received
24 Nov 2020
Decision: CONDITIONAL
2 Dec 2020
Decision due
21 Dec 2020
Grant issued
15 Jan 2021
Application Details
- Location
- Portnane , Pallasgreen , Co. Limerick.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
- Floor Area
- 175 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 18 September 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 2 December 2020
- Grant Date
- 15 January 2021
- Permission Expires
- 14 January 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of a dwelling house, waste water treatment system and percolation area, entrance, garage and all ancillary site works
Portane , Pallasgreen , Co. Limerick
construction of a domestic garage and ancillary works
Portane , Pallasgreen , Co. Limerick
construction of a dwelling house, site entrance, and install a packaged waste water treatment system with polishing filter and all associated site works
Portane , Pallasgreen , Co. Limerick.
a 10-year permission and 35 year operation for a solar farm on four land parcels as described herein; North Parcel(Gortnakistin townland) approximately 23.78 hectares, Central Parcel(Ballyvalode & Keeloges townlands) approximately 43.49 hectares, South Central Parcel(Gortyvahane and Moanroe townlands) approximately 34.7 hectares, South Parcel(Garryduff, Moanroe, Moanoola and Kilmacogue townland) approximately 39.27 hectares. The Central Parcel, South Central Parcel and South Parcel are collectively referred to as the Main Solar Farm; a route corridor of 0.58 hectares for an underground internal network cable along the R507 and L5040 public roads for approximately 600 metres and within the solar farm lands for approximately 1,260 metres. The total site area for the proposed development is approximately 141.8 hectares. The proposed development on these parcels comprises of 755,000sqm of solar photovoltaic panels on ground mounted steel frames; inverter/transformer stations; underground power and communication cables and ducts; boundary security fencing; new internal access tracks; associated drainage infrastructure; site entrances to the R507 public road(site entrance to main solar farm) and the L5040 public local road(North Parcel); CCTV cameras and all associated site services and works. Works for the internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 560 metres on the R507 Regional Road, approximately 100 metres on the L5040 Local Road and approximately 1,260m within the solar farm lands. As part of a separate Strategic Infrastructure Development(SID) planning application provision of a 110kV electrical substation with electrical control building, associated compound with palisade fence and 2no. overhead line masts, which is to be located within the main solar farm, will be lodged with An Bord Pleanála in due course. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
Ballyvalode Garryduff Gortnakistin Gortyvahane Keelogs Kilmacogue Moanoola and Moanroe , Co. Limerick
1. demolishing of flat roofed area at rear of existing dwelling. Removal of existing front door, replaced with a window. Alteration to existing eaves line to accommodate new external insulation with render finish. Removal of existing chimney and replacing existing tiled roof with slates. 2. The construction of an extension to the rear of the remaining dwelling house, 3. Decommission of existing site entrance and the construction of a new site entrance. 4. Decommission of existing septic tank and the installation of a packaged waste water treatment system with polishing filter, and all associated site works
Ballyvalode , Oola , Co. Limerick.
a 10-year permission for the construction of a 110kV ‘Loop In-Loop Out’ (LILO) substation and associated works on a site of approximately 6.20 hectares. This will include the following: A substation occupying 2.11 hectares, comprising: TSO (Eirgrid) compound with electrical equipment, transformer sub-compound, bus bars sub-compound, cable chairs and substation building (435m2), enclosed by palisade fencing at 0.95 hectares in area. One transformer up to 110kV within the TSO compound and the provision of an area for a second transformer if future Eirgrid expansion is required. Required TSO expansion area enclosed by palisade fencing at 0.79 hectares. Operators compound (with switchroom building, electrical equipment, rainwater collection system) enclosed by palisade fencing at 0.17 hectares. The proposed operators control building will have a gross floor area of approximately 220m2. Perimeter protection area at 0.20 hectares. 7 No. lightning masts to a height of approximately 18m. 1 No. telecoms pole to a height of approximately 20m. Additional space for the possible future requirements for a Harmonics Filter. New entrance to the R507 regional road shared with the proposed solar farm. 5m access road corridor (approx. 1,160m long), and underground cabling route to the substation occupying an area of 3.24ha. Underground cable corridor of approximately 320m in length and provision of 2 no. 16m high mast structures linking proposed substation to adjacent existing overhead 110kV transmission line. Associated construction works and drainage infrastructure
Ballyvalode , Near Oola , Co. Limerick
the construction of a new dwelling house, effluent treatment system & percolation area, new entrance, driveway, boundary alterations as may be required, associated siteworks as may be required
Ballyvalode , Oola , Co. Limerick
the construction of a single storey extension to the rear of house, porch to the front of house, associated alterations to elevations and internal modifications together with all associated site works. Planning permission is also being sought to upgrade the existing treatment system and polishing filter, which was previously permitted under planning ref 13/500
Gortnakisteen , Pallasgreen , Co. Limerick
the construction of an extension to the side and front of the original dwelling and Planning Permission is sought for a new wastewater treatment system and all associated site works
Portane , Oola , Co. Limerick.
a side extension which extends out past the front building line of the original dwelling house and all associated ancillary works
Portane , Oola , Co Limerick
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?