20960
REFUSEDLimerick - Limerick County Council
Proposed Development
2 no. as constructed dry stores and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
24 Sept 2020
Further information requested
17 Nov 2020
Further information received
14 May 2021
Decision: REFUSED
9 Jun 2021
Decision due
10 Jun 2021
Application Details
- Location
- Kells , Dromcollogher , Co. Limerick
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 24 September 2020
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 9 June 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for (a) permission to retain change of use to existing agricultural buildings to steel fabrication unit including change of use from agricultural storage outbuildings to storage in association with steel fabrication premises, (b) permission to retain construction of 3 No. Extensions to existing buildings incorporating (i) machine shop incorporating specialist steel saw, (i) external canopy and (iii) extension to existing workshop incorporating set out area and storage, (c) permission to retain existing 2 No. portacabins on site for purposes of office, staff canteen and staff toilet, together with permission to retain all ancillary site works associated with the change of use including concreting of yard areas, external rollers for movement of steel, construction of walls, and connection to existing septic tank and percolation area
Kells , Dromcollogher , Co. Limerick
a constructed cubicle house and slurry storage tank and as constructed dairy building, and planning permission for a new calf shed and a new agricultural building comprising dry feed store, machinery store and feed passage and all associated site works
Kells , Dromcollogher , Co. Limerick.
2 no. as constructed silage pits and walls and associated site works
Kells , Dromcollogher , Co. Limerick.
the construction of a single-storey dwelling house, domestic garage, entrance, drive-way, wastewater treatment unit, polishing filter & all ancillary site works
Kells , Dromcollogher , Co. Limerick
the demolition of existing rear extension to existing cottage, alterations to existing cottage, demolish existing chimney and replace with new chimney, permission to construct a new storey and a half type extension including single storey link corridor to rear of existing cottage, waste water treatment unit, polishing filter and all ancillary site works
Mondellihy , Dromcollogher , Co Limerick
construction of a 18m x 5m hurling wall and carry out all associated site works
Hazelwood College , Dromcollogher , Co. Limerick.
construction of an extension to the existing dwelling house and modifications to the existing dwelling house, together with all associated site works
Mondelihy , Dromcollogher , Co. Limerick
installing an escape door out of bedroom and to construct a new stand alone laundry room at the rear of the existing building and to demolish existing laundry room
Coolaboy , Dromcollogher , Co. Limerick.
demolition of an existing smoking room to the front of the building along with adjacent shed and construction of a single storey extension to the front of the existing building and all associated site works
Coolaboy , Dromcollogher , Co. Limerick
Uisce Éireann intends to apply for a 10-year planning permission to construct a new wastewater treatment plant (WwTP) at Coolaboy, Dromcollogher, Co. Limerick. The Proposed Development will comprise the construction of a new WwTP to provide treatment capacity for a population equivalent (PE) of 1,350 (10 years) and 1,550 (30 years). The wastewater will be treated and discharged via an outfall pipe into the River Deel at a location approximately 6.5 kilometres to the northwest of the WwTP. The outfall pipe will be located primarily in public roads in the townlands of Coolaboy, Mundellihy, Ballinlongig, Cloonmore and Tulligmacthomas. The existing WwTP will be decommissioned and demolished upon completion of the Proposed Development. The Proposed Development will comprise: i) Development of a new preliminary wastewater treatment plant including infrastructure such as bypass channels and screens; grit and fats, oils, greases (FOG) removal plant; storm water overflow tank; sludge drying reed beds; flash mixer chamber; return liquor pumping station facilities; caustic and ferric dosing storge tanks; flow to full treatment (FFT) pumping station; final settlement tank flow split chamber; 2 no. final clarifiers; sludge draw off chamber (return-activated sludge and waste-activated sludge pumping station); static mixer; wash water pumping station; tertiary disk filter; and final effluent pumping station. ii) Development of an ESB sub-station, control building, and fuel tank. iii) Provision of approx. 54m of new gravity sewer to direct flows to the new WwTP. This will replace an existing combined sewer overflow which will be decommissioned after the process switchover. iv) Provision of adequate site lighting, access gates, access stairs, walkways, car parking and electric charging facilities, and site boundary hedging and fencing. v) Provision of photovoltaic (PV) panels on the site of the existing WwTP following its decommissioning. vi) Provision of site drainage infrastructure including a hydrocarbon interceptor, construction of outfall pipe along public roads, and headwall in Tulligmacthomas. vii) Realignment and widening of existing site entrance, including provision of a new access road into the site and a bridge within the site. viii) All hard and soft landscaping throughout the site, and all associated and ancillary site works. The Proposed Development will be accompanied by a Natura Impact Statement (NIS)
Coolaboy Dromcollogher and , Mundellihy Ballinlongig Cloonmore Tulligmacthomas Cloonpasteen , Co. Limerick.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?