20974
CONDITIONALMayo - Mayo County Council
Proposed Development
CONSTRUCTION OF AN EXTENSION TO AN EXISTING INDUSTRIAL UNIT AND FOR RETENTION OF SIGNAGE TO THE FRONT OF THE EXISTING BUILDING
View the full application file on the council's planning portal →Application Timeline
Application received
10 Dec 2020
Further information requested
11 Feb 2021
Further information received
23 Feb 2021
Decision: CONDITIONAL
15 Mar 2021
Decision due
22 Mar 2021
Grant issued
19 Apr 2021
Application Details
- Location
- UNIT 4 BUNREE INDUSTRIAL ESTATE , BUNREE ROAD , BALLINA
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
Timeline
- Registration Date
- 10 December 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 March 2021
- Grant Date
- 19 April 2021
- Permission Expires
- 18 April 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to a) Subdivide the property into 2 separate properties, b) Create a new entrance and c) retain 3 number ancillary buildings on site along with all associated site works
Bunree Industrial Estate , Abbeyhalfquarter , Ballina Co. Mayo
CHANGE OF USE OF PART OF EXISTING BUILDING TO RETAIL USE. PERMISSION IS ALSO SOUGHT FOR EXTERNAL SIGNAGE TO THE EXISTING FRONT ELEVATION AS SHOWN ON PLANS AND ALL ANCILLARY SITE DEVELOPMENTS
BUNREE INDUSTRIAL ESTATE , ABBEYHALFQUARTER , BALLINA
The construction of a single storey extension to the side of the existing dwelling house and for all associated site works on this site.
107 Greenhills Estate , Ballina , Co Mayo
Full planning permission for the following: 1. The demolition of the existing Sean Duffy Community Centre 2. The construction of a new proposed community centre and sports facility ancillary to Ardnaree Sarsfields sport pitch 3. The provision of new carpark, all this together with connection to services and all associated site works
Abbeyhalfquarter , Ballina , Co.Mayo.
CONSTRUCT A NEW ASTRO TURF (MUGA) ALL-WEATHER PITCH TOGETHER WITH 2 NO. GOALPOSTS. CONSTRUCTION OF 2 NO. 9.00M WIDE X 5.00M HIGH "HURLING WALL" COMPLETE WITH BUTTRESS SUPPORTS AS NECESSARY AND 1.0M HIGH BALL STOP NETTING ABOVE (TOTAL HEIGHT =6.00M) PROVISION OF 2.50M HIGH WIRE MESH SECURITY FENCE INCORPORATING ACCESS GATES WITH 3.5M HIGH BALL STOP NETTING AND ASSOCIATED SUPPORT POLES ABOVE FENCE (TOTAL HEIGHT=6.00M) TO PERIMETER OF PROPOSED NEW ASTRO TURF (MUGA) PITCH. PROVISION OF 4 NO. 12M HIGH OCTAGONAL GALVANISED STEEL FLOODLIGHT COLUMNS, EACH COMPLETE WITH 3 NO. LED FLOODLIGHT LUMINAIRES . ALL THE ABOVE TO INCLUDE ALL ANCILLARY SITE DEVLOPMENT WORKS
ABBEYHALFQUARTER , BALLINA
Construct single storey extension to the eastern side elevation and to carry out ancillary site works
28 Greenhill Estate , Ballina , Co Mayo
Planning permission for development consisting of the following (1) Change of use from existing light industrial (P02/2256 Refers) to recreational/Leisure facility (2) building signage to front elevation (3) Amend existing car parking and provide bicycle parking, (4) and the carrying out of all associated ancillary site works at Abbeyhalfquarter, I.D.A. Industrial Estate, Bunree, Ballina, Co. Mayo.
Abbeyhalfquarter , IDA Industrial Estate , Bunree Ballina Co. Mayo
an extension and alterations to an existing house at 6 Greenhills estate, Ballina, Co Mayo
6 Greenhills Estate , Ballina , Co Mayo
CONSTRUCTION OF THE FOLLOWING: NO. 1 MULTI USE GAMES AREA, FOOTPATHS AND ASSOCIATED SITE WORKS TO THE REAR OF THE EXISTING GYMNASIUM AND NO. 2 ADJUSTMENTS TO EXISTING CAR PARK/HARDSTAND AREA TO THE REAR OF THE EXISTING SCHOOL
ABBEYHALFQUARTER , BALLINA , CO. MAYO
TEMPORARY CHANGING FACILITIES AND ALL ASSOCIATED SITE WORKS
BUNREE ROAD , ABBEYHALFQUARTER , BALLINA
Planning a project of your own?
Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.
Do I Need Permission?