21/6472
CONDITIONALCork - Cork County Council
Proposed Development
The replacement of two existing 10m high support poles carrying associated antennae for a 24 metre high free standing communications structure with its associated antennae, communication dish, ground equipment and all associated site development works within an existing fenced compound. The development will continue to form part of existing 3G and 4G Broadband network
View the full application file on the council's planning portal →Application Timeline
Application received
8 Sept 2021
Decision: CONDITIONAL
3 Mar 2022
Decision due
7 Mar 2022
Grant issued
7 Apr 2022
Application Details
- Location
- Convent Hill Waterworks Coolfadda Bandon Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 8 September 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 3 March 2022
- Grant Date
- 7 April 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of 183m of 2.4m high Palisade Fencing around the East, South and North perimeter of the site and the installation of one manually operated lockable gate suited to match the perimeter fencing.
Convent Hill Reservoir Coolfadda, Bandon Co. Cork
The construction of 3 no. dwelling houses comprising of 2 no. 3-bedroom townhouses and 1 no. 2-bedroom townhouse, and a two-storey creche with ancillary bicycle and bin stores and all other ancillary site development works. The proposed dwelling houses to the west of the site will replace a creche facility previously permitted by reference 08/7515 (as extended by reference 14/4105 & 18/6460) with vehicular access to the proposed dwelling houses being provided via the existing estate entrance from Convent Hill (L-2011) to the north. The proposed creche facility to the east of the site is a change of plan from the creche previously permitted by reference 19/5749 (as amended be reference 22/4960) with vehicular access to the proposed creche being provided via a separate estate entrance permitted by reference 19/5749 (as amended by reference 22/4960), also from Convent Hill
Coolfadda Bandon Co. Cork
The construction of a single storey, rear extension to an existing dwelling house, together with minor alterations and associated siteworks. The extension would comprise 2 additional bedrooms and a kitchenette-living room, to facilitate not more that 6 residents and 2 carers within residential care dwelling house.
Craglia Convent Hill, Coolfadda Bandon Co. Cork
Alterations and extensions to dwelling
CONVENT HILL, CONVENT HILL, COOLFADDA,
Full planning permission to construct 25 no. new dwelling houses and all ancillary site development works at site known as 'Tanners Field' at lands at Coolfadda, Bandon, Co. Cork. The proposed development consists of the construction of 10 no. 3 bedroom 2-storey townhouses, 2 no. 3 bedroom 2-storey semi-detached houses and 13 no. 2 bedroom 2-storey townhouses. The proposed development is a change of plans from that previously permitted by planning reference 08/7515 (as extended by reference 14/4105 & 18/6460) and will consist of an increase of 9 no. residential units. Vehicular and pedestrian access to the proposed development will be provided via the existing estate entrance from Dunmanway Road (R586) to the south of the proposed site. The proposed access road serving the new units will connect to the permitted residential development to the east of the proposed site, known as 'The Tannery', which is accessed by permitted entrance from Convent Hill (L-2011). Provision is also made for a previously permitted pedestrian link to the exiting northern part of the estate.
Tanners Field Coolfadda Bandon Co. Cork
To construct dwellinghouse, domestic garage and associated siteworks.
Coolfadda Bandon Co. Cork
The construction of a residential development consisting of 72 no. residential units and all ancillary site development works. The proposed development provides for the construction of 48 no. dwelling houses comprising 16 no. 4 bedroom detached/semi-detached dwelling houses, 22 no. 3 bedroom semi-detached/townhouse units and 10 no. 2 bedroom townhouse units. The proposed development also provides for the construction of 6 no. 2-3 storey apartment/duplex buildings which accommodate 24 no. own door access apartment/duplex units (12 no. 1 bed and 12 no. 2 bed). The proposed development includes for the extension of the existing estate road network of Maple Drive and Maple View residential developments to the east of the site to facilitate access to southern areas of the proposed development while access to northern areas of the site will be provided via a vehicular site entrance from Convent Hill (L-2011). The proposed development also includes a separate pedestrian access from the Dunmanway Road (R586) to the south. Ancillary site development works include the provision of bicycle and bin storage facilities and the undergrounding/diversion of existing overhead lines.
Coolfadda,, Bandon,, Co. Cork.
To construct dwellinghouse, domestic garage and associated siteworks.
Coolfadda Bandon Co. Cork
Residential development of 83 no. two and three storey dwellings, construction of 2 no. entrances and associated site works to include multi-use games area, neighbourhood play areas, pumphouse, attenuation tank, new surface water outfall to Bandon River and associated site works and services and site development works for future childcare facility
Coolfadda Bandon
Residential development comprising 83 no. two- and three-storey dwellings, accessed from a permitted entrance on the Dunmanway Road and two new entrances from Convent Hill, together with associated site development works, and Outline permission for a childcare facility
Coolfadda Bandon
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?