Proposed Development
change of use from office to fitness centre/gym
View the full application file on the council's planning portal →Application Timeline
Application received
16 Jul 2021
Decision: CONDITIONAL
2 Sept 2021
Decision due
9 Sept 2021
Grant issued
6 Oct 2021
Application Details
- Location
- Arrabawn , 1st Floor Custom Gap Road/Jail Street , Tullow Newport Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.47 ha
Timeline
- Registration Date
- 16 July 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 2 September 2021
- Grant Date
- 6 October 2021
- Permission Expires
- 5 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of an extension and to carry out minor elevational modifications to existing dwelling house including all ancillary site works
Jail Street , Newport , Co. Tipperary
demolition and reconstruction of existing derelict and structurally unsafe building to provide for a 3 bedroom town house, construct 2 no. 2 bed apartments, connection to existing services, provision of rainwater retention system and associated site development works
Ivy House , The Square , Newport
demolition and reconstruction of existing derelict and structurally unsafe building to provide for a 3 bedroom town house, construct 2 no. 2 bed apartments, connection to existing services, provision of rainwater retention system and associated site development works
Ivy House , The Square , Newport
(a) the interconnection of 2 no. existing buildings to extend the existing pharmacy, associated staff facilities and storage at ground floor and basement floor levels, (b) interconnection of the 2 no. existing buildings to create 1 no. 2 bedroom apartment at first floor level, (c) associated alterations to existing buildings external alterations to accommodate proposed new internal layout and reconfiguration, (d) new shop frontage complete with illuminated building signage, (e) all associated site works. Retention Permission for the existing external illuminated pharmacy sign
Hackett's Pharmacy , The Square , Tullow Newport
the demolition of an existing dilapidated two storey house (75.9m²) and all ancillary site works for the provision of a future site entrance
Cork Road , Newport , Co. Tipperary
a change of use of a vacant ground floor commercial unit to a one bedroom residential unit measuring 45m2. This will involve (a) elevational changes, (b) internal modifications, (c) connection to public utilities, (d) associated site services and works
The Square Cork Road , Newport , Co. Tipperary
single storey extension to the rear of house
No. 8 Ard Mhuire , Newport , Co. Tipperary
a stone faced pedestrian bridge over Cully River
Pound Street , Rose Hill , Newport
a stone faced pedestrian bridge over Cully River
Pound Street , Rose Hill , Newport
1) utility/boiler room. 2) fuel store 3) domestic garage and all associated site works
13 Ard Mhuire , Newport , Co. Tipperary
Planning a project of your own?