The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

211047

UNCONDITIONAL

Galway - Galway County Council

Proposed Development

to construct the following: a 24,505sqm single storey data centre building, a 5232sqm single storey Logistics and Administration Building, a 289sqm single storey Maintenance Building, a 16sqm Security Hut and associated barriers, 2 number 48sqm Fibre Huts (max building eaves height = 10m), 18 external standby generators, all associated external plant, a 20kV Electricity Substation, contractor facilities, a main entrance including a new right turning lane, internal access roads and associated infrastructure, proprietary waste water treatment plants including percolation areas, mains water connection, fire water storage tanks; rainwater harvesting, provision of fibre optic data connections, car parking (207 spaces, including 7 visitor spaces, 50 internal staff mobility spaces and disabled parking spaces), bike parking, an amenity walkway and associated parking, site leveling for a laydown area and a 220kV substation, 2.4m high perimeter security fencing, landscaping including supplementary tree planting and all associated works. A report for screening for Appropriate Assessment and an Environmental Impact Statement (EIS) will be submitted with the planning application (gross floor space 30,138sqm)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Jun 2021

  2. Decision: UNCONDITIONAL

    5 Aug 2021

  3. Decision due

    8 Aug 2021

Application Details

Location
Palmerstown Toberroe & Derrydonnell ,
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Galway County Council
Site Area
197 ha

Timeline

Registration Date
14 June 2021
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
5 August 2021
Permission Expires
4 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

590m
201868CONDITIONAL8 Dec 2020

to construct a 4 bay slatted shed with cubicles. Gross floor space of proposed works: 476.3 sqm

Tobberoe ,

741m
2561547CONDITIONAL21 Oct 2025

for the construction of a domestic dwelling

Derrydonnell More , Athenry , Athenry

749m
2561005CONDITIONAL23 Jul 2025

for the construction of a domestic dwelling house, domestic garage, septic tank, percolation area and all associated site services. Gross floor space of proposed works: 231.63 sqm(H), 15.00 sqm(G)

Derrydonnell More , Athenry , Co Galway

827m
2561897CONDITIONAL19 Dec 2025

for development consisting of construction of new agricultural storage/machinery sheds, slatted shed and underground slurry storage tank along with all associated siteworks

Derrydonnell More , Athenry , Co. Galway

849m
181537CONDITIONAL30 Oct 2018

for extension to the side and rear of the existing dwelling house (c.126 sqm.), construction of a covered car port, revised site boundaries and all associated site works. Gross floor space of proposed works: 126 sqm

Lisheenkyle East ,

852m
2560358REFUSED3 Apr 2025

to subdivide parents site and to construct a dwelling house and a garage with treatment plant and percolation area. Gross floor space of proposed works: 139.10 sqm(H), 40.00 sqm(G)

Lisheenkyle East , Athenry , Co. Galway

947m
171538REFUSED24 Oct 2017

for a 20 megawatt solar Photovoltaic farm comprising photovoltaic panels on ground Mounted frames, 4 no. single storey inverter/transformer substations, 1 no. Single storey substation and transformer, 40 no. single storey 1 megawatt battery storage containers (in battery storage area), Internal tracks, closure of existing and provision of new operational access on to R348, fencing, CCTV/lighting and all associated ancillary development and landscaping (including berms) works. Temporary construction access from the Existing farm access road on the R348. Gross floor space of proposed works 220sqm.

Toberoe Caraunduff Caherbriskaun & Rathmorrissy ,

983m
181195CONDITIONAL23 Aug 2018

to construct agricultural storage shed for machinery and fodder storage and associated services. Gross floor space of proposed works 210sqm.

Lisheenkyle ,

983m
2560542N/A3 May 2025

for the construction of a dwelling house, domestic garage, septic tank, percolation area and all associated site services. Gross floor space of proposed works: 259 sqm(H), 21.00 sqm(G)

Derrydonnell More , Athenry , Co. Galway

1000m
2260472CONDITIONAL12 May 2022

to construct a new dwelling house, a domestic garage, and wastewater treatment system and all associated site works. Gross floor area of proposed works: 206 sqm (dwelling house) and 40.5 sqm (domestic garage)

Lisheenkyle East ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.