Monaincha , Roscrea , Co. Tipperary
CONDITIONALPlanning application 211102
Tipperary - Tipperary County Council
Proposed Development
(1) construction of new extension to existing farm building for agricultural use, complete with associated site works and (2) construction of new slatted underground effluent storage tank within existing farm building for agricultural use, complete with associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
27 Jul 2021
Decision: CONDITIONAL
16 Sept 2021
Decision due
20 Sept 2021
Grant issued
20 Oct 2021
Application Details
- Location
- Monaincha , Roscrea , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.78 ha
Timeline
- Registration Date
- 27 July 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 16 September 2021
- Grant Date
- 20 October 2021
- Permission Expires
- 19 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development in peatland consisting of an access track measuring approximately 4.00m wide and 1.20km in overall length and concrete hardstanding measuring approx 97.00m in length and 26.00m in width (approximately 2,500sqm in overall area)
Brehony's Bog , Monaincha Roscrea , Co. Tipperary
RED III - Soleire Renewables SPV Alpha 2 Ltd intend to apply for planning permission to amend the design of the previously approved development (Planning Reference: Tipperary County Council 2360677) which comprises consent for a 10-year period to construct and a 40-year period to operate a 34.11-hectare Solar PV Energy Development at Monaincha Townland, Roscrea, Co. Tipperary. The proposed amendments include: (1) removal of solar panels south of the solar farm, (2) reduction in the overall number of transformer stations, with an increase in their respective areas and foundations, (3) minor increase in array height from 2m to a maximum height of 2.52m, (4) reduction in the area of concrete shoes, (5) minor increase in the height of the deer-type fencing, (6) minor increase to a minimum row spacing of 3.6m, (7) provision of a minimum distance of 4m between the modules and the perimeter fencing, (8) reduction and reconfiguration of the internal access tracks, including relocation of the access road on the eastern side of the field to comply with the watercourse buffer area, (9) strengthening of the existing watercourse crossing, including the provision of a culvert for the interconnector cable, to facilitate operational and maintenance (O&M) access and connectivity between the northern and southern, (10) relocation of the transformer station within the northern plot and (11) relocation of the temporary construction compound. A Natura Impact Statement will also be submitted to the Planning Authority for this proposed development.
Monaincha Townland , Roscrea , County Tipperary
the installation of a 34.11hectare/84.28 acre solar farm at lands known as Brehony's Bog, within the townland of Monaincha, Roscrea, Co. Tipperary (E: 616980, N: 687790 (ITM)). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures and will measure 2.00m in overall height. Ancillary development to the installation of solar PV panels includes 12no. transformers; 106no. pole-mounted CCTV cameras measuring 2.75m high; underground cabling; 3.80km (approx.) of fenceline measuring 2.00m at highest point; creation of new graded internal access tracks approximately 4.00m wide from two existing gated entrances on northern site boundary, each measuring 6.50m wide. A temporary compound measuring 5,000sqm will be established during the construction phase of the solar farm, whereupon the area will then be used for the siting of solar PV panels following the construction phase. The proposed solar farm will operate over a 40-year period, after which it will be decommissioned, with all associated lands returned to their original use. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application
Brehony's Bog , Monaincha , Roscrea
Red III - Soleire Renewables SPV Alpha 2 Ltd intend to apply for planning permission to amend the design of the previously approved development (Planning Reference: Tipperary County Council 2360677) which comprises consent for a 10-year period to construct and a 40-year period to operate a 34.11-hectare Solar PV Energy Development at Monaincha Townland, Roscrea, Co. Tipperary. The proposed amendments include: (1) removal of solar panels south of the solar farm, (2) reduction in the overall number of transformer stations, with an increase in their respective areas and foundations, (3) minor increase in array height from 2m to a maximum height of 2.52m, (4) reduction in the area of concrete shoes, (5) minor increase in the height of the deer-type fencing, (6) minor increase to a minimum row spacing of 3.6m, (7) provision of a minimum distance of 4m between the modules and the perimeter fencing, (8) reduction and reconfiguration of the internal access tracks, including relocation of the access road on the eastern side of the field to comply with the watercourse buffer area, (9) strengthening of the existing watercourse crossing, including the provision of a culvert for the interconnector cable, to facilitate operational and maintenance (O&M) access and connectivity between the northern and southern, (10) relocation of the transformer station within the northern plot and (11) relocation of the temporary construction compound. A Natura Impact Statement will also be submitted to the Planning Authority for this proposed development
Monaincha townland , Roscrea , County Tipperary
the installation of a 34.11hectare/84.28 acre solar farm at lands known as Brehony's Bog, within the townland of Monaincha, Roscrea, Co. Tipperary (E: 616980, N: 687790 (ITM)). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures and will measure 2.00m in overall height. Ancillary development to the installation of solar PV panels includes 12no. transformers; 106no. pole-mounted CCTV cameras measuring 2.75m high; underground cabling; 3.80km (approx.) of fenceline measuring 2.00m at highest point; creation of new graded internal access tracks approximately 4.00m wide from two existing gated entrances on northern site boundary, each measuring 6.50m wide. A temporary compound measuring 5,000sqm will be established during the construction phase of the solar farm, whereupon the area will then be used for the siting of solar PV panels following the construction phase. The proposed solar farm will operate over a 40-year period, after which it will be decommissioned, with all associated lands returned to their original use. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application
Brehony's Bog , Monaincha , Roscrea Co. Tipperary
for change of use of existing domestic sheds with hard standing area to commercial use as a tyre centre and car valeting service
Derrymore , Roscrea , Co. Tipperary
the conversion of attic space to habitable rooms including bedrooms and home office with gable windows and roof lights to rear and all associated site works
The Sheehys , Roscrea , Co. Tipperary
the extension to side of existing house, permission to renovate and extend derelict cottage on site, and permission to form new entrance to site and all associated site works
The Sheehys , Roscrea , Co. Tipperary
amendment to the design of the previously approved development (Planning Reference: Tipperary County Council (16/600917) and An Bord Pleanála (Pl92.249060), which comprises consent for a Solar PV Energy Development and for planning permission for a proposed Battery Energy storage system - amendments include; (1) changes to the configuration of the Solar PV rows, (2) a reduction in the height of the solar PV panels, (3) reduction in the spacing of Solar PV rows (strings), (4) increase in size of solar panels, (5) increase in solar panel output resulting in an overall increase in solar power generation, (6) a change in solar panels tilt (degree), (7) an increase in the number of transformers/inverters, (8) an increase in the area of the individual transformers, (9) an increase in the number of panels, (10) the introduction of a Battery Energy Storage system with a compound size of 5,400 square metres containing 60 battery units and 30 inverter units, all of which measure 6.1 m in length, 2.45m in width and 2.9m in height, together with a switch room/SCADA room - A Natura Impact Statement will also be submitted with the application
Leonards Bog , The Sheehys , Derrymore Roscrea
dwellinghouse, new entrance, septic tank with standard percolation area and all associated site works
Derrymore , Roscrea , Co Tipperary