The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

211137

N/A

Tipperary - Tipperary County Council

Proposed Development

(1) Demolish existing outhouse and boiler house, (2) Construct an extension to rear of dwelling, (3) Change use of existing domestic garage to residential use to form part of overall dwelling, (4) Construct a domestic garage, and all other site works

View the full application file on the council's planning portal →

Application Details

Location
Knocknarea , Bohermore , Cashel
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
4 August 2021
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
211216CONDITIONAL17 Aug 2021

(1) Demolish existing outhouse and boiler house, (2) Construct an extension to rear of dwelling, (3) Change use of existing domestic garage to residential use to form part of overall dwelling, (4) construct a domestic garage,all with associated site works

Knocknarea , Bohermore , Cashel

20m
19600981CONDITIONAL5 Sept 2019

construction of a rear first floor extension to existing dwelling house together with all associated site works

No. 1 St. Frances Row , Cashel , Co. Tipperary

23m
19600929N/A20 Aug 2019

construct a rear first floor extension to existing dwelling house together with all associated site works

No. 1 Bohermore , Cashel , Co. Tipperary

61m
20176CONDITIONAL26 Feb 2020

construction of a new single-storey extension to the south west side of existing single storey dwelling, construction of porch to front elevation, photovoltaic solar panels, replacement of garage roof, alterations to elevations and associated site boundary and site development works

Bohermore , Cashel , Co. Tipperary

62m
19600803CONDITIONAL17 Jul 2019

1. an existing attached domestic garage, 2. An existing rear extension to the dwelling, 3. an existing detached domestic storage shed, 4. the location of the site entrance and also Planning Permission to 5. enlarge the existing site entrance, 6. to construct a domestic extension to the existing dwelling, 7. for elevation amendments and all associated site works

Bohermore , Cashel , Co. Tipperary

82m
2411CONDITIONAL24 Jan 2024

1. the extensions to the original dwelling , 2. the provision of additional windows to the original dwelling, 3. domestic storage sheds, 4. the enlargement of original pedestrian entrance to provide a vehicular access entrance and including all associated site development works

9 St Francis Row , Cashel , Co. Tipperary

137m
20655CONDITIONAL25 Jun 2020

(i) Orientation of dwelling from that previously approved under Planning Ref 00570036 (ii) Extensions to side and rear of dwelling (iii) Garage attached to rear of dwelling

Palmershill , Cashel , Co. Tipperary

137m
2460380CONDITIONAL17 May 2024

the following: a) demolish existing dwelling and b) construction of new replacement dwelling with garage and reuse existing entrance to site with all associated sitework and ancillary works and connection to existing public services

Villa Marina , Palmershill , Cashel

139m
2660006CONDITIONAL7 Jan 2026

development at protected structure consisting of works to (1) the main roof, (2) the external rear walls, (3) the front door, (4) the rear bay-window, (5) the internal non-structural remodelling of ground floor kitchen and back-kitchen areas as per the architects drawing, (6) the existing dilapidated first floor joists over garage (bedroom 2,3) to be repaired - made level where dropped and new wall plate installed to conservation appropriate detail and floor over unheated garage to be insulated between and under joists as per the architects drawings, (7) all existing internal electrical system to be carefully removed and replaced, (8) and existing internal plumbing to be removed and replaced

Bohermore , Cashel , Co. Tipperary

141m
2561321N/A17 Dec 2025

the development which will consist of: (1) Main Roof: Strip all non-original plastic gutters at eaves and replace all gutters with black colour alu-cast heritage-style half round gutters and down-pipes. Repair, or if necessary replace, existing lead flashings and cover flashings at chimneys and bay windows. Insulate at attic floor level with mineral wool insulation laid between and over the existing joists. (2) External Walls: Repair, or replace if necessary, damaged cementitious plaster. Carry out structural repairs to to any cracks or defects as detailed on Architect elevation drawings: Hack off loose, damaged or hollow areas of render and re- render to match original; clean and re-decorate. Provide all necessary lead flashings and cover flashings. (3) Front door: A conservation grade joiner/carpenter to be employed to make repairs to original single-glazed ornate fanlight over non-original front door. As secondary pane of glass to be neatly installed internally to provide adequate thermal break and draft exclusion. (4) Rear Bay-Window: Existing dilapidated PVC plastic bay window to kitchen is to be removed and disposed of. the existing 1.8m wide opening in rear wall is to be widened to 2.8m winder opening allowing for a needed dining area in kitchen at bay window. A conservation grade joiner/carpenter is to be employed to make new hardwood bay window to architect’s design. Bay-window supporting wall to be formed in English bonded red bricks set in pale cream colour lime mortar. Bay-window insulated roof dressed in Code 5 lead work by suitable skilled crafts-person. (5) New hardwood glazed back-door to replace non-original aluminium door. (6) Internal non-structural remodelling of ground floor kitchen and back-kitchen areas as per the architects drawings. (7) All existing internal electrical system to be carefully removed and replaced as per architects drawings and details. Care is to be taken to ensure no damage to important original features such as the plaster work to hallway ceiling and walls. In so far as is possible all new electrical will be housed in a secondary service zone behind new timber wainscotting. Chasing and drilling of original walls to be avoided. (8) All existing internal plumbing to be carefully removed and replaced as per architects drawings and details. Care is to be taken to ensure no damage to important original features such as the plaster work to hallway ceiling. The development will consist of work to a Protected Structu

Bohermore , Cashel , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?