Proposed Development

to demolish the existing premises and to construct a new mixed use development building with light industrial/shop use and offices with associated site works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Nov 2021

  2. Further information requested

    21 Dec 2021

  3. Further information received

    20 Jun 2022

  4. Decision due

    2 Aug 2022

  5. Decision: CONDITIONAL

    2 Aug 2022

  6. Appeal submitted

    19 Aug 2022

  7. Appeal decided: MODIFIED

    9 Apr 2024

  8. Grant issued

    18 Apr 2024

Application Details

Location
Drumbiggle Road , Ennis , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
2 November 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 August 2022
Grant Date
18 April 2024
Permission Expires
17 April 2029

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-314394-22
Decision
MODIFIED
Submitted
19 August 2022
Decided
9 April 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
20445CONDITIONAL2 Jul 2020

to RETAIN works including roof structure above garage, adjoining meeting room and additional blockwork on boundary wall

Drumbiggle Road , Ennis , Co Clare

7m
19421N/A27 May 2019

to RETAIN works including roof structure above garage, adjoining meeting room and additional blockwork on boundary wall

Drumbiggle Road , Ennis , Co. Clare

138m
248000N/A26 Jan 2024

to carry out the following development: Car Park & associated works at Waterpark Campus, Drumbiggle Road, Ennis, Co Clare 1) Provision of 70 public car parking spaces, 8 Universal Parking Spaces, 6 EV Charging Points, 53 parking spaces for the Waterpark Campus and cycling stands. Public lighting ducting, storm water system including attenuation & hydrocarbon interceptor and infrastructure for the EV Charging including ESB Substation. 2) The car parking is being provided on part of the open space area to the side and front of Waterpark House. 3) The provision of cycle stands on existing car parking spaces to the side and within the curtilage of the Buttermarket Building, is also proposed. The Buttermarket Building is a protected structure (RPS no. 837). In accordance with the Habitats Directive, an Appropriate Assessment (AA) Screening has been carried out on the project. An Environmental Impact Assessment (EIA) Screening Determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development

Drumbiggle & Clonroad Beg townlands , Waterpark House , Drumbiggle Road Ennis Co Clare V95 N1NR

173m
2660293N/A7 May 2026

to erect entrance gates at the front of his premises with all necessary ancillary services

Hermitage , Ennis , Co. Clare V95 D362

196m
21578N/A4 Jun 2021

the development will consist of demolition of existing structures at Nos 1-4 inclusive Butter Market Street, and partial removal of the existing wall to the eastern site boundary. Construction of 46 residential units in total comprising a new 4 storey apartment building to Drumbiggle Road with 30 No. 2 bedroom apartments and 3 No. 1 bedroom apartments, over semi-basement level with 20 car-parking spaces secure bicycle store, bin store and plant room; Digital Hub at ground floor level; New single storey Cafe and Digital Hub at ground floor to Simm's Lane; 4 Storey Apartment Building to Buttermaket St. Lane with 7 No. 2 Bedroom Apartments; 6 No. 3 Storey Terraced town houses to Buttermarket Street, new substation, 5 new set-down car parking spaces, external hard and soft landscaping, lighting, solar panels, underground services including drainage with attenuation tank and ancillary site works. The site is in an Architectural Conservation Area. A Natura Impact Statement will be submitted with the application

Drumbiggle Road , Nos 1-4 Buttermarket Street and Simm's Lane , Drumbiggle Ennis Co Clare

196m
21663CONDITIONAL24 Jun 2021

for development at Drumbiggle Road, Nos. 1-4 Buttermarket Street and Simm's Lane, Drumbiggle, Ennis, Co Clare. The proposed development will consist of demolition of existing structures at Nos. 1-4 inclusive Butter Market Street, and partial removal of the existing wall to the eastern boundary. Construction of 46 residential units in total comprising of a new 4 storey apartment building to Drumbiggle Road with 30 No. 2 bedroom apartments and 3 No. 1 bedroom apartments over semi-basement level with 20 car- parking spaces, secure bicycle store, bin store and plantroom; Digital Hub at ground floor level; New single store Cafe and Digital hub at ground floor to Simm's Lane; 4 Storey Apartment Building to Buttermarket St Lane with 7 No. 2 Bedroom Apartments; 6 No. 3 Storey Terraced town houses to Buttermarket Street, new substation, 5 new set-down car parking spaces, external hard and soft landscaping, lighting, solar panels underground services including drainage with attenuation tank and ancillary site works The site is in an Architectural Conservation Area. A Natura Impact Statement will be submitted with the application

Nos 1-4 Buttermarket Street and Simm's Lane , Drumbiggle , Ennis Co Clare

210m
23358CONDITIONAL21 Jun 2023

for the development of an air dome (1,872m2) for multi-use gym and sports activities. The air-dome includes a gym, indoor astroturf, spin rooms and associated facilities on the grounds of the existing Clare Leisure World. Works to include ground mounted PV installation and all associated site works. The existing facility is currently fully serviced by existing services

Showgrounds Road , Clonroad Beg , Ennis Co Clare

211m
2560276CONDITIONAL16 May 2025

for minor revisions to the building structure, associated elevations and site layout, previously permitted under Pl. Ref. P23/358. The existing facility is currently fully serviced by existing services. The proposal will include all associated site development works with connections to existing services as previously permitted under Pl. Ref. P23/358

Showgrounds Road , Clonroad Beg Ennis , Co. Clare

215m
2360240CONDITIONAL7 Jul 2023

to construct an Outdoor Classroom and all associated site works

Stone Court Community Centre Stone Court , Drumbiggle Ennis , Co. Clare

222m
18535CONDITIONAL28 Jun 2018

to demolish the front garden wall and form a driveway for vehicular parking. The works will involve replacing the existing footpath with a with a dished path and the installation of a vehicle re-charging point in the garden.

No 6 Cornmarket , Ennis , Co Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?