211170
CONDITIONALGalway - Galway County Council
Proposed Development
for construction of a new dwelling house, domestic garage, sewage treatment system, and all associated site development works. Gross floor space of proposed works is 212 sqm
View the full application file on the council's planning portal →Application Timeline
Application received
30 Jun 2021
Further information requested
23 Aug 2021
Further information received
29 Oct 2021
Decision: CONDITIONAL
24 Nov 2021
Decision due
25 Nov 2021
Grant issued
10 Jan 2022
Application Details
- Location
- Castlepark & Meheranspark ,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 0.25 ha
- Floor Area
- 152.5 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 30 June 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 24 November 2021
- Grant Date
- 10 January 2022
- Permission Expires
- 9 January 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the construction of a dwellinghouse, domestic garage, proprietary treatment system and percolation area and for all ancillary services and site works. Gross floor space of proposed works 197.50 sq.
Isertkelly South ,
for the construction of a dwellinghouse, domestic garage, proprietary treatment system and percolation area and for all ancillary services and site works. Gross floor space of proposed works: 139 sqm
Isertkelly South , Kilchreest Loughrea , Co. Galway
for change of dwelling house plans & garage plans to those previously approved under Pl. Ref no. 23/60192 & for all ancillary services & site works. Gross floor space of proposed works: 90.00 sqm(house), 50.00 sqm(garage)
Isertkelly South , Kilchreest , Loughrea
for the construction of a domestic garage
Meheranspark , Kilchreest , Co Galway
for the construction of a domestic garage
Meheranspark , Kilchreest , Co Galway
for a period of 25 years for the continued operation and expansion of an existing quarry at this site (site area 12.66 Hectares) for extraction of limestone rock. The proposed development will increase the extraction area to a total of 10.565 hectares (additional volume to be extracted = 1.33 million m³ approximately) and will include the crushing, screening/processing of rock from the site using mobile plant. The development will include the removal of all existing temporary buildings from the site and replacement with permanent structures including the following: site office 104 m², weigh bridge office 16 m², maintenance shed 483 m². Other works will include the installation of a fuel tank including refueling pad and petrol interceptor, construction of carpark/ lorry parking, installation of signage, street lighting and fencing. The site perimeter will include landscaped soil berms to screen the site. On completion of extraction the site will be restored to a natural habitat. An Environmental Impact Assessment Report (EIAR) and screening for an Appropriate Assessment has been prepared in respect of this planning application & will be submitted to the planning authority with the planning application. Gross floor space of proposed works: 603.00 sqm
Isertkelly North , Kilchreest , Loughrea Co. Galway
for construction of a dwelling house, domestic garage, sewage treatment system & percolation area, along with all ancillary works. Gross floor space of proposed works(house) 294 sqm. (garage) 51.5 sqm.
Furzypark Kilchreest ,
to construct an extension to the rear of a dwellinghouse including all associated works & services, & construct a new septic tank with percolation
Furzypark , Gort , Co. Galway
to further develop the existing quarry and all associated site works. The Proposed Development being applied for under this planning application includes for the continuance of quarrying operations within the permitted extraction area to a finished floor level of 40 metres above ordnance datum (mAOD). The Proposed Development also includes for the continuance of operation of a concrete batching plant permitted under ABP PL 07.117549 (Pl. Ref: 99/1449). The extraction will take place within the existing quarry site boundary and permitted area. The proposed development comprises: • The continued extraction of limestone rock from an area measuring approximately 31 hectares to a finished floor level of 40 mAOD • Aggregate product stockpiles • The continued operation of the on-site concrete batching plant (permitted under planning permission Pl. Ref: 99/1449 and ABP PPL07.117549) • Earthen berm construction along the extraction boundary • Phased restoration of the site • The proposed development will utilise the existing quarry infrastructure including internal roads, site office, weighbridge, wheelwash, refuelling area, welfare facilities and other ancillaries. The development will include the use of conventional drilling and blasting techniques and the use of mobile crushing and screening plant. Permission is sought for a period of 27 years. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared and will accompany the planning application
Ballinla Isertkelly North & Killeenpatrick , Kilchreest Quarry Ballinla , Co. Galway
for the erection and operation of a semi-mobile asphalt/macadam mixing plant on C.0.3 hectares at Kilchreest Quarry. Previous application 15/359.
Ballinla , Kilchreest