The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

211171

N/A

Kerry - Kerry County Council

Proposed Development

ERECT 743.00 M2 OR 150.30 KW OF PHOTOVOLTAIC PANELS ON THE ROOF OF OUR EXISTING LIDL STORE IN TRALEE WITH ALL ASSOCIATES SITE WORKS

View the full application file on the council's planning portal →

Application Details

Location
LIDL IRELAND GMBH , EDWARD STREET , CLOONALOUR
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
0.36 ha

Timeline

Registration Date
14 October 2021
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
211459N/A16 Dec 2021

ERECT 743.00M2 OR 150.30KW OF PHOTOVOLTAIC PANELS ON THE ROOF OF OUR EXISTING LIDL STORE IN TRALEE WITH ALL ASSOCIATES SITE WORK

LIDL IRELAND GMBH , EDWARD STREET , CLOONALOUR

3m
22181CONDITIONAL21 Feb 2022

ERECT 743.00 M2 OR 150.30 KW OF PHOTO VOLTANIC PANELS ON THE ROOF OF OUR EXISTING LIDL STORE WITH ALL ASSOCIATED SITE WORKS

CLOONALOUR (EDWARD STREET) , TRALEE , CO KERRY

44m
19428CONDITIONAL25 Apr 2019

THE CHANGE OF USE OF 9 NO. EXISTING APARTMENTS ON THE 5TH AND 6TH FLOOR LEVEL TO MEDICAL/OFFICE USE

CENTREPOINT , JOHN JOE SHEEHY ROAD AND EDWARD STREET , CLOONALOUR

45m
17480CONDITIONAL25 May 2017

(1) CHANGE OF USE FROM OFFICE TO DOCTORS SURGERY AT UNIT 101 (FIRST FLOOR) AND (2) ALL ASSOCIATED INTERNAL AND EXTERNAL SITE DEVELOPMENT WORKS ALL OF THE ABOVE TO TAKE PLACE

UNIT 101 , CENTRE POINT DEVELOPMENT , SLATT'S CAR PARK JOHN JOE SHEEHY ROAD AND EDWARD STREET

45m
17429CONDITIONAL10 May 2017

(1) CHANGE OF USE FROM OFFICE TO PRIMARY HEALTH CARE CENTRE AT UNIT 201 AND 202 (SECOND FLOOR), UNITS 301,302,303 AND 304 (THIRD FLOOR), UNITS 401,402,403, AND 404 (FOURTH FLOOR) (2)CONSTRUCTION OF A SINGLE STOREY COVERED STORE AT FIRST FLOOR DECK LEVEL OF CAR PARK ANCILLARY TO THE PRIMARY HEALTH CARE CENTRE (WITH RESULTING REDUCTION OF 2 NO. CAR PARKING SPACES). (3) CONSTRUCTION OF INTERNAL LINK WALKWAY AT FIRST FLOOR LEVEL BETWEEN UNITS 102 AND 103. (4) PROVISION OF SERVICE DOOR TO REAR OF UNIT 4 AT GROUND FLOOR LEVEL FROM EXISTING RETAIL UNIT TO GROUND FLOOR CAR PARK (5) PROVISION OF SERVICE DOOR TO REAR OF UNIT 3 AT GROUND FLOOR LEVEL FROM EXISTING RETAIL UNIT TO GROUND FLOOR CAR PARK (6) ALL ASSOCIATED INTERNAL AND EXTERNAL SITE DEVELOPMENT WORKS

CLOONALOUR (SLATTS CAR PARK) , JOHN JOE SHEEHY ROAD AND EDWARD STREET , TRALEE

55m
1992CONDITIONAL4 Feb 2019

(A) CHANGE USE FROM RETAIL UNITS TO A CAFE AND (B) PERMISSION FOR SIGNAGE ON EXISTING WINDOWS TO FRONT (NORTHWESTERN) AND SIDE (SOUTHWESTERN) ELEVATIONS OF CAFE

CLOONALOUR , EDWARD STREET , TRALEE

60m
2460016CONDITIONAL12 Jan 2024

to retain (A) change of use from café (i.e. unit 3) to yoga studio (B) signage on existing windows to front (northwestern) elevation of (unit 3), all at Unit 3 (ground floor) Centre Point, Edward Street, Tralee, Co. Kerry

Unit 3 (ground floor) , Centre Point Centre Point , Tralee Co.Kerry

61m
21497CONDITIONAL7 May 2021

(A) CHANGE OF USE FROM VACANT RETAIL UNIT (I.E. UNIT 3) TO PROPOSED USE AS CAFÉ ANCILLARY TO THE ADJACENT CAFÉ KNOWN AS "THE GLASSHOUSE" IN UNITS 1 AND 2 WITH NEW INTERNAL OPENING INTO ADJACENT UNIT 1 AND 2, ALL WITH TAKE-AWAY SERVICE AND (B) PLANNING PERMISSION FOR SIGNAGE ON EXISTING WINDOWS TO FRONT (NORTHWESTERN) ELEVATION OF CAFÉ (UNIT 3), ALL LOCATED

UNIT 3 (GROUND FLOOR) , CENTRE POINT , EDWARD STREET

62m
221239CONDITIONAL29 Nov 2022

CHANGE THE USE OF RETAIL UNITS ON THE GROUND FLOOR TO MEDICAL USE

CENTREPOINT , JOHN JOE SHEEHY ROAD AND EDWARD STREET , CLOONALOUR TRALEE

86m
18263REFUSED22 Mar 2018

(1) CONSTRUCT A 3 STOREY MIXED USE DEVELOPMENT (C 2,217.92M2) TO CONSIST OF A PHARMACY (C 141M2), A CAFE (C.169M2) AND 3 NO. COMMERCIAL/RETAIL UNITS (C334M2) AT GROUND FLOOR LEVEL, 3 NO. OFFICES/MEDICAL SERVICE UNITS (C 661M2) AT FIRST FLOOR LEVEL AND 3 NO OFFICES/MEDICAL UNITS (573M2) AT SECOND FLOOR LEVEL (2)ALL ANCILLARY SITE WORKS AND LANDSCAPING NECESSARY TO COMPLETE THE DEVELOPMENT

CLOONALOUR , TRALEE , CO KERRY

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?