211173

CONDITIONAL

Kerry - Kerry County Council

Proposed Development

(A) RETAIN AS CONSTRUCED DOMESTIC GARAGE (B) RETAIN ALL BUILDINGS WITHIN REVISED BOUNDARIES AND (C) FULL PERMISSION TO CONSTRUCT AN EXTENSION TO EXISTING DWELLING HOUSE

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Oct 2021

  2. Further information requested

    25 Nov 2021

  3. Further information received

    13 Dec 2021

  4. Decision due

    28 Jan 2022

  5. Decision: CONDITIONAL

    28 Jan 2022

  6. Grant issued

    3 Mar 2022

Application Details

Location
COMMONS OF MILLTOWN , DINGLE , CO KERRY
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kerry County Council
Site Area
0.11 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
15 October 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 January 2022
Grant Date
3 March 2022
Permission Expires
2 March 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

39m
23916CONDITIONAL15 Aug 2023

TO (1) RETAIN 5 NO. AS CONSTRUCTED DETATCHED DWELLING HOUSES ON SITE NOS. 1, 2, 5, 6, AND 7 AND 4 NO. AS CONSTRUCTED SEMI-DETATCHED DWELLING HOUSES ON SITE NOS. 3, 4, 8 AND 9 (2) RETAIN GARDEN SHEDS TO SITE NOS. 4, 8 AND 9 (3) RETAIN AND COMPLETE EXISTING FOOTPATHS AND SERVICE ROAD SERVING THE HOUSING ESTATE AND ALL ASSOCIATED ANCILLARY SITE WORKS/SERVICES AND (4) RETAIN ALL BUILDINGS, GREEN AREAS, SERVICE ROAD, FOOTPATHS AND ALL ASSOCIATED ANCILLARY WORKS/SERVICES WITHIN REVISED SITE BOUNDARIES (B) FULL PERMISSION TO CONSTRUCT GARDEN SHEDS TO THE REAR OF DWELLING HOUSE ON SITE NOS. 1,2,3,5,6 AND 7

AN SEAN MHUILEANN , THE COMMONS OF MILLTOWN , DINGLE

64m
2360105N/A21 Aug 2023

Outline planning permission to construct a dwelling house with all associated ancillary works/services and access via existing service road

An Sean Mhuileann , The Commons of Milltown , Dingle

108m
22890CONDITIONAL24 Aug 2022

CHUN 400M2 (50.6WP) DE PHAINEIL GREINE A CHUR IN AIRDE AT FHRAMAI MIONTAL AR AN DTALAMH AGUS NA HOIBREACHA A BHAINEANN LEO . (CONSTRUCT 400M2 (50.6KWP) OF GROUND SOLAR PANELS ON METAL FRAMES AND ALL ASSOCIATED WORKS)

BAILE AN MHUILINN , DAINGEAN UI CHUIS , CO CHIARRAI V92TX48

204m
20151CONDITIONAL18 Feb 2020

RETAIN (1) AS CONSTRUCTED DWELLING HOUSE AND GARAGE WITH PUBLIC SEWER CONNECTION AND (2) ALL BUILDINGS WITHIN REVISED SITE BOUNDARIES

COMMONS OF MILLTOWN AND FARRANREDMOND , DINGLE , CO KERRY

238m
2379CONDITIONAL30 Jan 2023

RETAIN AN EXISTING GUESTHOUSE WITHIN REVISED SITE BOUNDARIES AND PERMISSION TO CHANGE THE USE OF AREAS WITHIN THE GUESTHOUSE ON SITE FROM PRIVATE DOMESTIC USE TO A BUILDING OF COMMERCIAL USE IN ITS ENTIRETY AND (B) CONSTRUCT A STOREY AND A HALF DWELLING HOUSE WHICH WILL BE CONNECTED TO PUBLIC SERVICES AND INCLUDE ALL ASSOCIATED SITE WORKS

FARRANREDMOND , DINGLE , CO KERRY

265m
23496CONDITIONAL5 May 2023

RETAIN AS CONSTRUCTED DWELLING HOUSE AND SHED SERVED BY A SEPTIC TANK AND PERCOLATION AREA WITH ALL ASSOCIATED ANCILLARY SERVICES/SITE WORKS, AND (B) FULL PERMISSION TO DECOMMISSION THE EXISTING SEPTIC TANK SYSTEM AND INSTALL A NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED ANCILLARY SERVICES/SITE WORKS

BALLYNABOOLY , DINGLE , CO KERRY

345m
2560068CONDITIONAL10 Feb 2025

(1) Retain installed first floor area in Distillery Production Building 183m2 consisting of: staff kitchen 12.7m2, shop with tasting bar 26.9m2; visitor area 143.4m2 (2) Visitor Centre use on site and Planning Permission for (1) Partial demolition of single storey projecting elements on south side (103 sq.m.) (2) Upgrade / replacement of external cladding (including reconfiguration of openings) (3) Internal layout modifications (4) Additional 323 sq.m. at upper level (including visitor use) (5) Change of use of 59 sq.m. of lower level production area to retail (6) Change of use of 12m2 of lower level production area to open office area (7) Change of use from permitted storage (Upper Shed) 412m2 to proposed industrial use (Distilling and ancillary storage) (8) New retail area at lower level 142m2 (9) Two new (8.8m high) freestanding steel grain storage silos to front (10) Connection of sewage system to mains (to replace septic tanks) (11) Landscaping (12) Bicycle, car and bus parking provision on site and all associated site ancillary works

The Dingle Distillery Old Mill , Milltown Co. Kerry V92 E7YD , (also drainage connection at Ballyhea Road Commons of Milltown Dingle Co. Kerry)

360m
21424CONDITIONAL19 Apr 2021

RETENTION PERMISSION TO RETAIN EXISTING DISTILLERY AND EXISTING DORMER HOUSE (TO REMAIN IN RESIDENTIAL USE) WITHIN REVISED SITE BOUNDARIES (TO OVERALL 0.6317 hA (NET) AND PERMISION TO REDEVELOP THE EXISTING DINGLE DISTILLERY, INCLUDING: DEMOLITION OF PART OF THE EXISTING DISTILLERY BUILDING (135 SQM), CONSTRUCTION OF 1,762 SQM TOTAL ADDITIONAL FLOOR AREA, CONSISTING OF: A NEW CIRCULAR, THREE STOREY LIFT AND STAIR TOWER, WITH RECEPTION, TO THE FRONT OF THE BUILDING, NEW EXTENSIONS TO THE BUILDING AT GROUND AND FIRST FLOOR LEVEL AND A NEW FIRST FLOOR AREA WITHIN THE EXISTING BUILDING, TO ACCOMMODATE: NEW FIRST FLOOR VISITOR CENTRE WITH BAR AND VIEWING BALCONY, NEW AND EXTENDED FIRST FLOOR AND GROUND FLOOR PRODUCTION, STORAGE AND PLANT AREAS, NEW GROUND FLOOR RETAIL AREA INCLUDING CHANGE OF USE OF PART OF EXISTING GROUND FLOOR AREA TO RETAIL USE, ANCILLARY OFFICE AND SANITARY FACILITIES, UPGRADING THE EXISTING BUILDING TO INCLUDE REVISED ARCHITECTURAL TREATMENT, INCLUDING ELEVATIONS, EXTERNAL FINISHES CONSISTING OF NEW GLAZING, EXTERAL CLADDING (SLATE AND NATURAL STONE) AND NEW METAL SHEET ROOF INCORPORATING NEW ROOF LIGHTS, NEW EXTERNAL SIGNAGE, REVISED ACCESS INCLUDING ADDITIONAL SERVICE ENTRANCE, EXPANDED CAR PARKING, BUS SET DOWN FACILITY AND CYCLE PARKING, RELOCATED GAS TANKS TO BE UNDER GROUND, REPOSITIONED FRONT BOUNDARY WITH NEW BOUNDARY TREATMENT, PERMISSION FOR NEW DRAINAGE INCLUDING (A) DECOMMISSIONING OF TWO SEPTIC TANKS (B) CONSTRUCTION OF NEW SURFACE WATER SYSTEM, WITH ATTENUATION AND (C)CONSTRUCTION OF NEW FOUL SEWER RISING MAIN FROM DISTILLERY TO CROSS UNDER THE MILLTOWN RIVER TO CONNECT TO PUBLIC SEWERAGE NETWORK AT BALLYHEA ROAD, COMMOMS OF MILLTOWN, DINGLE AND ALL ANCILLARY DEVELOPMENT WORKS INCLUDING LANDSCAPING, BOUNDARY TREATMENT, SERVICES LIGHTING AND ALERATIONS TO GROUND LEVELS NEAR WESTERN BOUNDARY

THE DINGLE DISTILLERY , OLD MILL MILLTOWN , DINGLE

373m
20699CONDITIONAL5 Aug 2020

1. CONSTRUCT FIVE NO, TWO BEDROOM DWELLING HOUSES, TWENTY TWO NO. THREE BEDROOM DWELLING HOUSES, FOUR NO. FOUR BEDROOM DWELLING HOUSES, TWO NO. TWO BEDROOM APARTMENTS AND TEN NO. ONE BEDROOM APARTMENTS TO BE COMPRISED OF ONE TWO STOREY TERRACE CONTAINING SEVEN DWELLINGS, TWENTY- FOUR TWO STOREY SEMI- DETACHED DWELLINGS AND THREE TWO STOREY APARTMENT BUILDINGS. 2. ASSOCIATED SITE DEVELOPMENT AND SERVICE WORKS INCLUDING SITE ENTRANCE WORKS, PEDESTRIAN ACCESS WORKS, SERVICE ROADWAYS, FOOTPATHS, PARKING AREAS, LIGHTING, LANDSCAPING, ANCILLARY WORKS AND CONNECTION TO PUBLIC SEWER

THE WOOD , DINGLE , CO KERRY

377m
20222CONDITIONAL9 Mar 2020

CONSRUCT 2 NUMBER SPILT LEVEL BUILDINGS CONSISTING OF 4 NUMBER APARTMENTS IN EACH, CAR PARKING, EXTERNAL SERVICE AMENITY AREAS ALL TO SERVE THE AFOREMENTIONED, THE UNITS TO BE CONNECTED TO PUBLIC SERVICES AND ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS