The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

211193

CONDITIONAL

Clare - Clare County Council

Proposed Development

of the revision of the site boundaries around the one dwelling house constructed as per condition No. 3 of P98/1028 along with all associated ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Nov 2021

  2. Further information requested

    21 Dec 2021

  3. Further information received

    7 Jan 2022

  4. Decision: CONDITIONAL

    20 Jan 2022

  5. Decision due

    3 Feb 2022

  6. Grant issued

    22 Feb 2022

Application Details

Location
Dough , Kilkee , Co Clare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Clare County Council
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
10 November 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 January 2022
Grant Date
22 February 2022
Permission Expires
21 February 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2232CONDITIONAL20 Jan 2022

for construction of shed within the curtilage of the existing site of the dwelling house along with all associated ancillary works

Dough , Kilkee , Co Clare

147m
2460070CONDITIONAL22 Feb 2024

to construct a standalone garden room to rear of the existing dwelling house along with all associated site works and services

Brick Road , Dough , Kilkee

376m
25128CONDITIONAL24 Apr 2025

to (1) part demolish, renovate and extend existing dwelling house to include raised roof ridge height with first floor accommodation plus elevational changes, (2) upgrade and relocate foul sewer treatment system, (3) construct new vehicular entrance to former railway line level crossing gate, (4) part adjust existing ground levels plus all ancillary site works

Lisdeen , Kilkee , Co. Clare

546m
17649UNCONDITIONAL23 Aug 2017

to Extend the Appropriate Period of Planning permission P12-591 for the construction of a garage, including all ancillary site works

Dough , Kilkee , Co. Clare

625m
22288CONDITIONAL31 Mar 2022

to construct agricultural storage shed, entrance and all ancillary site works

Dough , Kilkee , Co Clare

732m
2560417CONDITIONAL4 Jul 2025

of 1) alterations/refurbishment and extension of original outhouse/shed structure for use as new games room/den and wet room. 2) replacement of flat roof on separate garage to sheeted metal pitched roof. 3) change to elevational details and all associated site works

Lisdeen , Kilkee , Co.Clare

801m
21257CONDITIONAL24 Mar 2021

for design changes to the house design permitted under Plan Ref: P11/479 (as extended by P16/521) to land at Tarmon West, Kilkee, Co Clare. Changes include but not limited to revised floor plans, elevations and fenestration, additional home office space 23m2 to North West side, additional basement area 14m2 and access driveway now arriving to fist floor and all site services and landscaping works

Tarmon West , Kilkee , Co Clare

807m
22311CONDITIONAL7 Apr 2022

for the development which will consist of a dwelling house and proprietary wastewater treatment system & percolation area together with ancillary site works

Dough , Kilkee , Co Clare

820m
19469CONDITIONAL13 Jun 2019

to RETAIN 2 No. effluent holding tanks/pumped chambers, plus increased service areas to 2 No. existing dwellings and as a variation from original granted permission P05-1363, and for permission to connect same 2 No. holding tanks to existing pumped sewer main plus all ancillary site works

Dough , Kilkee , Co. Clare

939m
17874CONDITIONAL16 Nov 2017

to RETAIN mobile home to rear of existing Garage/Filling station for use as a temporary managers/security accommodation with connection to existing services, plus all ancillary site works

Dough , Kilrush Road , Kilkee

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?