21119

CONDITIONAL

Galway - Galway County Council

Proposed Development

to construct a new shed for storage of pitch maintenance equipment and associated site works at the rugby club grounds. Gross floor space of proposed works: 96 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Feb 2021

  2. Decision: CONDITIONAL

    29 Mar 2021

  3. Decision due

    1 Apr 2021

  4. Grant issued

    17 May 2021

Application Details

Location
Graigueawoneen ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
3.23 ha

Timeline

Registration Date
5 February 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 March 2021
Grant Date
17 May 2021
Permission Expires
16 May 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

698m
25200CONDITIONAL5 Aug 2025

to construct a fully serviced private dwelling house with waste water treatment system and private garage/store to include all associated site works

Mackney (Kelly) , Ballinasloe , Co. Galway

721m
181802CONDITIONAL14 Dec 2018

to construct a slatted shed and manure pit to include concrete apron and all associated works and to widen existing entrance. Gross floor space of proposed works: slatted shed - 255.50 sqm, un-roofed passage - 28.80 sqm, concrete apron - 322.01 sqm, manure pit - 194.13 sqm

Mackney (Kelly) ,

797m
2561691REFUSED18 Nov 2025

for the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The development is a renewable energy development which is covered by the provisions of the Renewable Energy Directive III. The development will consist of the following: Demolition and site clearance works including the removal of an existing shed and adjacent hard standing areas and tank structure, located centrally on the site. Construction of 2 no. primary digesters, a pump house, and 2 no. post digester tanks, located in the northwestern section of the site. Construction of 2 no. prepits, a pasteurisation buffer tank, and a pasteurisation unit, located to south of the primary digesters, within the western section of the site. Construction of a digestate storage tank located centrally on site, to the southeast of the primary and post digester tanks. Construction of a digestate treatment building and a feedstock reception building with an odour abatement system, located in the southwestern section of site. Construction of combined heat and power (CHP) unit, a biogas boiler, a backup boiler, and a gas treatment system, located in the southeast section of the site. Construction of a CO2 liquefactor and an emergency/ safety flare a grid injection unit, a fuel storage tank and a propane tank compound accommodating 2 no. propane tanks, located in the southern section of the site. Construction of roofed silage clamps located centrally on site. Construction of a two storey office building and an ESB substation within the eastern section of the site, adjacent to the site entrance. Alterations to the adjacent local road frontage including improved access arrangements and boundary setback to allow for improved access and safety. Associated and ancillary works including parking (8 no. standard, 3 no. EV and 1 no. accessible parking spaces and bike storage for 12 no. bikes), a weighbridge, solar PV arrays at roof level, wastewater treatment equipment, bunding and surface treatments, attenuation pond, boundary treatments, lighting, services, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted with this planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. This development is covered by the provis

Glenloughaun , Ballinasloe , Co. Galway

1.2km
19888CONDITIONAL12 Jun 2019

to construct a serviced dwellinghouse including ancillary site services. Gross floor space of proposed works: 250 sqm (Est)

Moher ,

1.2km
2360576N/A30 May 2023

to construct a dwellinghouse, garage, wastewater treatment system & associated site works

Moher , Ballinasloe , Co. Galway.

1.2km
22547REFUSED22 Apr 2022

to construct the following: single storey dwelling house, external building to include garage, storage area, exercise room, wastewater treatment system and associated services. Gross floor space of proposed works house 346.86 sqm and garage 45.56 sqm

Moher ,

1.2km
2360140CONDITIONAL17 Feb 2023

to construct a single storey dwellinghouse, detached domestic garage, waste water treatment system and associated services.Gross floor space of proposed works 337.24sqm

Moher , Ballinasloe. , Co. Galway.

1.3km
2498CONDITIONAL11 Apr 2024

to enlarge the site, amend the boundaries and add staff car parking and a play space

Moher , St. Teresas Childrens Respite Unit , 25 Moher Ballinalsoe

1.4km
247CONDITIONAL15 Jan 2024

to construct 3 bay slatted shed with creep together with associated site works. Gross floor space of proposed works: 175.40 sqm

Moher , Ballinasloe , Co. Galway

1.5km
22389CONDITIONAL23 Mar 2022

to complete dwelling house and garage along with site works to include proprietary treatment system and percolation area and all ancillary site development works originally granted under pd 06/2669. Gross floor space of work to be retained: 218 sqm + 35 sqm. Gross floor space of proposed works: 35 sqm

Kellysgrove ,