21119

N/A

Westmeath - Westmeath County Council

Proposed Development

The development will consist of land improvement works using soil and stone to a maximum depth of 1.3m, final landscaping and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Mar 2021

  2. Further information requested

    5 May 2021

  3. Application withdrawn

    4 Nov 2021

Application Details

Location
Lynn , Mullingar , Co Westmeath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Westmeath County Council

Timeline

Registration Date
11 March 2021
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
4 November 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

412m
186284CONDITIONAL17 Sept 2018

retention of existing garage (30sqm) as constructed.

Lynn , Mullingar , Co.Westmeath

459m
22438CONDITIONAL1 Sept 2022

retention of the following 1) 42m2 single storey extension of the living space at the southwest of the dwelling. 2) 20m2 single storey extension of the kitchen & utility at the northwest of the dwelling. 3) 26m2 of Solar/PV panels erected on the roof of the dwelling. 4) Outbuildings at follows: a) 13.5m2 detached greenhouse, b) 11m2 detached metal shed, c) 28m2 detached metal shed, d) 7.2m2 shed and 12m2 covered carport attached to the northwest of the dwelling. 5) All associated works. The development site is adjacent to a Recorded Monument WM026-007 (ringfort-rath)

Lynn , Mullingar , Co.Westmeath

580m
2560338CONDITIONAL7 Jul 2025

permission for: a) demolition of existing dwelling and construction of a new single storey replacement dwelling; b) new garage; c) new external garden room; d) decommissioning of existing septic tank and installation of a new wastewater treatment system with tertiary treatment, e) carry out all associated site works

Lynn , Mullingar , Co. Westmeath

596m
2560213CONDITIONAL6 May 2025

to construct a single storey dwelling with converted attic, detached domestic garage & store & install a wastewater treatment system and percolation area and all associated site development works

Lynn Rd , Mullingar , Co. Westmeath

596m
2560185N/A16 Apr 2025

to construct a single storey dwelling with converted attic, detached domestic garage & store & install a wastewater treatment system and percolation area and all associated site development works.

Lynn Rd , Mullingar , Co. Westmeath

649m
186234CONDITIONAL9 Aug 2018

the construction of a two storey dwelling house, propriety effluent treatment system and percolation area, domestic garage, storage shed, new vehicular site entrance, upgrade of existing boundary wall/fence, relocation of existing signage located at the front of the proposed site with all associated site works

Lynn Road , Mullingar , Co Westmeath

696m
2360304CONDITIONAL14 Sept 2023

development which will consist of a new two storey dwelling house with detached garage/storage area, sewerage treatment system and soil polishing filter, a new site entrance, revision to site boundaries with landscaping and all ancillary site works/services

Lynn , Mullingar , Co.Westmeath

762m
2460017CONDITIONAL25 Jan 2024

development which will consist of construction of a new dwelling, garage, waste water treatment system & percolation area and all associated site works

Ardtearmann Lynn , Mullingar , Co.Westmeath

826m
186182CONDITIONAL5 Jun 2018

to construct a new dwelling, garage, wastewater treatment system and associated polishing filter and all associated site works

Lynn , Mullingar , Co Westmeath

826m
206035CONDITIONAL28 Feb 2020

Land Improvement using soil and stone to a maximum depth of 1.3m, final landscaping and all associated site works.

Lynn , Mullingar , County Westmeath.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?