211231

CONDITIONAL

Waterford - Waterford City and County Council

Proposed Development

construct a two-storey dwelling and garage, entrance and driveway, wastewater treatment plant and percolation area, with a bore hole, landscaping and all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Dec 2021

  2. Decision: CONDITIONAL

    24 Feb 2022

  3. Decision due

    25 Feb 2022

  4. Grant issued

    14 Apr 2022

Application Details

Location
Ballymullala East , Cappagh , Dungarvan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
23 December 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
24 February 2022
Grant Date
14 April 2022
Permission Expires
13 April 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

243m
2360468CONDITIONAL5 Oct 2023

two Storey Dwelling House, entrance, septic tank, percolation area and all ancillary site works at Ballymulalla East, Cappagh, Co. Waterford

Ballymulalla East , Cappagh , Co. Waterford

323m
2560285CONDITIONAL1 May 2025

Two storey dwelling house, garage, entrance, septic tank and percolation area and all ancillary site works.

Ballymulalla East , Cappagh , Co. Waterford.

717m
18617CONDITIONAL11 Sept 2018

Retention of 1 no. Silage Pit, Demolition of 4 no. existing silage pits, Demolition of a section of existing milking parlour, Construction of 3 no. Silage Pits, Construction of modifications to existing farmyard entrance, Construction of a milking parlour, ancillary rooms, livestock waiting yard, handling facilities and underground slatted tank. Erection of meal bin and water storage tank and all associated site works

Ballymulalla West , Dungarvan , Co. Waterford

942m
203CONDITIONAL3 Jan 2020

to construct a slatted slurry tank in existing shed and all ancillary site works

Ballymulalla West , Cappagh , Co. Waterford

1.1km
2360539N/A9 Nov 2023

Single storey dwelling, effluent treatment system & percolation area, vehicular entrance & all associated siteworks

Barranastook Lower , Cappagh Dungarvan , Waterford

1.1km
2360544CONDITIONAL13 Nov 2023

Single storey dwelling, effluent treatment system & percolation area, vehicular entrance & all associated siteworks

Barranastook Lower , Cappagh Dungarvan , Waterford

1.2km
19347N/A22 May 2019

development of Knocknamona Windfarm Grid Connection (KWF Grid Connection) development which comprises; a)1940m of underground medium voltage electrical cabling(up to 33kV), in Keereen Upper & Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) & Woodhouse 110kV Substation(operational). b) Works within the existing Woodhouse 110kV Substation compound in Keereen Upper, comprising a new control building 5.3m x 3.6m & 4.6m high; main 110kV transformer c6m in height, with associated plinth and bund; a 110kV transformer bay; 2no. lightening masts 17.5m in height & ancillary electrical equipment. Works will also include a new access track 17m long & 4.5m in width; additional palisade gateway 4.9m wide & 2.6m in height with palisade fencing within the compound & 2 no. gateways in the existing perimeter fence. The fencing & gateways will be same height & width as the existing fence & gates; c) A Link Road, 190m in length & 4.5m in width connecting the existing forestry road network at Knocknamona Windfarm to the existing Woodhouse Windfarm roads. It is proposed to use this link road & the existing Woodhouse Windfarm roads to facilitate the delivery of the main components to Knocknamona Windfarm. d) The widening of 960m of existing forestry road by 1m, in Knocknamona townland to facilitate the delivery of the main components to Knocknamona Windfarm &; e) Ancillary site works. An Environmental Impact Assessment Report & Appropriate Assessment Report (Stage 1 Screening) have been prepared in respect of this application.

Keereen Upper/Woodhouse or Tinakilly/Knocknamona Townlands , Dungarvan , Co. Waterford

1.2km
19369CONDITIONAL31 May 2019

development of Knocknamona Windfarm Grid Connection (KWF Grid Connection) development which comprises; a)1940m of underground medium voltage electrical cabling(up to 33kV), in Keereen Upper & Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) & Woodhouse 110kV Substation(operational). b) Works within the existing Woodhouse 110kV Substation compound in Keereen Upper, comprising a new control building 5.3m x 3.6m & 4.6m high; main 110kV transformer c6m in height, with associated plinth and bund; a 110kV transformer bay; 2no. lightening masts 17.5m in height & ancillary electrical equipment. Works will also include a new access track 17m long & 4.5m in width; additional palisade gateway 4.9m wide & 2.6m in height with palisade fencing within the compound & 2 no. gateways in the existing perimeter fence. The fencing & gateways will be same height & width as the existing fence & gates; c) A Link Road, 190m in length & 4.5m in width connecting the existing forestry road network at Knocknamona Windfarm to the existing Woodhouse Windfarm roads. It is proposed to use this link road & the existing Woodhouse Windfarm roads to facilitate the delivery of the main components to Knocknamona Windfarm. d) The widening of 960m of existing forestry road by 1m, in Knocknamona townland to facilitate the delivery of the main components to Knocknamona Windfarm &; e) Ancillary site works. An Environmental Impact Assessment Report & Appropriate Assessment Report (Stage 1 Screening) have been prepared in respect of this application.

Keereen Upper/Woodhouse or , Tinakilly/Knocknamona Townlands , Dungarvan

1.2km
2360416CONDITIONAL8 Sept 2023

for development comprising of : a) 1940m of underground electrical cabling in Keereen Upper and Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) to the Woodhouse Substation (operational). b) Works within the existing Woodhouse Substation compound in Keereen Upper, comprising a new control building 5.3m X 3.8m and 4.6m high; a 110kV electrical transformer c.6m in height, with associated plinth and bund; an electrical transformer bay; 2 No. lightening masts 17.5m in height and ancillary electrical equipment. Works within the Woodhouse Substation compound will also include a new access track 17m long and 4.5m in width; additional palisade gateway 4.9m wide and 2.6m in height with palisade fencing within the compound and 2 No. gateways in the existing perimeter fence. c) A Link Road, 190m in length and 4.5m in width connecting the existing forestry road network at Knocknamona Windfarm to the existing Woodhouse Windfarm access roads. It is proposed to use this Link Road and the existing Woodhouse Windfarm access roads to facilitate the delivery of turbine components to Knocknamona Windfarm. d) The widening of 960m of existing forestry road by 1m, in Knocknamona townland to facilitate the delivery of turbine components to Knocknamona Windfarm and;e) all ancillary site works.

Keereen Upper Woodhouse or Tinakilly and Knocknamona , Dungarvan , County Waterford

1.2km
2660403N/A9 Jun 2026

The construction of a single storey dwelling, detached garage, septic tank & percolation area, vehicular entrance & all associated site works

Barranastook Lower , Cappagh Dungarvan , Co. Waterford

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?