211247
CONDITIONALTipperary - Tipperary County Council
Proposed Development
a change to the shopfront and all associated works
View the full application file on the council's planning portal →Application Timeline
Application received
23 Aug 2021
Decision: CONDITIONAL
14 Oct 2021
Decision due
17 Oct 2021
Grant issued
17 Nov 2021
Application Details
- Location
- Ladyswell Street , Cashel , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 23 August 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 October 2021
- Grant Date
- 17 November 2021
- Permission Expires
- 16 November 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1st floor storage area to retail shop
Ladyswell Street , Cashel , Co. Tipperary
to extend the existing commercial premises via a change-of-use from residential to hair salon, permission for retention of a single-storey steel sheeted rear extension (with facilities) to existing salon and alterations to the front facade including associated signage, lighting and fenestration and all associated works
Ladyswell Street , Cashel , Co Tipperary
the development which will consist of: (1) Main Roof: Strip all non-original plastic gutters at eaves and replace all gutters with black colour alu-cast heritage-style half round gutters and down-pipes. Repair, or if necessary replace, existing lead flashings and cover flashings at chimneys and bay windows. Insulate at attic floor level with mineral wool insulation laid between and over the existing joists. (2) External Walls: Repair, or replace if necessary, damaged cementitious plaster. Carry out structural repairs to to any cracks or defects as detailed on Architect elevation drawings: Hack off loose, damaged or hollow areas of render and re- render to match original; clean and re-decorate. Provide all necessary lead flashings and cover flashings. (3) Front door: A conservation grade joiner/carpenter to be employed to make repairs to original single-glazed ornate fanlight over non-original front door. As secondary pane of glass to be neatly installed internally to provide adequate thermal break and draft exclusion. (4) Rear Bay-Window: Existing dilapidated PVC plastic bay window to kitchen is to be removed and disposed of. the existing 1.8m wide opening in rear wall is to be widened to 2.8m winder opening allowing for a needed dining area in kitchen at bay window. A conservation grade joiner/carpenter is to be employed to make new hardwood bay window to architect’s design. Bay-window supporting wall to be formed in English bonded red bricks set in pale cream colour lime mortar. Bay-window insulated roof dressed in Code 5 lead work by suitable skilled crafts-person. (5) New hardwood glazed back-door to replace non-original aluminium door. (6) Internal non-structural remodelling of ground floor kitchen and back-kitchen areas as per the architects drawings. (7) All existing internal electrical system to be carefully removed and replaced as per architects drawings and details. Care is to be taken to ensure no damage to important original features such as the plaster work to hallway ceiling and walls. In so far as is possible all new electrical will be housed in a secondary service zone behind new timber wainscotting. Chasing and drilling of original walls to be avoided. (8) All existing internal plumbing to be carefully removed and replaced as per architects drawings and details. Care is to be taken to ensure no damage to important original features such as the plaster work to hallway ceiling. The development will consist of work to a Protected Structu
Bohermore , Cashel , Co. Tipperary
change-of-use of ground floor from commercial to residential, associated reconfiguration/refurbishment of the internal layout of this floor and residential floors above, changes to the front elevation, an extension to the rear facade, and associated elevation changes, and all associated works
O'Carroll , Ladyswell Street , Cashel
development at protected structure consisting of works to (1) the main roof, (2) the external rear walls, (3) the front door, (4) the rear bay-window, (5) the internal non-structural remodelling of ground floor kitchen and back-kitchen areas as per the architects drawing, (6) the existing dilapidated first floor joists over garage (bedroom 2,3) to be repaired - made level where dropped and new wall plate installed to conservation appropriate detail and floor over unheated garage to be insulated between and under joists as per the architects drawings, (7) all existing internal electrical system to be carefully removed and replaced, (8) and existing internal plumbing to be removed and replaced
Bohermore , Cashel , Co. Tipperary
conversion of existing building into 3 apartments and construction of new 3 storey structure to rear of building to comprise an additional 3 apartments and stairwell, renovation of existing stone building to rear to accomodate bin storage and bicycle parking, connection to necessary services together with all associated site and incidental works
O'Carroll Building , Ladyswell Street , Cashel
conversion of existing building into 3 apartments and construction of new 3 storey structure to rear of building to comprise an additional 3 apartments and stairwell, renovation of existing stone building to rear to accomodate bin storage and bicycle parking, connection to necessary services together with all associated site and incidental works
O'Carroll Building , Ladyswell Street , Cashel Co. Tipperary
a change of use of part of the first floor of the property, from private residential to an Airbnb including all associated site development works
1 Canopy Street , Cashel , Co. Tipperary
1. the extensions to the original dwelling , 2. the provision of additional windows to the original dwelling, 3. domestic storage sheds, 4. the enlargement of original pedestrian entrance to provide a vehicular access entrance and including all associated site development works
9 St Francis Row , Cashel , Co. Tipperary
the construction of 4 no. dwelling houses with on-street parking and ancillary works
Colliers Lane Moor , Cashel , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?