The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

211296

CONDITIONAL

Clare - Clare County Council

Proposed Development

to construct a new dwelling house, septic tank with percolation area and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Dec 2021

  2. Decision due

    8 Feb 2022

  3. Decision: CONDITIONAL

    8 Feb 2022

  4. Grant issued

    11 Mar 2022

Application Details

Location
Crussagh , Newmarket-on-Fergus , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
297 sq m
Residential Units
1

Timeline

Registration Date
6 December 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 February 2022
Grant Date
11 March 2022
Permission Expires
10 March 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
211171N/A8 Nov 2021

to construct a new dwelling house, septic tank with percolation area and all associated site works

Crussagh , Newmarket on Fergus , Co Clare

351m
19589REFUSED18 Jul 2019

for development which will consist of a dwelling house with proprietary waste treatment system and sand polishing filter together with ancillary site works

Crossagh , Newmarket-on-Fergus , Co. Clare

405m
2560355CONDITIONAL15 Jun 2025

to construct a granny flat to the rear of the existing dwelling along with any other ancillary works

Mogullaan , Newmarket-on-Fergus , Co. Clare V95 W271

431m
2460124CONDITIONAL21 Mar 2024

for the construction of an extension to rear of existing dwelling to include Kitchen/ Dining/ Living, Utility room, Hallway and 2 no En-suite Bedrooms, including renovation, internal alterations and elevational changes to Existing Dwelling. Permission is also sought for installation of a Waste Treatment Plant, Improvement of existing vehicular entrance & for the demolition of existing out-buildings, including all ancillary site works

Rathlaheen South , Newmarket on Fergus , Co. Clare

457m
21587CONDITIONAL8 Jun 2021

for the following, 1. Elevation changes which are at variance with that granted under Condition 3 of Planning Permission P06-2780 2. The installation of 3 no roof windows on the north east elevation 3. Minor changes to internal layout 4. Minor change to on site dwelling and garage position

Rathlaheen South , Newmarket-on-Fergus , Co Clare

477m
2660288CONDITIONAL5 May 2026

to construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works

Ballycar , Newmarket on Fergus , County Clare

538m
2560551CONDITIONAL5 Sept 2025

for the change of use of existing detached garage to granny flat with disabled access including alterations to existing building, connection to existing services & all ancillary site works

Mogullaan , Newmarket on Fergus , Co. Clare

564m
24435N/A23 Dec 2024

for the development at this site at the townlands of Ballycar, lislea, Kilulla, Mogullaan and Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare The development will consist of an application for a 10-year development phase followed by a 40-year operational lifespan for a solar farm on a site encompassing approximately 109 hectares. The proposed development includes the installation of ground-mounted solar photovoltaic (PV) panels on steel frames accross the site. The project will incorporate 256 inverters arranged in a series string configuration, supported by 24 electrical skid hardstands that will house transformer units and a ring main unit facility. The development also entails the construction of a transformer compound to facilitate a connection to the existing 110kV Drumline Substation. An internal network cable will be installed to enable an under-the-fence connection from the on-site transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18 metre-high lightning monopole mast. Approximately 8.6 Kilometres of new and upgraded internal access tracks will be developed to provide connectivity within the site. Six new site entrances are proposed, including modification to existing junctions to accommodate construction access and the delivery of abnormal loads. These access points will connnect to Local Roads (L3166, Ballycar Road L3174 and L3136) and the Regional Road R458. All new entrances will link directly to the public road network. This application seeks approval for all associated site development and ancillary works necessary to support the successful delivery and operation of the proposed solar farm. A Natura Impact Statement will also be submitted to the Planning Authority with this application

Ballycar Lislea Killulla , Mogullaan & Crossagh Rathlaheen South , Culleen Drumline & Ballycasey Beg Co Clare

732m
2455CONDITIONAL21 Feb 2024

for development, the development consists of the construction of a slatted unit and associated site works

Ballycar , Newmarket-on-Fergus , Co Clare

806m
20425CONDITIONAL26 Jun 2020

to construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works

Ballycar , Newmarket-on-Fergus , Co Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?