211312

CONDITIONAL

Clare - Clare County Council

Proposed Development

for development of 46 no. residential units comprising of 1 no. five bedroom terrace dwelling, 27 no. four bedroom terrace dwellings, 3 no. three bedroom terrace dwellings, 9 no two bedroom townhouses, 5 no. two bedroom bungalow, all connections to water supply, public sewer and all ancillary site services and works required to facilitate the proposed development.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Dec 2021

  2. Further information requested

    10 Feb 2022

  3. Further information received

    13 May 2022

  4. Decision due

    22 Sept 2022

  5. Decision: CONDITIONAL

    22 Sept 2022

  6. Grant issued

    2 Nov 2022

Application Details

Location
Loughville , Lahinch Road , Ennis
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
46 sq m
Residential Units
46

Timeline

Registration Date
9 December 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
22 September 2022
Grant Date
2 November 2022
Permission Expires
1 November 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
2460106CONDITIONAL12 Mar 2024

a variation to previously approved Planning Permission Ref: P21/1312. The variation of design consists of changes to the site layout and the following residential units consisting of 10 no. 4 bedroom units, 26 no. 3 bedroom units and 2 no. 2 bedroom bungalows and associated site works and services

Loughville , Lahinch Road , Ennis Co. Clare

34m
2560297CONDITIONAL23 May 2025

for a variation of house designs, house nos. 31 to 34 inclusive, as previously granted under planning permission Ref: P24/60106

Loughville , Lahinch Road , Ennis Co. Clare

34m
2560228N/A29 Apr 2025

for a variation of house designs, house nos. 31 to 34 inclusive, as previously granted under planning permission Ref: P21/1312

Loughville , Lahinch Road , Ennis Co. Clare

94m
2360104N/A11 Apr 2023

for external alterations to elevations and to construct an extension to the creche and to provide an enclosed play area and bin compound together with associated site works and services at Creche

Acha Bhile Lahinch Road , Ennis , Co. Clare

107m
2460207CONDITIONAL14 May 2024

for change of use of vacant/unoccupied creche building to 4 no. 2 bedroomed 3 person apartment units, together with elevation changes, lobby extensions with enclosed bin storage, reconfiguration of existing car-parking layout to provide for private open space for 4 apartment units and to provide for bicycle parking and to carry out all associated and ancillary site works to facilitate the proposed development

Acha Bhile Loughville , Lahinch Road , Ennis Co. Clare

148m
26144N/A22 May 2026

of (a) a single storey extension to the rear, (b) an attic conversion, (c) first floor windows to both gables, (d) roof lights to the rear elevation. (e) minor elevation changes and (f) a detached shed and garage to the rear of the property

Lahinch Road , Loughvella , Ennis Co. Clare (V95 P2D8)

158m
2560191CONDITIONAL14 Apr 2025

for the construction of a single storey dwelling house, garage, ancillary site works and connection to public services

Loughville Lahinch Road , Ennis , Co. Clare

189m
181056CONDITIONAL20 Dec 2018

for development consisting of construction of a dormer bungalow dwelling house and associated site works

Acha Bhile , Lahinch Road , Ennis

189m
17632CONDITIONAL15 Aug 2017

for a development which will consist of the construction of a single storey dwelling house and associated site works

Acha Bhile , Lahinch Road , Ennis

196m
17568N/A24 Jul 2017

for development whcih will consist of the construction of a dwelling house, garage, connection to public servcies and ancillary works

Loughville , Ennis , Co Clare