211381
CONDITIONALMayo - Mayo County Council
Proposed Development
CHANGE OF USE OF PART OF EXISTING BUILDING TO RETAIL USE. PERMISSION IS ALSO SOUGHT FOR EXTERNAL SIGNAGE TO THE EXISTING FRONT ELEVATION AS SHOWN ON PLANS AND ALL ANCILLARY SITE DEVELOPMENTS
View the full application file on the council's planning portal →Application Timeline
Application received
22 Dec 2021
Decision: CONDITIONAL
17 Feb 2022
Decision due
24 Feb 2022
Grant issued
23 Mar 2022
Application Details
- Location
- BUNREE INDUSTRIAL ESTATE , ABBEYHALFQUARTER , BALLINA
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
Timeline
- Registration Date
- 22 December 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 17 February 2022
- Grant Date
- 23 March 2022
- Permission Expires
- 22 March 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of a single storey extension to the side of the existing dwelling house and for all associated site works on this site.
107 Greenhills Estate , Ballina , Co Mayo
Planning permission for development consisting of the following (1) Change of use from existing light industrial (P02/2256 Refers) to recreational/Leisure facility (2) building signage to front elevation (3) Amend existing car parking and provide bicycle parking, (4) and the carrying out of all associated ancillary site works at Abbeyhalfquarter, I.D.A. Industrial Estate, Bunree, Ballina, Co. Mayo.
Abbeyhalfquarter , IDA Industrial Estate , Bunree Ballina Co. Mayo
Construction of a new steel framed commercial unit measuring 3,323 sq.m. together with associated on-site car parking and connection to public foul and stormwater sewer and all other associated site development works
Bunree Industrial Estate , Abbeyhalfquarter , Ballina
CONSTRUCTION OF AN EXTENSION TO AN EXISTING INDUSTRIAL UNIT AND FOR RETENTION OF SIGNAGE TO THE FRONT OF THE EXISTING BUILDING
UNIT 4 BUNREE INDUSTRIAL ESTATE , BUNREE ROAD , BALLINA
Construct single storey extension to the eastern side elevation and to carry out ancillary site works
28 Greenhill Estate , Ballina , Co Mayo
Construct an extension of 119.23sqm to commercial unit currently under construction, (which was granted permission previously under P16/673) for sorting recyclable materials with a revised site layout, together with all associated site works
Abbeyhalfquarter , IDA Industrial Estate , Bunree
REVISE SITE BOUNDARIES AND TO RETAIN THE FOLLOWING ALTERATIONS TO THE DEVELOPMENT WHICH WAS PREVIOUSLY GRANTED PERMISSION UNDER P16/673 AND P19/1002, THE ALTERATIONS TO BE RETAINED ARE: RETAIN EXISTING FENCING, RETAIN EXTERNAL STORAGE AREAS, RETAIN MINOR ALTERATIONS TO INTERNAL OFFICE LAYOUT AND ELEVATIONS, RETAIN LANDSCAPING BERM, RETAIN ACCESS BARRIER LOCATION, RETAIN MINOR ALTERATIONS TO PARKING LAYOUT, TOGETHER WITH ALL ASSOCIATED SITE WORKS
IDA INDUSTRIAL ESTATE , BUNREE , BALLINA
to a) Subdivide the property into 2 separate properties, b) Create a new entrance and c) retain 3 number ancillary buildings on site along with all associated site works
Bunree Industrial Estate , Abbeyhalfquarter , Ballina Co. Mayo
an extension and alterations to an existing house at 6 Greenhills estate, Ballina, Co Mayo
6 Greenhills Estate , Ballina , Co Mayo
Full planning permission for the following: 1. The demolition of the existing Sean Duffy Community Centre 2. The construction of a new proposed community centre and sports facility ancillary to Ardnaree Sarsfields sport pitch 3. The provision of new carpark, all this together with connection to services and all associated site works
Abbeyhalfquarter , Ballina , Co.Mayo.
Planning a project of your own?
Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.
Do I Need Permission?