211491
CONDITIONALTipperary - Tipperary County Council
Proposed Development
Construction of a dwelling house, garage, entrance, driveway and all associated site works.
View the full application file on the council's planning portal →Application Timeline
Application received
8 Oct 2021
Further information requested
1 Dec 2021
Further information received
14 Apr 2022
Decision: CONDITIONAL
4 May 2022
Decision due
11 May 2022
Grant issued
7 Jun 2022
Application Details
- Location
- The Green , Fethard , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Floor Area
- 238.2 sq m
- Residential Units
- 2
Timeline
- Registration Date
- 8 October 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 May 2022
- Grant Date
- 7 June 2022
- Permission Expires
- 6 June 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
an extension to the rear of our existing dwelling including associated site works
6 Green Street Lower , Fethard , Co. Tipperary
to construct a one and a half storey extension to the rear of our dwelling including minor modifications to the existing dwelling and all associated site development works
8 Lower Green , Fethard , Co. Tipperary
the demolition of existing rear extension, construction of a two storey extension to rear of dwelling, relocation of front door and modifications to existing dwelling along with all associated site development works
Lower Green Street , Fethard , Co. Tipperary
construction of a single-storey granny flat and store to the side and rear of my dwelling and all associated site development works
Upper Green Street , Fethard , Co. Tipperary
a construction of 2 no. semi-detached, 3-bedroom, dormer dwelling houses, including all associated site works
Green Street/Upper Green Street , Fethard , Co. Tipperary
Full planning permission for the following: a) To demolish 3 no dwellings (in ruin) b) To construct a terrace building consisting of 3 no. 2 bed dwelling units with boundary walls c) Permission for 4 no carparking spaces with realigned public footpath and all ancillary works. And connections to existing public services and all associated sitework and ancillary works
Strylea , Fethard , Co. Tipperary
as built first floor and a single storey extension to the rear of existing dwelling with associated site works
Cois Teallaigh , The Green , Fethard. Co.Tipperary
as built first floor extension and permission for a single storey extension to the rear of existing dwelling with associated site works
Cois Teallaigh , The Green , Fethard Co.Tipperary
residential development consisting of 59 number two-storey units comprising of a mixture of the following houses types; Type A: two-storey three bed unit of 99 sq.m and Type B: two-storey four bed of 111 sq.m. These house types are varied within proposed blocks of semi-detached and terraced units, Permission is also sought for a new vehicular entrance onto the Cloneen Road, connection to the Local Authority foul and surface water sewers and pubic water mains, together with all associated site development works necessary to facilitate the development. Previous permission 06/302 under clause (A) Section 42 (1A) (a) (V)
Cloneen Road , Fethard , Co Tipperary
construction of new single storey extension to rear, alterations to existing house, new vehicular entrance and associated site boundary and site development works
Abbey Street , Fethard , Co.Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?