2116
N/ACarlow - Carlow County Council
Proposed Development
Permission for a development to include a solar farm on an area of approximately 17.6 hectares, comprising photovoltaic panels on ground mounted frames, 1 no. onsite 38kV substation, 10. no single storey inverter/transformer stations, security fencing, a palisade double security gate, 2 no. storage containers, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operational period of 40 years). The planning application is accompanied with a Natura Impact Statement.
View the full application file on the council's planning portal →Application Details
- Location
- Ardnehue and Friarstown ,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Carlow County Council
Timeline
- Registration Date
- 26 January 2021
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for a development to include a solar farm on an area of approximately 17.6 hectares, comprising photovoltaic panels on ground mounted frames, 1 no. onsite 38kV substation, 10 no. single storey inverter/transformer stations, security fencing, a palisade double security gate, 2 no. storage containers, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed solar farm to have planning permission that is effective for 10 years (an an operational period of 40 years). A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the planning application
Ardnehue , and Friarstown , County Carlow
for proposed works to include a solar and storage park on an area of approximately 68.8 hectares, comprising linear arrays of solar photovoltaic panels mounted on steel supported structures with associated cabling and ducting (including cable connection to the proposed onsite 110 kV tail fed substation), 50 inverter substations, a storage park (including 30 no. containers with battery cells, transformers and power conversion units), perimeter fencing, 8 no. palisade double security gates, 3 no. temporary construction compound/material storage areas, 6 no. steel storage containers, 17 no. turning bays, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed development to have planning permission that is effective for 10 years (and an operational period of 40 years). A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning Authority with the Planning Application.
Townlands of Ardenhue & Friarstown , Co. Carlow
for proposed works to include a solar and storate park on a an area of approximately 68.8 hectares, comprising linear arrays of solar photovoltaic panels mounted on steel supported sturctures with associated cabling and ducting (including cable connection to the proposed onsite 110 kV tail fed substation), 50 inverter substations, storage park (including 30 no. containers with battery cells, transformers and power conversion units), perimeter fencing, 8 no. palisade double security gates, 3 no. temporary construction compound/ material storage areas, 6 no. steel storage containers, 17 no. turning bays, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed development to have planning permission that is effective for 10 years (and an operational period of 40 years). A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the planning application.
Ardnehue and Friarstown , Co. Carlow
construct a part two storey part single storey dwelling, single storey garage, new entrance off existing access lane, septic tank and percolation area, bored well and all associated site works
Ardnehue , Bennekerry , Co. Carlow
for proposed works which will include a solar farm on an area of approximately 27.0 hectares, comprising photovoltaic panels on ground mounted frames, 1 No., onsite 38kV substation, an energy storage system (4 No. units), 10 No. single storey inverter/transformer stations, security fencing, a palisade double security gate, 2 No. storage containers, CCTV, a temporary construction stage wheelwash system and all ancillary development works. Elgin Energy Services Ltd are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operational period of 35 years). The planning application incudes a Natura Impact Statement
Friarstown , Killerig , Co. Carlow
the construction of a single storey extension to the rear elevation of existing dwelling and all associated site works
Ardnehue , Bennekerry , Co. Carlow
a single storey sunroom to the rear of existing single storey dwelling and all associated site works
Friarstown , Bennekerry , Co. Carlow
the change of use of an existing adjoining single storey domestic shed to use as habitable part of our existing dwelling, retention permission for the construction of a domestic shed and all associated site works
Friarstown , Co. Carlow , Co. Carlow
a single storey extension to the side and rear of existing one and a half storey dwelling, with alterations to external façade including additional dormer windows, internal alterations, use of existing onsite services, existing entrance and all associated site works
Ardnehue , Bennekerry , Co Carlow
to construct a part single storey, part two storey dwelling, detached single storey double garage, new entrance off existing laneway, bored well, waste water treatment system, percolation area and all associated site works
Friarstown , Co. Carlow
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.