211602
CONDITIONALLimerick - Limerick County Council
Proposed Development
dwelling house, site entrance, wastewater treatment system and associated site works and services
View the full application file on the council's planning portal →Application Timeline
Application received
19 Nov 2021
Further information requested
18 Jan 2022
Further information received
30 May 2022
Decision: CONDITIONAL
23 Jun 2022
Decision due
26 Jun 2022
Grant issued
27 Jul 2022
Application Details
- Location
- Ballylin , Shanagolden , Co. Limerick
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
- Floor Area
- 202.8 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 19 November 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 23 June 2022
- Grant Date
- 27 July 2022
- Permission Expires
- 26 July 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
proposed extensions to existing house, consisting of, front porch, kitchen/lounge, and dining area with internal changes to existing house and connections to all existing services
Kilbradran , Shanagolden , Co. Limerick.
a dwelling house, wastewater treatment system, percolation area, site entrance and all associated site works
Graigoor , Shanagolden , Co. Limerick
planning ref. 22/388 for a dwelling house, wastewater treatment system, percolation area, site entrance and all associated site works
Graigoor , Shanagolden , Co. Limerick
construction of a replacement dwelling by converting and extending existing stone farm outbuildings, retain existing substandard derelict dwelling as a fuel store, onsite waste water treatment and disposal system and upgrade existing entrance and all associated works
Kilbradran , Shanagolden , Co. Limerick
Extension of Permission from Planning Ref No: 12/464 (demolition of existing dwelling and construction of a replacement dwelling, waste water treatment system, percolation area and all ancillary works)
Lisbawn , Shanagolden
a dwelling house, wastewater treatment system, percolation area, access road, site entrance and all associated site works
Lissatotan , Rathkeale , Co. Limerick.
construction of a new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site works
Kilbradran , Shanagolden , Co. Limerick.
a ground floor extension consisting of a kitchen/dining, bathroom and a lobby together with an attic store, a ground floor extension consisting of a bedroom and ensuite together with an attic store, a ground floor extension consisting of a porch, the provision of 4 no. dormer windows to the rear of the dwelling, the provision of a storage shed and the modification of the existing vehicular entrance together with associated site works
Lisbane , Shanagolden , Co. Limerick
making modifications to existing dwelling including an extension to the side and rear of the existing dwelling and all associated site works
Kilbradran , Shanagolden , Co. Limerick.
six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind turbines and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-site substation to the existing Carrons substation to the west of the site. Grid Connection Option B: Loop into the existing 38kV onsite overhead line via the proposed 38kV substation. A new temporary site entrance off the L1219 local road to the west of the permanent site entrance for the construction phase only. Upgrade of an existing farm entrance and access track off the L1219 local road in the northwest of the site to serve as a permanent site entrance for the wind farm when operational. Approximately 3.4km of new site access tracks with associated turning areas and drainage. This includes approximately 490m of temporary access tracks which will be reinstated following construction. Upgrade of approximately 470m of existing site access tracks. A 9m-long clear span bridge crossing of the Ahacronane River by an internal site access track to the northwest of turbine T1 and an associated 1.5m x 1.0m relief culvert. A permanent meteorological mast with a height of 90m, a foundation and hardstand. Two (2) material storage areas with a total capacity of approximately 39,300m3. A temporary construction compound with an area of approximately 1,375m2. All associated site development works, including drainage, diversion or undergrounding of low voltage powerlines, landscaping and revegetation. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) which have been prepared in respect of the construction, operation and decommissioning of the proposed development, and works to facilitate turbine delivery from the port of Foynes to the wind farm site entrance via L6188, N69, L1222, L1220 and L1219. The Applicant is seeking a 10-year planning permission and 35-year operational life, initiating from the date of full commissioning of the entire wind farm. This development is covered by the provisions of the Renewable Energy Directive III (Directiv
within the townlands of Ballynisky Graigoor Ballyegny More Kilbradran Ballysteen Dunmoylan , Carrons and Lisbane , Co. Limerick
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?